[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"q-1261095":3},{"question":4,"library":26},{"id":5,"libraryId":6,"type":7,"typeLabel":8,"stem":9,"options":10,"answer":22,"analysis":25},1261095,844,1,"单选题","项目经理部对作业队分包成本的控制，不包括（ ）。",[11,15,18,21],{"key":12,"text":13,"correct":14},"A","作业队成本的节约或超支",false,{"key":16,"text":17,"correct":14},"B","工程量和劳动定额的控制",{"key":19,"text":20,"correct":14},"C","钟点工的控制",{"key":22,"text":23,"correct":24},"D","对作业队的奖罚",true,"项目经理部对作业队分包成本的控制包括：作业队成本的节约或超支、工程量和劳动定额的控制、钟点工的控制等。",{"id":6,"name":27,"category":28,"favorite":29},"(装饰施工)专业管理实务 岗位知识","建筑工程",0]