[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"q-1261129":3},{"question":4,"library":30},{"id":5,"libraryId":6,"type":7,"typeLabel":8,"stem":9,"options":10,"answer":28,"analysis":29},1261129,844,2,"多选题","分包工程成本核算要求包括（ ）。",[11,15,19,22,25],{"key":12,"text":13,"correct":14},"A","包清工工程，纳入人工费一外包人工费内核算",true,{"key":16,"text":17,"correct":18},"B","对机械作业分包产值统计的范围，不仅统计分包费用，还包括物耗价值",false,{"key":20,"text":21,"correct":18},"C","部分分项分包工程，纳入结构件费内核算",{"key":23,"text":24,"correct":14},"D","双包工程，是指将整幢建筑物以包工包料的形式分包给外单位施工的工程。可根据承包合同取费情况和发包（双包）合同支付情况，即上下合同差，测足目标盈利率",{"key":26,"text":27,"correct":18},"E","以收定支，人为调节成本","AD","分包工程成本核算要求包括包清工工程，纳入人工费一外包人工费内核算；双包工程，是指将整幢建筑物以包工包料的形式分包给外单位施工的工程。可根据承包合同取费情况和发包（双包）合同支付情况，即上下合同差，测足目标盈利率。",{"id":6,"name":31,"category":32,"favorite":33},"(装饰施工)专业管理实务 岗位知识","建筑工程",0]