[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"lib-843-5":3},{"library":4,"page":9,"limit":10,"total":11,"questions":12,"related":595},{"id":5,"name":6,"category":7,"favorite":8},843,"(装饰施工)基础知识","建筑工程",0,5,50,1446,[13,34,45,57,69,81,93,104,112,124,136,148,157,167,177,189,199,211,223,235,246,258,270,282,294,305,313,325,337,349,361,373,385,397,409,421,433,442,451,463,475,487,499,511,523,535,547,559,571,583],{"id":14,"libraryId":5,"type":15,"typeLabel":16,"stem":17,"options":18,"answer":24,"analysis":33},1259401,1,"单选题","内墙面层刮大白腻子一般不少于（ ）遍。",[19,23,27,30],{"key":20,"text":21,"correct":22},"A","1",false,{"key":24,"text":25,"correct":26},"B","2",true,{"key":28,"text":29,"correct":22},"C","3",{"key":31,"text":32,"correct":22},"D","4","",{"id":35,"libraryId":5,"type":15,"typeLabel":16,"stem":36,"options":37,"answer":31,"analysis":33},1259402,"门窗套饰面板一般采用胶合板（切片板呈旋片板），厚度不小于（ ）mm（也可采用其他贴面板材），颜色、花纹要尽量相似。",[38,40,42,44],{"key":20,"text":39,"correct":22},"10",{"key":24,"text":41,"correct":22},"5",{"key":28,"text":43,"correct":22},"8",{"key":31,"text":29,"correct":26},{"id":46,"libraryId":5,"type":15,"typeLabel":16,"stem":47,"options":48,"answer":24,"analysis":33},1259403,"塑钢彩板门窗安装工艺流程（ ）。",[49,51,53,55],{"key":20,"text":50,"correct":22},"划线定位→塑钢门窗披水安装→塑钢门窗安装→防腐处理→门窗扇及玻璃的安装→嵌门窗四缝→安装五金配件",{"key":24,"text":52,"correct":26},"划线定位→塑钢门窗披水安装→防腐处理→塑钢门窗安装→嵌门窗四缝→门窗扇及玻璃的安装→安装五金配件",{"key":28,"text":54,"correct":22},"划线定位→塑钢门窗披水安装→塑钢门窗安装→防腐处理→嵌门窗四缝→门窗扇及玻璃的安装→安装五金配件",{"key":31,"text":56,"correct":22},"划线定位→塑钢门窗披水安装→防腐处理→塑钢门窗安装→门窗扇及玻璃的安装→嵌门窗四缝→安装五金配件",{"id":58,"libraryId":5,"type":15,"typeLabel":16,"stem":59,"options":60,"answer":24,"analysis":33},1259404,"吊顶用的玻璃应进行自身重力荷载下的变形设计计算，可采用弹性力学方法进行计算。对于边框支承玻璃板，其挠度限制不应超过（ ）。",[61,63,65,67],{"key":20,"text":62,"correct":22},"1mm",{"key":24,"text":64,"correct":26},"2mm",{"key":28,"text":66,"correct":22},"3mm",{"key":31,"text":68,"correct":22},"4mm",{"id":70,"libraryId":5,"type":15,"typeLabel":16,"stem":71,"options":72,"answer":24,"analysis":33},1259405,"不属于楼面、地面的组成分的是（ ）。",[73,75,77,79],{"key":20,"text":74,"correct":22},"面层",{"key":24,"text":76,"correct":26},"中层",{"key":28,"text":78,"correct":22},"垫层",{"key":31,"text":80,"correct":22},"基层",{"id":82,"libraryId":5,"type":15,"typeLabel":16,"stem":83,"options":84,"answer":24,"analysis":33},1259406,"轻钢龙骨纸面石膏板吊顶次龙骨间距应准确、均衡，按石膏板模数确定，保证石膏板两端固定在次龙骨上。石膏板板长边接缝处应增加横撑龙骨，横撑龙骨用水平件连接，并与通长次龙骨固定。当采用2440mm×1220mm石膏板时，次龙骨间距不宜为（ ）。",[85,87,89,91],{"key":20,"text":86,"correct":22},"300mm",{"key":24,"text":88,"correct":26},"375mm",{"key":28,"text":90,"correct":22},"400nm",{"key":31,"text":92,"correct":22},"600mm",{"id":94,"libraryId":5,"type":15,"typeLabel":16,"stem":95,"options":96,"answer":20,"analysis":33},1259407,"铺竹地板时靠墙的一块板应离开墙面（ ）mm左右，以后逐块排紧。",[97,98,100,102],{"key":20,"text":39,"correct":26},{"key":24,"text":99,"correct":22},"15",{"key":28,"text":101,"correct":22},"20",{"key":31,"text":103,"correct":22},"25",{"id":105,"libraryId":5,"type":15,"typeLabel":16,"stem":106,"options":107,"answer":24,"analysis":33},1259408,"花木地板铺装后，刨光、磨光的次数应为（ ）次，刨去的厚度应小于1.5mm。",[108,109,110,111],{"key":20,"text":25,"correct":22},{"key":24,"text":29,"correct":26},{"key":28,"text":21,"correct":22},{"key":31,"text":41,"correct":22},{"id":113,"libraryId":5,"type":15,"typeLabel":16,"stem":114,"options":115,"answer":20,"analysis":33},1259409,"在给水排水的施工安装工程中，常用的材料主要有管材、附件、（ ）及辅助材料。",[116,118,120,122],{"key":20,"text":117,"correct":26},"阀门",{"key":24,"text":119,"correct":22},"截止阀",{"key":28,"text":121,"correct":22},"蝶阀",{"key":31,"text":123,"correct":22},"止回阀",{"id":125,"libraryId":5,"type":15,"typeLabel":16,"stem":126,"options":127,"answer":20,"analysis":33},1259410,"氯化聚乙烯（CP E）卷材地面完成后，常温条件下养护时间为（ ）。",[128,130,132,134],{"key":20,"text":129,"correct":26},"1～3d",{"key":24,"text":131,"correct":22},"5d",{"key":28,"text":133,"correct":22},"7d",{"key":31,"text":135,"correct":22},"10d",{"id":137,"libraryId":5,"type":15,"typeLabel":16,"stem":138,"options":139,"answer":20,"analysis":33},1259411,"PVC地板铺贴前，对基层的要求之一是（ ）。",[140,142,144,146],{"key":20,"text":141,"correct":26},"洁净、干燥、含水率小于8％",{"key":24,"text":143,"correct":22},"洁净、干燥、含水率小于12％",{"key":28,"text":145,"correct":22},"洁净、干燥、含水率小于15％",{"key":31,"text":147,"correct":22},"洁净、干燥、含水率小于18％",{"id":149,"libraryId":5,"type":15,"typeLabel":16,"stem":150,"options":151,"answer":31,"analysis":33},1259412,"石材出厂或安装前要做好（ ）面背涂防护，火烧板等毛面石材污染渗透后不易清理。",[152,153,154,155],{"key":20,"text":32,"correct":22},{"key":24,"text":29,"correct":22},{"key":28,"text":25,"correct":22},{"key":31,"text":156,"correct":26},"6",{"id":158,"libraryId":5,"type":15,"typeLabel":16,"stem":159,"options":160,"answer":24,"analysis":33},1259413,"铀面砖是窑制产品，本身尺寸存在轻微差别，为保证美观，要留有（ ）mm的砖缝。",[161,162,164,165],{"key":20,"text":21,"correct":22},{"key":24,"text":163,"correct":26},"1.5",{"key":28,"text":25,"correct":22},{"key":31,"text":166,"correct":22},"2.5",{"id":168,"libraryId":5,"type":15,"typeLabel":16,"stem":169,"options":170,"answer":28,"analysis":33},1259414,"根据设计图纸及门扇的开启方向，确定门框的安装位置，并把门框装人洞口，安装时采取防止门框变形的措施，无下框平开门应使两边框的下脚低于地面标高线，其高度差宜为30mm，带下框平开门或推拉门使下框低于地面标高线，其高度差宜为（ ）mm。然后将上框的一个固定片固定在墙体上，并调整门框的水平度、垂直度和直角度，并用木楔临时定位。其允许偏差应符合规定。",[171,172,174,175],{"key":20,"text":101,"correct":22},{"key":24,"text":173,"correct":22},"30",{"key":28,"text":39,"correct":26},{"key":31,"text":176,"correct":22},"50",{"id":178,"libraryId":5,"type":15,"typeLabel":16,"stem":179,"options":180,"answer":20,"analysis":33},1259415,"玻璃地弹簧门安装工艺流程为（ ）。",[181,183,185,187],{"key":20,"text":182,"correct":26},"划线定位→倒角处理→固定钢化玻璃→注玻璃胶封口→玻璃板对接→活动玻璃门扇安装→清理",{"key":24,"text":184,"correct":22},"划线定位→固定钢化玻璃→注玻璃胶封口→倒角处理→活动玻璃门扇安装→玻璃板对接→清理",{"key":28,"text":186,"correct":22},"划线定位→倒角处理→固定钢化玻璃→注玻璃胶封口→活动玻璃门扇安装→玻璃板对接→清理",{"key":31,"text":188,"correct":22},"划线定位→固定钢化玻璃→注玻璃胶封口→倒角处理→玻璃板对接→活动玻璃门扇安装→清理",{"id":190,"libraryId":5,"type":15,"typeLabel":16,"stem":191,"options":192,"answer":24,"analysis":33},1259416,"标准灰饼的大小为（ ）mm见方。",[193,194,195,197],{"key":20,"text":101,"correct":22},{"key":24,"text":176,"correct":26},{"key":28,"text":196,"correct":22},"100",{"key":31,"text":198,"correct":22},"200",{"id":200,"libraryId":5,"type":15,"typeLabel":16,"stem":201,"options":202,"answer":20,"analysis":33},1259417,"饰面砖粘贴工程一般适用于内墙面饰面粘贴工程和高度不大于（ ）m和抗震设防烈度不大于（ ）度、采用满粘法施工的外墙饰面砖粘贴工程。",[203,205,207,209],{"key":20,"text":204,"correct":26},"100、8",{"key":24,"text":206,"correct":22},"24、7",{"key":28,"text":208,"correct":22},"50、9",{"key":31,"text":210,"correct":22},"200、7",{"id":212,"libraryId":5,"type":15,"typeLabel":16,"stem":213,"options":214,"answer":20,"analysis":33},1259418,"现浇水磨石地面的石粒一般粒径为（ ）mm。",[215,217,219,221],{"key":20,"text":216,"correct":26},"6～15",{"key":24,"text":218,"correct":22},"5～10",{"key":28,"text":220,"correct":22},"6～12",{"key":31,"text":222,"correct":22},"5～18",{"id":224,"libraryId":5,"type":15,"typeLabel":16,"stem":225,"options":226,"answer":31,"analysis":33},1259419,"窗扇安装风钩，窗扇风钩应装在窗框下冒头与窗扇下冒头夹角外，使窗开启后成（ ）。",[227,229,231,233],{"key":20,"text":228,"correct":22},"30°",{"key":24,"text":230,"correct":22},"45°",{"key":28,"text":232,"correct":22},"60°",{"key":31,"text":234,"correct":26},"90°",{"id":236,"libraryId":5,"type":15,"typeLabel":16,"stem":237,"options":238,"answer":20,"analysis":33},1259420,"固定片的位置应距窗角、中竖框、中横框150～200mm，固定片之间的间距应小于或等于（ ）mm。",[239,241,242,244],{"key":20,"text":240,"correct":26},"500",{"key":24,"text":198,"correct":22},{"key":28,"text":243,"correct":22},"5000",{"key":31,"text":245,"correct":22},"250",{"id":247,"libraryId":5,"type":15,"typeLabel":16,"stem":248,"options":249,"answer":20,"analysis":33},1259421,"管道系统安装完后应进行综合水压试验。水压试验时应（ ），待水充满后进行加压。当压力升到规定值时，停止打压，认真检查整个管道系统，确认各处接口和阀门均无渗漏现象，再持续稳压到规定时间，观察其压力下降在允许范围内，并经有关人员验收认可后，填写好水压试验记录，办理交接手续。",[250,252,254,256],{"key":20,"text":251,"correct":26},"排净空气",{"key":24,"text":253,"correct":22},"检查管道",{"key":28,"text":255,"correct":22},"清理管道",{"key":31,"text":257,"correct":22},"放水",{"id":259,"libraryId":5,"type":15,"typeLabel":16,"stem":260,"options":261,"answer":24,"analysis":33},1259422,"用作吊顶的轻钢龙骨，龙骨壁厚为（ ）。",[262,264,266,268],{"key":20,"text":263,"correct":22},"0.4～0.6mm",{"key":24,"text":265,"correct":26},"0.5～1.5mm",{"key":28,"text":267,"correct":22},"1.5m～2.5mm",{"key":31,"text":269,"correct":22},"2.5～3.5mm",{"id":271,"libraryId":5,"type":15,"typeLabel":16,"stem":272,"options":273,"answer":24,"analysis":33},1259423,"镀膜玻璃应装在多层中空玻璃的（ ），单面镀膜层应朝向室内。",[274,276,278,280],{"key":20,"text":275,"correct":22},"最内层",{"key":24,"text":277,"correct":26},"最外层",{"key":28,"text":279,"correct":22},"第二层",{"key":31,"text":281,"correct":22},"第三层",{"id":283,"libraryId":5,"type":15,"typeLabel":16,"stem":284,"options":285,"answer":20,"analysis":33},1259424,"用（ ）复查墙面的平整度、垂直度。",[286,288,290,292],{"key":20,"text":287,"correct":26},"托线板",{"key":24,"text":289,"correct":22},"水平尺",{"key":28,"text":291,"correct":22},"垫尺",{"key":31,"text":293,"correct":22},"皮数杆",{"id":295,"libraryId":5,"type":15,"typeLabel":16,"stem":296,"options":297,"answer":31,"analysis":33},1259425,"将两门（窗）框与拼樘料卡接时，应用紧固件双向拧紧，其间距应不大于500mm，距两端间距不大于（ ）mm；紧固件端头及拼樘料与门（窗）框间的缝隙应采用嵌缝膏进行密封处理。",[298,299,301,303],{"key":20,"text":196,"correct":22},{"key":24,"text":300,"correct":22},"800",{"key":28,"text":302,"correct":22},"210",{"key":31,"text":304,"correct":26},"180",{"id":306,"libraryId":5,"type":15,"typeLabel":16,"stem":307,"options":308,"answer":24,"analysis":33},1259426,"根据设计图纸及门扇的开启方向，确定门框的安装位置，并把门框装人洞口，安装时采取防止门框变形的措施，无下框平开门应使两边框的下脚低于地面标高线，其高度差宜为（ ）mm,带下框平开门或推拉门使下框低于地面标高线，其高度差宜为10mm。然后将上框的一个固定片固定在墙体上，并调整门框的水平度、垂直度和直角度，并用木楔临时定位。其允许偏差应符合规定。",[309,310,311,312],{"key":20,"text":176,"correct":22},{"key":24,"text":173,"correct":26},{"key":28,"text":41,"correct":22},{"key":31,"text":101,"correct":22},{"id":314,"libraryId":5,"type":15,"typeLabel":16,"stem":315,"options":316,"answer":28,"analysis":33},1259427,"现浇水磨石地面的施工工艺流程为（ ）。",[317,319,321,323],{"key":20,"text":318,"correct":22},"基层处理（抹找平层）→磨光→弹线找规矩→设置分隔缝、分隔条→铺抹面层石粒浆→涂刷草酸出光→打蜡抛光→养护",{"key":24,"text":320,"correct":22},"基层处理（抹找平层）→弹线找规矩→设置分隔缝、分隔条→铺抹面层石粒浆→磨光→涂刷草酸出光→打蜡抛光→养护",{"key":28,"text":322,"correct":26},"基层处理（抹找平层）→弹线找规矩→设置分隔缝、分隔条→铺抹面层石粒浆→养护→磨光→涂刷草酸出光→打蜡抛光",{"key":31,"text":324,"correct":22},"基层处理（抹找平层）→磨光→弹线找规矩→设置分隔缝、分隔条→铺抹面层石粒浆→养护→涂刷草酸出光→打蜡抛光",{"id":326,"libraryId":5,"type":15,"typeLabel":16,"stem":327,"options":328,"answer":24,"analysis":33},1259428,"涂料类装饰装修施工工艺为（ ）。",[329,331,333,335],{"key":20,"text":330,"correct":22},"基层处理→打底子→磨光→刮腻子→施涂涂料→养护",{"key":24,"text":332,"correct":26},"基层处理→打底子→刮腻子→磨光→施涂涂料→养护",{"key":28,"text":334,"correct":22},"基层处理→打底子→施涂涂料→磨光→刮腻子→养护",{"key":31,"text":336,"correct":22},"基层处理→打底子→施涂涂料→刮腻子→磨光→养护",{"id":338,"libraryId":5,"type":15,"typeLabel":16,"stem":339,"options":340,"answer":24,"analysis":33},1259429,"施工项目控制的任务是进行以项目进度控制、质量控制、成本控制和安全控制为主要内容的四大目标控制。其中下列不属于与施工项目成果相关的是（ ）。",[341,343,345,347],{"key":20,"text":342,"correct":22},"进度控制",{"key":24,"text":344,"correct":26},"安全控制",{"key":28,"text":346,"correct":22},"质量控制",{"key":31,"text":348,"correct":22},"成本控制",{"id":350,"libraryId":5,"type":15,"typeLabel":16,"stem":351,"options":352,"answer":31,"analysis":33},1259430,"为了取得施工成本管理的理想效果，必须从多方面采取有效措施实施管理，这些措施不包括（ ）。",[353,355,357,359],{"key":20,"text":354,"correct":22},"组织措施",{"key":24,"text":356,"correct":22},"技术措施",{"key":28,"text":358,"correct":22},"经济措施",{"key":31,"text":360,"correct":26},"管理措施",{"id":362,"libraryId":5,"type":15,"typeLabel":16,"stem":363,"options":364,"answer":31,"analysis":33},1259431,"以下不属于施工项目管理内容的是（ ）。",[365,367,369,371],{"key":20,"text":366,"correct":22},"施工项目的生产要素管理",{"key":24,"text":368,"correct":22},"施工项目的合同管理",{"key":28,"text":370,"correct":22},"施工项目的信息管理",{"key":31,"text":372,"correct":26},"单体建筑的设计",{"id":374,"libraryId":5,"type":15,"typeLabel":16,"stem":375,"options":376,"answer":31,"analysis":33},1259432,"以下不属于施工项目安全控制措施的是（ ）。",[377,379,381,383],{"key":20,"text":378,"correct":22},"安全制度措施",{"key":24,"text":380,"correct":22},"安全组织措施",{"key":28,"text":382,"correct":22},"安全技术措施",{"key":31,"text":384,"correct":26},"安全行政措施",{"id":386,"libraryId":5,"type":15,"typeLabel":16,"stem":387,"options":388,"answer":24,"analysis":33},1259433,"下列选项中关于施工项目管理的特点说法错误的是（ ）。",[389,391,393,395],{"key":20,"text":390,"correct":22},"对象是施工项目",{"key":24,"text":392,"correct":26},"主体是建设单位",{"key":28,"text":394,"correct":22},"内容是按阶段变化的",{"key":31,"text":396,"correct":22},"要求强化组织协调工作",{"id":398,"libraryId":5,"type":15,"typeLabel":16,"stem":399,"options":400,"answer":20,"analysis":33},1259434,"下列性质中，不属于项目经理部的性质的是（ ）。",[401,403,405,407],{"key":20,"text":402,"correct":26},"法律强制性",{"key":24,"text":404,"correct":22},"相对独立性",{"key":28,"text":406,"correct":22},"综合性",{"key":31,"text":408,"correct":22},"临时性",{"id":410,"libraryId":5,"type":15,"typeLabel":16,"stem":411,"options":412,"answer":28,"analysis":33},1259435,"下列各项措施中，不属于施工项目质量控制的措施的是（ ）。",[413,415,417,419],{"key":20,"text":414,"correct":22},"提高管理、施工及操作人员自身素质",{"key":24,"text":416,"correct":22},"提高施工的质量管理水平",{"key":28,"text":418,"correct":26},"尽可能采用先进的施工技术、方法和新材料、新工艺、新技术，保证进度目标实现",{"key":31,"text":420,"correct":22},"加强施工项目的过程控制",{"id":422,"libraryId":5,"type":15,"typeLabel":16,"stem":423,"options":424,"answer":28,"analysis":33},1259436,"2013年2月，某公司研发生产中心工地在施工过程中发生支模架和正在浇筑的房屋板坍塌事故，导致13人死亡、16人受伤。经调查，造成此次事故的直接原因是支模架质量低劣。管理上的原因包括：（1）建设单位片面强调工程施工进度，而一些图纸的提供比较滞后，对施工单位违规施工有一定程度的影响；在没有领取施工许可证的情况下先行组织施工，整个工程边设计边施工。（2）施工单位支模架搭设人员均没有特种作业人员上岗证，支模架搭设不规范。（3）施工单位没有对搭设支模架使用的钢管和扣件进行严格的质量检查，使用的钢管、扣件缺乏质量保证书和检测报告等有效的质量证明文件。根据材料背景，回答下列问题。 特种作业人员，必须按照国家有关规定经过专门的安全作业培训，并取得特种作业操作（ ）后，方可上岗作业。",[425,427,429,431],{"key":20,"text":426,"correct":22},"结业证书",{"key":24,"text":428,"correct":22},"合格证",{"key":28,"text":430,"correct":26},"资格证书",{"key":31,"text":432,"correct":22},"培训证明",{"id":434,"libraryId":5,"type":15,"typeLabel":16,"stem":435,"options":436,"answer":28,"analysis":33},1259437,"下列各项措施中，不属于施工项目质量控制的措施是（ ）。",[437,439,440,441],{"key":20,"text":438,"correct":22},"提高管理、施工及操作人员的自身素质",{"key":24,"text":416,"correct":22},{"key":28,"text":418,"correct":26},{"key":31,"text":420,"correct":22},{"id":443,"libraryId":5,"type":15,"typeLabel":16,"stem":444,"options":445,"answer":28,"analysis":33},1259438,"下列措施中，不属于施工项目安全控制的措施的是（ ）。",[446,447,448,449],{"key":20,"text":354,"correct":22},{"key":24,"text":356,"correct":22},{"key":28,"text":360,"correct":26},{"key":31,"text":450,"correct":22},"制度措施",{"id":452,"libraryId":5,"type":15,"typeLabel":16,"stem":453,"options":454,"answer":31,"analysis":33},1259439,"以下关于施工项目经理部综合性的描述，错误的是（ ）。",[455,457,459,461],{"key":20,"text":456,"correct":22},"施工项目经理部是企业所属的经济组织，主要职责是管理施工项目的各种经济活动",{"key":24,"text":458,"correct":22},"施工项目经理部的管理职能是综合的，包括计划、组织、控制、协调、指挥等多方面",{"key":28,"text":460,"correct":22},"施工项目经理部的管理业务是综合的，从横向看包括人、财、物、生产和经营活动，从纵向看包括施工项目寿命周期的主要过程",{"key":31,"text":462,"correct":26},"施工项目经理部受企业多个职能部门的领导",{"id":464,"libraryId":5,"type":15,"typeLabel":16,"stem":465,"options":466,"answer":31,"analysis":33},1259440,"以下不属于施工项目安全组织措施的是（ ）。",[467,469,471,473],{"key":20,"text":468,"correct":22},"建立施工项目安全组织系统",{"key":24,"text":470,"correct":22},"建立与项目安全组织系统相配套的各专业、各部门、各生产岗位的安全责任系统",{"key":28,"text":472,"correct":22},"建立项目经理的安全生产职责及项目班子成员的安全生产职责",{"key":31,"text":474,"correct":26},"技术措施、合同措施、经济措施、信息管理措施等",{"id":476,"libraryId":5,"type":15,"typeLabel":16,"stem":477,"options":478,"answer":20,"analysis":33},1259441,"下列施工项目管理程序的排序正确的是（ ）。",[479,481,483,485],{"key":20,"text":480,"correct":26},"投标、签订合同→施工准备→施工→验收交工与结算→用后服务",{"key":24,"text":482,"correct":22},"施工准备→投标、签订合同→施工→验收交工与结算→用后服务",{"key":28,"text":484,"correct":22},"投标、签订合同→施工→施工准备→验收交工与结算→用后服务",{"key":31,"text":486,"correct":22},"投标、签订合同→施工准备→施工→用后服务→验收交工与结算",{"id":488,"libraryId":5,"type":15,"typeLabel":16,"stem":489,"options":490,"answer":28,"analysis":33},1259442,"以下关于施工项目管理组织形式的表述，错误的是（ ）。",[491,493,495,497],{"key":20,"text":492,"correct":22},"施工项目管理组织的形式是指在施工项目管理组织中处理管理层次、管理跨度、部门设置和上下级关系的组织结构的类型",{"key":24,"text":494,"correct":22},"施工项目主要的管理组织形式有工作队式、部门控制式、矩阵制式、事业部式等",{"key":28,"text":496,"correct":26},"部门控制式项目组织是指主要由企业中有关部门抽出管理力量组成施工项目经理部的方式",{"key":31,"text":498,"correct":22},"在施工项目实施过程中，应进行组织协调、沟通和处理好内部及外部的各种关系，排除各种干扰和障碍",{"id":500,"libraryId":5,"type":15,"typeLabel":16,"stem":501,"options":502,"answer":24,"analysis":33},1259444,"2013年2月，某公司研发生产中心工地在施工过程中发生支模架和正在浇筑的房屋板坍塌事故，导致13人死亡、16人受伤。经调查，造成此次事故的直接原因是支模架质量低劣。管理上的原因包括：（1）建设单位片面强调工程施工进度，而一些图纸的提供比较滞后，对施工单位违规施工有一定程度的影响；在没有领取施工许可证的情况下先行组织施工，整个工程边设计边施工。（2）施工单位支模架搭设人员均没有特种作业人员上岗证，支模架搭设不规范。（3）施工单位没有对搭设支模架使用的钢管和扣件进行严格的质量检查，使用的钢管、扣件缺乏质量保证书和检测报告等有效的质量证明文件。根据材料背景，回答下列问题。 根据《安全生产管理条例》规定，施工单位采购、租赁的安全防护用具、机械设备、施工机具及配件，应当具有生产（制造）许可证和（ ），并在进人施工现场前进行查验。",[503,505,507,509],{"key":20,"text":504,"correct":22},"生产厂家信息",{"key":24,"text":506,"correct":26},"产品合格证",{"key":28,"text":508,"correct":22},"使用标准",{"key":31,"text":510,"correct":22},"使用说明．",{"id":512,"libraryId":5,"type":15,"typeLabel":16,"stem":513,"options":514,"answer":31,"analysis":33},1259445,"以下不属于施工项目现场管理内容的是（ ）。",[515,517,519,521],{"key":20,"text":516,"correct":22},"建立施工现场管理组织",{"key":24,"text":518,"correct":22},"建立文明施工现场",{"key":28,"text":520,"correct":22},"及时清场转移",{"key":31,"text":522,"correct":26},"根据施工工程任务需要及时调整项目经理部",{"id":524,"libraryId":5,"type":15,"typeLabel":16,"stem":525,"options":526,"answer":24,"analysis":33},1259446,"以下不属于施工资源管理任务的是（ ）。",[527,529,531,533],{"key":20,"text":528,"correct":22},"确定资源类型及数量",{"key":24,"text":530,"correct":26},"设计施工现场平面图",{"key":28,"text":532,"correct":22},"编制资源进度计划",{"key":31,"text":534,"correct":22},"施工资源进度计划的执行和动态凋整",{"id":536,"libraryId":5,"type":15,"typeLabel":16,"stem":537,"options":538,"answer":20,"analysis":33},1259447,"项目过程控制中，加强专项检查，包括自检、（ ）、互检。",[539,541,543,545],{"key":20,"text":540,"correct":26},"专检",{"key":24,"text":542,"correct":22},"全检",{"key":28,"text":544,"correct":22},"交接检",{"key":31,"text":546,"correct":22},"质检",{"id":548,"libraryId":5,"type":15,"typeLabel":16,"stem":549,"options":550,"answer":28,"analysis":33},1259448,"下列措施中，不属于施工准备阶段的安全技术措施的是（ ）。",[551,553,555,557],{"key":20,"text":552,"correct":22},"技术准备",{"key":24,"text":554,"correct":22},"物资准备",{"key":28,"text":556,"correct":26},"资金准备",{"key":31,"text":558,"correct":22},"施工队伍准备",{"id":560,"libraryId":5,"type":15,"typeLabel":16,"stem":561,"options":562,"answer":28,"analysis":33},1259449,"下列关于施工项目管理组织的形式的说法中，错误的是（ ）。",[563,565,567,569],{"key":20,"text":564,"correct":22},"工作队式项目组织适用于大型项目，工期要求紧，要求多工种、多部门配合的项目",{"key":24,"text":566,"correct":22},"事业部式适用于大型经营型企业的工程承包",{"key":28,"text":568,"correct":26},"部门控制式项目组织一般适用于专业性强的大中型项目",{"key":31,"text":570,"correct":22},"矩阵制项目组织适用于同时承担多个需要进行项目管理工程的企业",{"id":572,"libraryId":5,"type":15,"typeLabel":16,"stem":573,"options":574,"answer":20,"analysis":33},1259450,"施工项目进度控制的措施主要有（ ）。",[575,577,579,581],{"key":20,"text":576,"correct":26},"组织措施、技术措施、合同措施、经济措施、信息管理措施等",{"key":24,"text":578,"correct":22},"管理措施、技术措施、经济措施",{"key":28,"text":580,"correct":22},"行政措施、技术措施、经济措施",{"key":31,"text":582,"correct":22},"政策措施、技术措施、经济措施",{"id":584,"libraryId":5,"type":15,"typeLabel":16,"stem":585,"options":586,"answer":24,"analysis":33},1259451,"施工项目目标控制包括：施工项目进度控制、施工项目质量控制、（ ）、施工项目安全控制四个方面。",[587,589,591,593],{"key":20,"text":588,"correct":22},"施工项目管理控制",{"key":24,"text":590,"correct":26},"施工项目成本控制",{"key":28,"text":592,"correct":22},"施工项目人力控制",{"key":31,"text":594,"correct":22},"施工项目物资控制",[596,599,602,605,608,611],{"id":15,"name":597,"category":7,"favorite":598},"领导干部任职前廉政法规知识测试题",92,{"id":600,"name":601,"category":7,"favorite":15},595,"建筑结构与设备",{"id":603,"name":604,"category":7,"favorite":15},715,"招标采购专业知识与法律法规",{"id":606,"name":607,"category":7,"favorite":15},848,"市政方向-通用基础",{"id":609,"name":610,"category":7,"favorite":8},534,"BIM工程师",{"id":612,"name":610,"category":7,"favorite":8},535]