[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"q-1261202":3},{"question":4,"library":26},{"id":5,"libraryId":6,"type":7,"typeLabel":8,"stem":9,"options":10,"answer":22,"analysis":25},1261202,844,1,"单选题","作业开始第一次吊重物时，应在吊离地面（ ）mm时停止，检查倒链制动情况，确认完好后方可正式作业,露天作业时，应设防雨措施，保证电机、电控等安全。",[11,15,18,21],{"key":12,"text":13,"correct":14},"A","50",false,{"key":16,"text":17,"correct":14},"B","60",{"key":19,"text":20,"correct":14},"C","80",{"key":22,"text":23,"correct":24},"D","100",true,"作业开始第一次吊重物时，应在吊离地面100mm时停止，检查倒链制动情况，确认完好后方可正式作业,露天作业时，应设防雨措施，保证电机、电控等安全。",{"id":6,"name":27,"category":28,"favorite":29},"(装饰施工)专业管理实务 岗位知识","建筑工程",0]