[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"q-1261172":3},{"question":4,"library":29},{"id":5,"libraryId":6,"type":7,"typeLabel":8,"stem":9,"options":10,"answer":27,"analysis":28},1261172,844,2,"多选题","影响工程成本的因素很多，主要有（ ）。",[11,15,18,21,24],{"key":12,"text":13,"correct":14},"A","政策法规性因素",true,{"key":16,"text":17,"correct":14},"B","地区性与市场性因素",{"key":19,"text":20,"correct":14},"C","设计因素",{"key":22,"text":23,"correct":14},"D","施工因素",{"key":25,"text":26,"correct":14},"E","人员素质因素","ABCDE","判断题1.建设工程项目施工成本管理应从工程施工开始，直至项目竣工结算完成为止，贯穿于项目实施的全过程。【答案】错误",{"id":6,"name":30,"category":31,"favorite":32},"(装饰施工)专业管理实务 岗位知识","建筑工程",0]