[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"q-1260879":3},{"question":4,"library":19},{"id":5,"libraryId":6,"type":7,"typeLabel":8,"stem":9,"options":10,"answer":13,"analysis":9},1260879,844,3,"判断题","流水施工是指所有的施工过程均按一定的时间间隔依次投入施工，各个施工过程陆续开工、陆续竣工，使同一施工过程的施工班组保持连续、均衡施工，不同施工过程尽可能平行搭接施工的组织方式。",[11,15],{"key":12,"text":13,"correct":14},"A","正确",true,{"key":16,"text":17,"correct":18},"B","错误",false,{"id":6,"name":20,"category":21,"favorite":22},"(装饰施工)专业管理实务 岗位知识","建筑工程",0]