[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"q-1261145":3},{"question":4,"library":30},{"id":5,"libraryId":6,"type":7,"typeLabel":8,"stem":9,"options":10,"answer":28,"analysis":29},1261145,844,2,"多选题","施工项目成本核算的第一个基本环节是按照规定的成本开支范围，分阶段地对施工费用进行归集，计算出施工费用的额定发生额和实际发生额，核算所提供的各种成本信息，（ ），作为反馈信息指导下一步成本控制。",[11,15,18,21,25],{"key":12,"text":13,"correct":14},"A","是成本预测、成本计划的结果",true,{"key":16,"text":17,"correct":14},"B","是成本计划、成本控制的结果",{"key":19,"text":20,"correct":14},"C","又成为成本分析和成本考核等环节的依据",{"key":22,"text":23,"correct":24},"D","又成为成本分析和成本计划等环节的依据",false,{"key":26,"text":27,"correct":24},"E","又成为成本计划和成本考核等环节的依据","ABC","核算所提供的各种成本信息，是成本预测、成本计划的结果、是成本计划、成本控制的结果、又成为成本分析和成本考核等环节的依据，作为反馈信息指导下一步成本控制。",{"id":6,"name":31,"category":32,"favorite":33},"(装饰施工)专业管理实务 岗位知识","建筑工程",0]