[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"q-1261177":3},{"question":4,"library":26},{"id":5,"libraryId":6,"type":7,"typeLabel":8,"stem":9,"options":10,"answer":22,"analysis":25},1261177,844,1,"单选题","施工成本受多种因素影响而发生变动，作为项目经理应将成本分析的重点放在（ ）的因素上。",[11,15,18,21],{"key":12,"text":13,"correct":14},"A","外部市场经济",false,{"key":16,"text":17,"correct":14},"B","业主项目管理",{"key":19,"text":20,"correct":14},"C","项目自身特殊",{"key":22,"text":23,"correct":24},"D","内部经营管理",true,"施工成本受多种因素影响而发生变动，作为项目经理应将成本分析的重点放在内部经营管理的因素上。",{"id":6,"name":27,"category":28,"favorite":29},"(装饰施工)专业管理实务 岗位知识","建筑工程",0]