[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"q-1260867":3},{"question":4,"library":30},{"id":5,"libraryId":6,"type":7,"typeLabel":8,"stem":9,"options":10,"answer":28,"analysis":29},1260867,844,2,"多选题","抹灰工程验收中，属于主控项目的有（ ）",[11,15,18,21,25],{"key":12,"text":13,"correct":14},"A","抹灰前基层表面的尘土、污垢、油渍等应清除干净，并应洒水润湿",true,{"key":16,"text":17,"correct":14},"B","一般抹灰所用材料的品种和性能应符合设计要求。水泥的凝结时间和安定性复验应合格。砂浆的配合比应符合设计要求",{"key":19,"text":20,"correct":14},"C","抹灰层与基层之间及各抹灰层之间必须粘结牢固，抹灰层应无脱层、空鼓，面层应无爆灰和裂缝",{"key":22,"text":23,"correct":24},"D","普通抹灰表面应光滑、洁净、接槎平整，分格缝应清晰",false,{"key":26,"text":27,"correct":24},"E","高级抹灰表面应光滑、洁净、颜色均匀、无抹纹，分格缝和灰线应清晰美观","ABC","抹灰工程质量验收标准中，主控项目：A抹灰前基层表面的尘土、污垢、油渍等应清除干净，并应洒水润湿。B一般抹灰所用材料的品种和性能应符合设计要求。C抹灰工程应分层进行。D抹灰层与基层之间及各抹灰层之间必须粘结牢固，抹灰层应无脱层、空鼓，面层应无爆灰和裂缝。",{"id":6,"name":31,"category":32,"favorite":33},"(装饰施工)专业管理实务 岗位知识","建筑工程",0]