[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"q-1261150":3},{"question":4,"library":30},{"id":5,"libraryId":6,"type":7,"typeLabel":8,"stem":9,"options":10,"answer":28,"analysis":29},1261150,844,2,"多选题","下列关于分部分项工程成本分析的表述正确的是（ ）。",[11,15,19,22,25],{"key":12,"text":13,"correct":14},"A","分部分项工程成本分析的对象是拟完成的分部分项工程",false,{"key":16,"text":17,"correct":18},"B","分析的方法是进行预算成本、目标成本和实际成本的“三算”对比",true,{"key":20,"text":21,"correct":18},"C","预算成本来自投标报价成本",{"key":23,"text":24,"correct":18},"D","目标成本来自施工预算",{"key":26,"text":27,"correct":14},"E","施工成本分析的基本方法包括比较法、统计分析法、等价计算法、比率法等","BCD","分析的方法是进行预算成本、目标成本和实际成本的“三算”对比；目标成本来自施工预算；目标成本来自施工预算。",{"id":6,"name":31,"category":32,"favorite":33},"(装饰施工)专业管理实务 岗位知识","建筑工程",0]