[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"q-1261141":3},{"question":4,"library":30},{"id":5,"libraryId":6,"type":7,"typeLabel":8,"stem":9,"options":10,"answer":28,"analysis":29},1261141,844,2,"多选题","施工成本计划是确定和编制施工项目在计划期内的（ ）等的书面方案。",[11,15,19,22,25],{"key":12,"text":13,"correct":14},"A","生产费用",true,{"key":16,"text":17,"correct":18},"B","预算成本",false,{"key":20,"text":21,"correct":18},"C","固定成本",{"key":23,"text":24,"correct":14},"D","成本水平",{"key":26,"text":27,"correct":18},"E","可变成本","AD","施工成本计划是确定和编制施工项目在计划期内的生产费用、成本水平等的书面方案。",{"id":6,"name":31,"category":32,"favorite":33},"(装饰施工)专业管理实务 岗位知识","建筑工程",0]