[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"q-1261105":3},{"question":4,"library":26},{"id":5,"libraryId":6,"type":7,"typeLabel":8,"stem":9,"options":10,"answer":12,"analysis":25},1261105,844,1,"单选题","衡量成本降低的实际成果，并对成本指标完成情况进行总结和评价的是（ ）。",[11,15,19,22],{"key":12,"text":13,"correct":14},"A","施工成本考核",true,{"key":16,"text":17,"correct":18},"B","施工成本计划",false,{"key":20,"text":21,"correct":18},"C","施工成本预测",{"key":23,"text":24,"correct":18},"D","施工成本核算","施工成本考核衡量成本降低的实际成果，并对成本指标完成情况进行总结和评价。",{"id":6,"name":27,"category":28,"favorite":29},"(装饰施工)专业管理实务 岗位知识","建筑工程",0]