[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"q-1260769":3},{"question":4,"library":19},{"id":5,"libraryId":6,"type":7,"typeLabel":8,"stem":9,"options":10,"answer":13,"analysis":9},1260769,844,3,"判断题","分部（分项）工程作业计划是以某些主要的新结构、技术复杂的或缺乏施工经验的分部（分项）工程为对象编制的，直接指导现场施工的专项方案。",[11,15],{"key":12,"text":13,"correct":14},"A","正确",true,{"key":16,"text":17,"correct":18},"B","错误",false,{"id":6,"name":20,"category":21,"favorite":22},"(装饰施工)专业管理实务 岗位知识","建筑工程",0]