[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"lib-843-4":3},{"library":4,"page":9,"limit":10,"total":11,"questions":12,"related":595},{"id":5,"name":6,"category":7,"favorite":8},843,"(装饰施工)基础知识","建筑工程",0,4,50,1446,[13,34,46,58,70,82,94,106,118,130,142,154,166,178,190,202,212,224,236,248,260,272,284,295,307,319,331,343,353,365,376,388,400,412,424,436,448,460,470,482,494,506,518,530,539,548,557,565,575,587],{"id":14,"libraryId":5,"type":15,"typeLabel":16,"stem":17,"options":18,"answer":24,"analysis":33},1259351,1,"单选题","建筑装饰专业制图中，被遮挡部分的轮廓线用（ ）表示。",[19,23,27,30],{"key":20,"text":21,"correct":22},"A","中粗实线",false,{"key":24,"text":25,"correct":26},"B","中粗虚线",true,{"key":28,"text":29,"correct":22},"C","细单点长画线",{"key":31,"text":32,"correct":22},"D","细点线","",{"id":35,"libraryId":5,"type":15,"typeLabel":16,"stem":36,"options":37,"answer":20,"analysis":33},1259352,"阳角及墙垛测量放线，（ ）做出标志。",[38,40,42,44],{"key":20,"text":39,"correct":26},"从上到下",{"key":24,"text":41,"correct":22},"从下到上",{"key":28,"text":43,"correct":22},"从左到右",{"key":31,"text":45,"correct":22},"从右到左",{"id":47,"libraryId":5,"type":15,"typeLabel":16,"stem":48,"options":49,"answer":20,"analysis":33},1259353,"梯段相邻踏步高差应不大于每踏步两端宽度差不大于（ ）mm。",[50,52,54,56],{"key":20,"text":51,"correct":26},"10",{"key":24,"text":53,"correct":22},"12",{"key":28,"text":55,"correct":22},"15",{"key":31,"text":57,"correct":22},"20",{"id":59,"libraryId":5,"type":15,"typeLabel":16,"stem":60,"options":61,"answer":20,"analysis":33},1259354,"陶瓷地砖要取得好的视觉效果，设计无要求时，排版一般采用（ ）。",[62,64,66,68],{"key":20,"text":63,"correct":26},"对称排版",{"key":24,"text":65,"correct":22},"非对称排版",{"key":28,"text":67,"correct":22},"任意排版",{"key":31,"text":69,"correct":22},"异形排版",{"id":71,"libraryId":5,"type":15,"typeLabel":16,"stem":72,"options":73,"answer":20,"analysis":33},1259355,"室内给水管道的水压试验必须符合设计要求。当设计未注明时，各种材质的给水管道系统试验压力均为工作压力的（ ）倍，但不得小于（ ）MP A",[74,76,78,80],{"key":20,"text":75,"correct":26},"1.5，0.6",{"key":24,"text":77,"correct":22},"0.6，1.5",{"key":28,"text":79,"correct":22},"1.5，0.7",{"key":31,"text":81,"correct":22},"1.5，1.5",{"id":83,"libraryId":5,"type":15,"typeLabel":16,"stem":84,"options":85,"answer":31,"analysis":33},1259356,"竹地板按结构分类有（ ）。",[86,88,90,92],{"key":20,"text":87,"correct":22},"双层胶合竹地板和多层胶合竹地板",{"key":24,"text":89,"correct":22},"单层胶合竹地板和五层胶合竹地板",{"key":28,"text":91,"correct":22},"单层胶合竹地板和双层胶合竹地板",{"key":31,"text":93,"correct":26},"单层胶合竹地板和多层胶合竹地板",{"id":95,"libraryId":5,"type":15,"typeLabel":16,"stem":96,"options":97,"answer":24,"analysis":33},1259357,"饰面板（砖）工程施工的环境条件应满足施工工艺的要求。环境温度及其所用材料温度的控制中不正确的要求是（ ）。",[98,100,102,104],{"key":20,"text":99,"correct":22},"采用掺有水泥的拌合料粘贴（或灌浆）时，即湿作业施工现场环境温度不应低于5℃",{"key":24,"text":101,"correct":26},"采用有机胶粘剂粘贴时，不宜低于20℃",{"key":28,"text":103,"correct":22},"如环境温度低于上述规定，应采取保证工程质量的有效措施",{"key":31,"text":105,"correct":22},"采用有机胶粘剂粘贴时，不宜低于10℃",{"id":107,"libraryId":5,"type":15,"typeLabel":16,"stem":108,"options":109,"answer":31,"analysis":33},1259358,"抹灰正确的工艺流程是（ ）。",[110,112,114,116],{"key":20,"text":111,"correct":22},"基层处理→弹线、找规矩→做标筋→做灰饼→抹门窗护角→抹底灰→抹中层灰→抹面层",{"key":24,"text":113,"correct":22},"弹线、找规矩→基层处理→做标筋→做灰饼→抹底灰→抹门窗护角→抹中层灰→抹面层",{"key":28,"text":115,"correct":22},"基层处理→弹线、找规矩→抹底灰做灰饼→→抹门窗护角→做标筋→抹中层灰→抹面层",{"key":31,"text":117,"correct":26},"基层处理→弹线、找规矩→做灰饼→做标筋→抹门窗护角→抹底灰→抹中层灰→抹面层。",{"id":119,"libraryId":5,"type":15,"typeLabel":16,"stem":120,"options":121,"answer":28,"analysis":33},1259359,"小规格板材，一般厚度小于20mm、边长不大于（ ）mm,可采用湿贴方法。",[122,124,126,128],{"key":20,"text":123,"correct":22},"40",{"key":24,"text":125,"correct":22},"60",{"key":28,"text":127,"correct":26},"400",{"key":31,"text":129,"correct":22},"600",{"id":131,"libraryId":5,"type":15,"typeLabel":16,"stem":132,"options":133,"answer":28,"analysis":33},1259360,"轻钢龙骨吊顶施工工艺流程为（ ）。",[134,136,138,140],{"key":20,"text":135,"correct":22},"弹线→安装主龙骨→安装次龙骨→吊杆安装→安装面板（安装灯具）→板缝处理",{"key":24,"text":137,"correct":22},"弹线→安装主龙骨→安装次龙骨→安装面板（安装灯具）→吊杆安装→板缝处理",{"key":28,"text":139,"correct":26},"弹线→吊杆安装→安装主龙骨→安装次龙骨→安装面板（安装灯具）→板缝处理",{"key":31,"text":141,"correct":22},"弹线→吊杆安装→安装面板（安装灯具）→安装主龙骨→安装次龙骨→板缝处理",{"id":143,"libraryId":5,"type":15,"typeLabel":16,"stem":144,"options":145,"answer":31,"analysis":33},1259361,"木门窗制作工艺流程为（ ）。",[146,148,150,152],{"key":20,"text":147,"correct":22},"配料、截料、刨料→凿眼→画线→起线→拉肩、开榫→拼装",{"key":24,"text":149,"correct":22},"配料、截料、刨料→凿眼→画线→拉肩、开榫→起线→拼装",{"key":28,"text":151,"correct":22},"配料、截料、刨料→画线→凿眼→起线→拉肩、开榫→拼装",{"key":31,"text":153,"correct":26},"配料、截料、刨料→画线→凿眼→拉肩、开榫→起线→拼装",{"id":155,"libraryId":5,"type":15,"typeLabel":16,"stem":156,"options":157,"answer":28,"analysis":33},1259362,"不符合石材干挂安装正确方法的是（ ）。",[158,160,162,164],{"key":20,"text":159,"correct":22},"大于25mm厚的石材干挂可以在侧面直接开槽",{"key":24,"text":161,"correct":22},"槽口的后面应留不小于8mm宽度，石材的重量靠这8mm的宽度同不锈钢挂件的紧密结合把重量传递给基层钢架",{"key":28,"text":163,"correct":26},"下一排石材安装好后，上一排石材安装应支放在下排石材上",{"key":31,"text":165,"correct":22},"石材的干挂每一块板的重量要靠各自的挂件承担，不可将力压向下一排，切不可将传统的砌砖工艺用在石材或玻化砖的干挂上",{"id":167,"libraryId":5,"type":15,"typeLabel":16,"stem":168,"options":169,"answer":31,"analysis":33},1259363,"下列吊顶中吸声效果最好的是（ ）。",[170,172,174,176],{"key":20,"text":171,"correct":22},"轻钢龙骨石膏吊顶",{"key":24,"text":173,"correct":22},"塑料扣板吊顶",{"key":28,"text":175,"correct":22},"铝扣板吊",{"key":31,"text":177,"correct":26},"矿棉板吊顶",{"id":179,"libraryId":5,"type":15,"typeLabel":16,"stem":180,"options":181,"answer":20,"analysis":33},1259364,"拼樘料与砖墙联接时，应先将拼樘料两端插人预留洞中，然后应用强度等级为（ ）的细石混凝土浇灌固定。",[182,184,186,188],{"key":20,"text":183,"correct":26},"C20",{"key":24,"text":185,"correct":22},"C30",{"key":28,"text":187,"correct":22},"C10",{"key":31,"text":189,"correct":22},"C50",{"id":191,"libraryId":5,"type":15,"typeLabel":16,"stem":192,"options":193,"answer":20,"analysis":33},1259365,"管道穿越墙洞、楼板洞应及时安放套管，并用（ ）水泥砂浆或细石混凝土填嵌密实；电线管、消火栓箱、配电箱安装完毕，并将背后露明部分钉好钢丝网；接线盒用纸堵严。",[194,196,198,200],{"key":20,"text":195,"correct":26},"1：3",{"key":24,"text":197,"correct":22},"3：1",{"key":28,"text":199,"correct":22},"1：1",{"key":31,"text":201,"correct":22},"2：3",{"id":203,"libraryId":5,"type":15,"typeLabel":16,"stem":204,"options":205,"answer":28,"analysis":33},1259366,"铝合金门窗横向或竖向组合时，宜采取套插，搭接宽度宜大于（ ）mm。",[206,207,209,210],{"key":20,"text":57,"correct":22},{"key":24,"text":208,"correct":22},"1",{"key":28,"text":51,"correct":26},{"key":31,"text":211,"correct":22},"3",{"id":213,"libraryId":5,"type":15,"typeLabel":16,"stem":214,"options":215,"answer":24,"analysis":33},1259367,"外墙砖的砖缝一般为（ ）mm。",[216,218,220,222],{"key":20,"text":217,"correct":22},"5～8",{"key":24,"text":219,"correct":26},"7～10",{"key":28,"text":221,"correct":22},"7～12",{"key":31,"text":223,"correct":22},"10～12",{"id":225,"libraryId":5,"type":15,"typeLabel":16,"stem":226,"options":227,"answer":20,"analysis":33},1259368,"抹灰工程所用的砂是平均粒径（ ）mm的中砂，砂颗粒要求坚硬洁净，不得含有黏土、草根、树叶、碱质及萁他有机物等有害物质。砂在使用前应根据使用要求过不同孔径的筛子，筛好备用。",[228,230,232,234],{"key":20,"text":229,"correct":26},"0.35～0.5",{"key":24,"text":231,"correct":22},"1.0～1.5",{"key":28,"text":233,"correct":22},"0.1～25",{"key":31,"text":235,"correct":22},"2～3",{"id":237,"libraryId":5,"type":15,"typeLabel":16,"stem":238,"options":239,"answer":24,"analysis":33},1259369,"混凝土强度、弹性模量符合设计要求是才能放松预应力筋。当日平均气温不低于20℃时，龄期不小于（ ）。",[240,242,244,246],{"key":20,"text":241,"correct":22},"3d",{"key":24,"text":243,"correct":26},"5d",{"key":28,"text":245,"correct":22},"7d",{"key":31,"text":247,"correct":22},"28d",{"id":249,"libraryId":5,"type":15,"typeLabel":16,"stem":250,"options":251,"answer":28,"analysis":33},1259370,"木龙骨吊顶施工工艺流程（ ）。",[252,254,256,258],{"key":20,"text":253,"correct":22},"弹线→木龙骨处理→龙骨架拼装→龙骨架整体调平→安装吊点紧固件→龙骨架吊装→压条安装→面板安装",{"key":24,"text":255,"correct":22},"弹线→木龙骨处理→龙骨架拼装→龙骨架整体调平→安装吊点紧固件→龙骨架吊装→面板安装→压条安装",{"key":28,"text":257,"correct":26},"弹线→木龙骨处理→龙骨架拼装→安装吊点紧固件→龙骨架吊装→龙骨架整体调平→面板安装→压条安装",{"key":31,"text":259,"correct":22},"弹线→木龙骨处理→龙骨架拼装→安装吊点紧固件→龙骨架吊装→龙骨架整体调平→压条安装→面板安装",{"id":261,"libraryId":5,"type":15,"typeLabel":16,"stem":262,"options":263,"answer":20,"analysis":33},1259371,"铝合金门窗安装工艺流程为（ ）。",[264,266,268,270],{"key":20,"text":265,"correct":26},"放线→安框→填缝、抹面→门窗扇安装→安装五金配件",{"key":24,"text":267,"correct":22},"放线→安框→门窗扇安装→填缝、抹面→安装五金配件",{"key":28,"text":269,"correct":22},"放线→安框→门窗扇安装→安装五金配件→填缝、抹面",{"key":31,"text":271,"correct":22},"放线→安框→安装五金配件→填缝、抹面→门窗扇安装",{"id":273,"libraryId":5,"type":15,"typeLabel":16,"stem":274,"options":275,"answer":28,"analysis":33},1259372,"分格条使用前要用（ ），以防止使用时变形。",[276,278,280,282],{"key":20,"text":277,"correct":22},"胶涂满",{"key":24,"text":279,"correct":22},"截断",{"key":28,"text":281,"correct":26},"水浸透",{"key":31,"text":283,"correct":22},"水泥砂浆固定",{"id":285,"libraryId":5,"type":15,"typeLabel":16,"stem":286,"options":287,"answer":28,"analysis":33},1259373,"门窗框与墙体安装缝隙的密封填充材料选用柔性材料时，应充满填塞缝隙。铝合金门窗框外侧和墙体室外二次粉刷间应留（ ）mm深槽口用建筑密封胶密实填缝。",[288,290,292,293],{"key":20,"text":289,"correct":22},"50～80",{"key":24,"text":291,"correct":22},"1～2",{"key":28,"text":217,"correct":26},{"key":31,"text":294,"correct":22},"15～25",{"id":296,"libraryId":5,"type":15,"typeLabel":16,"stem":297,"options":298,"answer":31,"analysis":33},1259374,"给水水平管道应有（ ）的坡度坡向泄水装置。",[299,301,303,305],{"key":20,"text":300,"correct":22},"2％～5％",{"key":24,"text":302,"correct":22},"2%～5‰",{"key":28,"text":304,"correct":22},"5‰～10‰",{"key":31,"text":306,"correct":26},"5%～10%",{"id":308,"libraryId":5,"type":15,"typeLabel":16,"stem":309,"options":310,"answer":20,"analysis":33},1259375,"找平层宜选用中粗砂，其含泥量及有机杂质都有明确规定：（ ）。",[311,313,315,317],{"key":20,"text":312,"correct":26},"含泥量不大于3％，有机杂质不大于0.5%",{"key":24,"text":314,"correct":22},"含泥量不大于5%，有机杂质不大于0.5%",{"key":28,"text":316,"correct":22},"含泥量不大于3，有机杂质不大于1％",{"key":31,"text":318,"correct":22},"含泥量不大于5％，有机杂质不大于1%",{"id":320,"libraryId":5,"type":15,"typeLabel":16,"stem":321,"options":322,"answer":31,"analysis":33},1259376,"整体面层含（ ）。",[323,325,327,329],{"key":20,"text":324,"correct":22},"砖面层",{"key":24,"text":326,"correct":22},"地毯面层",{"key":28,"text":328,"correct":22},"卷材面层",{"key":31,"text":330,"correct":26},"涂料面层",{"id":332,"libraryId":5,"type":15,"typeLabel":16,"stem":333,"options":334,"answer":28,"analysis":33},1259377,"搁栅式木面层地面施工工艺流程为（ ）。",[335,337,339,341],{"key":20,"text":336,"correct":22},"基层清理→弹线定位→安装木搁栅→铺毛地板→打磨→铺面层地板→安装踢脚板→油漆→打蜡",{"key":24,"text":338,"correct":22},"基层清理→弹线定位→铺毛地板→打磨→铺面层地板→安装木搁栅→安装踢脚板→油漆→打蜡",{"key":28,"text":340,"correct":26},"基层清理→弹线定位→安装木搁栅→铺毛地板→铺面层地板→打磨→安装踢脚板→油漆→打蜡",{"key":31,"text":342,"correct":22},"基层清理→弹线定位→铺毛地板→打磨→安装木搁栅→铺面层地板→安装踢脚板→油漆→打蜡",{"id":344,"libraryId":5,"type":15,"typeLabel":16,"stem":345,"options":346,"answer":31,"analysis":33},1259378,"排水塑料管必须按设计要求及位置装设伸缩节。如设计无要求时，伸缩节间距不得大于（ ）m。",[347,348,350,351],{"key":20,"text":208,"correct":22},{"key":24,"text":349,"correct":22},"2",{"key":28,"text":211,"correct":22},{"key":31,"text":352,"correct":26},"4",{"id":354,"libraryId":5,"type":15,"typeLabel":16,"stem":355,"options":356,"answer":20,"analysis":33},1259379,"陶瓷地砖楼地面施工工艺流程为（ ）。",[357,359,361,363],{"key":20,"text":358,"correct":26},"基层处理（抹找平层）→弹线找规矩→做灰饼、冲筋→试饼→铺贴地砖→压平、拔缝→镶贴踢脚板",{"key":24,"text":360,"correct":22},"基层处理（抹找平层）→弹线找规矩→做灰饼、冲筋→铺贴地砖→压平、拔缝→试饼→镶贴踢脚板",{"key":28,"text":362,"correct":22},"基层处理（抹找平层）→弹线找规矩→做灰饼、冲筋→铺贴地砖→试饼→压平、拔缝→镶贴踢脚板",{"key":31,"text":364,"correct":22},"基层处理（抹找平层）→弹线找规矩→做灰饼、冲筋→压平、拔缝→试饼→铺贴地砖→镶贴踢脚板",{"id":366,"libraryId":5,"type":15,"typeLabel":16,"stem":367,"options":368,"answer":28,"analysis":33},1259380,"PVC壁纸裱糊施工工艺流程为（ ）。",[369,371,373,375],{"key":20,"text":370,"correct":22},"基层处理→弹线→预拼→封闭底涂一道→裁纸、编号→润纸→刷胶→上墙裱糊→修整表面→养护",{"key":24,"text":372,"correct":22},"基层处理→弹线→预拼→裁纸、编号→润纸→刷胶→封闭底涂一道→上墙裱糊→修整表面→养护",{"key":28,"text":374,"correct":26},"基层处理→封闭底涂一道→弹线→预拼→裁纸、编号→润纸→刷胶→上墙裱糊→修整表面→养护",{"key":31,"text":372,"correct":22},{"id":377,"libraryId":5,"type":15,"typeLabel":16,"stem":378,"options":379,"answer":31,"analysis":33},1259381,"木门窗安装施工工艺流程为（ ）。",[380,382,384,386],{"key":20,"text":381,"correct":22},"找规矩弹线→安装门窗框→安装门窗扇→掩扇→门窗框嵌缝→安装五金配件→成品保护",{"key":24,"text":383,"correct":22},"找规矩弹线→安装门窗框→门窗框嵌缝→安装门窗扇→掩扇→安装五金配件→成品保护",{"key":28,"text":385,"correct":22},"找规矩弹线→掩扇→安装门窗框→安装门窗扇→门窗框嵌缝→安装五金配件→成品保护",{"key":31,"text":387,"correct":26},"找规矩弹线→掩扇→安装门窗框→门窗框嵌缝→安装门窗扇→安装五金配件→成品保护",{"id":389,"libraryId":5,"type":15,"typeLabel":16,"stem":390,"options":391,"answer":20,"analysis":33},1259382,"门窗洞口墙体厚度方向的预埋铁件中心线，如设计无规定时，距内墙面：38～60系列为（ ）mm,90～100系列为150mm。",[392,394,396,398],{"key":20,"text":393,"correct":26},"100",{"key":24,"text":395,"correct":22},"200",{"key":28,"text":397,"correct":22},"300",{"key":31,"text":399,"correct":22},"500",{"id":401,"libraryId":5,"type":15,"typeLabel":16,"stem":402,"options":403,"answer":20,"analysis":33},1259383,"用石材防护剂对石材背面及侧面进行涂刷处理，石材含水率应小于（ ）。",[404,406,408,410],{"key":20,"text":405,"correct":26},"8%",{"key":24,"text":407,"correct":22},"4％",{"key":28,"text":409,"correct":22},"12％",{"key":31,"text":411,"correct":22},"20％",{"id":413,"libraryId":5,"type":15,"typeLabel":16,"stem":414,"options":415,"answer":24,"analysis":33},1259384,"双层龙骨吊顶时，吊杆常用（ ）钢筋。",[416,418,420,422],{"key":20,"text":417,"correct":22},"φ4或φ6",{"key":24,"text":419,"correct":26},"φ6或φ8",{"key":28,"text":421,"correct":22},"φ8或φ10",{"key":31,"text":423,"correct":22},"φ10或φ12",{"id":425,"libraryId":5,"type":15,"typeLabel":16,"stem":426,"options":427,"answer":20,"analysis":33},1259385,"涂饰地面的基础是（ ）。",[428,430,432,434],{"key":20,"text":429,"correct":26},"水泥砂浆地面",{"key":24,"text":431,"correct":22},"现浇水磨石地面",{"key":28,"text":433,"correct":22},"陶瓷地砖地面",{"key":31,"text":435,"correct":22},"石材地面",{"id":437,"libraryId":5,"type":15,"typeLabel":16,"stem":438,"options":439,"answer":24,"analysis":33},1259386,"底层地面的基本构造包括（ ）。",[440,442,444,446],{"key":20,"text":441,"correct":22},"基础、垫层、找平层、隔离层（防潮层）、结合层、面层",{"key":24,"text":443,"correct":26},"基土、垫层、找平层、隔离层（防潮层）、结合层、面层",{"key":28,"text":445,"correct":22},"基层、垫层、找平层、隔离层（防潮层）、结合层、面层",{"key":31,"text":447,"correct":22},"防水层、垫层、找平层、隔离层（防潮层）、结合层、面层",{"id":449,"libraryId":5,"type":15,"typeLabel":16,"stem":450,"options":451,"answer":31,"analysis":33},1259387,"以下抹灰所用配合比正确的是（ ）。",[452,454,456,458],{"key":20,"text":453,"correct":22},"连接处和缝隙应用1:1水泥砂浆",{"key":24,"text":455,"correct":22},"连接处和缝隙应用3：1水泥砂浆",{"key":28,"text":457,"correct":22},"6：1：1水泥混合砂浆分层嵌塞密实",{"key":31,"text":459,"correct":26},"1：1：6水泥混合砂浆分层嵌塞密实",{"id":461,"libraryId":5,"type":15,"typeLabel":16,"stem":462,"options":463,"answer":24,"analysis":33},1259388,"当吊顶内需要设置永久性马道时，马道应单独吊挂在建筑承重结构上，宽度不宜小于（ ）mm,上空高度应满足维修人员通道的要求，两边应设防护栏杆。",[464,465,466,468],{"key":20,"text":397,"correct":22},{"key":24,"text":399,"correct":26},{"key":28,"text":467,"correct":22},"1000",{"key":31,"text":469,"correct":22},"1200",{"id":471,"libraryId":5,"type":15,"typeLabel":16,"stem":472,"options":473,"answer":20,"analysis":33},1259389,"半硬质聚氯乙烯地板分为（ ）。",[474,476,478,480],{"key":20,"text":475,"correct":26},"A.半硬质塑料地板砖和半硬质聚氯乙烯（PV C）地板",{"key":24,"text":477,"correct":22},"环氧地板砖和半硬质聚氯乙烯（PV地板",{"key":28,"text":479,"correct":22},"活动地板和PVA地板",{"key":31,"text":481,"correct":22},"活动地板和橡胶地板",{"id":483,"libraryId":5,"type":15,"typeLabel":16,"stem":484,"options":485,"answer":28,"analysis":33},1259390,"面板装饰施工工艺流程为（ ）。",[486,488,490,492],{"key":20,"text":487,"correct":22},"处理墙面→安装收口线条→制作、固定木骨架→弹线→安装木饰面板",{"key":24,"text":489,"correct":22},"处理墙面→制作、固定木骨架→弹线→安装木饰面板→安装收口线条",{"key":28,"text":491,"correct":26},"处理墙面→弹线→制作、固定木骨架→安装木饰面板→安装收口线条",{"key":31,"text":493,"correct":22},"处理墙面→弹线→安装收口线条→制作、固定木骨架→安装木饰面板",{"id":495,"libraryId":5,"type":15,"typeLabel":16,"stem":496,"options":497,"answer":20,"analysis":33},1259391,"铝合金板与夹心层的剥离强度标准值应大于（ ）。",[498,500,502,504],{"key":20,"text":499,"correct":26},"7N\u002Fmm",{"key":24,"text":501,"correct":22},"12N\u002Fmm",{"key":28,"text":503,"correct":22},"1N\u002Fmm",{"key":31,"text":505,"correct":22},"3N\u002Fmm",{"id":507,"libraryId":5,"type":15,"typeLabel":16,"stem":508,"options":509,"answer":31,"analysis":33},1259392,"操作比较简单，但对基层或底板的平整度要求较高的软包墙面具体做法为（ ）。",[510,512,514,516],{"key":20,"text":511,"correct":22},"预制铺贴填充法",{"key":24,"text":513,"correct":22},"预制铺贴镶嵌法",{"key":28,"text":515,"correct":22},"间接铺贴法",{"key":31,"text":517,"correct":26},"直接铺贴法",{"id":519,"libraryId":5,"type":15,"typeLabel":16,"stem":520,"options":521,"answer":24,"analysis":33},1259393,"活动地板从结构上讲（ ）。",[522,524,526,528],{"key":20,"text":523,"correct":22},"只有梁式活动地板",{"key":24,"text":525,"correct":26},"既有梁式活动地板，又有无梁式的活动地板",{"key":28,"text":527,"correct":22},"仅有无梁式的活动地板",{"key":31,"text":529,"correct":22},"满地铺地板",{"id":531,"libraryId":5,"type":15,"typeLabel":16,"stem":532,"options":533,"answer":31,"analysis":33},1259394,"混凝土与轻质砌块墙体交接处均应加钉（ ）mm宽钢丝网。",[534,535,537,538],{"key":20,"text":393,"correct":22},{"key":24,"text":536,"correct":22},"150",{"key":28,"text":399,"correct":22},{"key":31,"text":395,"correct":26},{"id":540,"libraryId":5,"type":15,"typeLabel":16,"stem":541,"options":542,"answer":24,"analysis":33},1259395,"铝合金门窗洞口墙体厚度方向的预埋铁件中心线，如设计无规定时，距内墙面：38～60系列为100mm，90～100系列为（ ）mm。",[543,544,545,546],{"key":20,"text":57,"correct":22},{"key":24,"text":536,"correct":26},{"key":28,"text":393,"correct":22},{"key":31,"text":547,"correct":22},"50",{"id":549,"libraryId":5,"type":15,"typeLabel":16,"stem":550,"options":551,"answer":24,"analysis":33},1259396,"保温薄抹灰施工中，用2m靠尺检查墙体的平整度，最大偏差大于（ ）mm时，应用1：3的水泥砂浆找平。",[552,553,554,556],{"key":20,"text":208,"correct":22},{"key":24,"text":352,"correct":26},{"key":28,"text":555,"correct":22},"8",{"key":31,"text":57,"correct":22},{"id":558,"libraryId":5,"type":15,"typeLabel":16,"stem":559,"options":560,"answer":31,"analysis":33},1259397,"窗洞墙体室内外二次粉刷（装饰）不应超过铝合金门窗框边（ ）mm。",[561,562,563,564],{"key":20,"text":208,"correct":22},{"key":24,"text":555,"correct":22},{"key":28,"text":51,"correct":22},{"key":31,"text":211,"correct":26},{"id":566,"libraryId":5,"type":15,"typeLabel":16,"stem":567,"options":568,"answer":20,"analysis":33},1259398,"副框固定后.在洞口内外侧用水泥砂浆等抹至副框与主框接触面平，当外侧抹灰时应用片材将抹灰层与门窗框临时隔开，其厚度为（ ）mm。待外抹灰层硬化后，撤去片材，预留出宽度为5mm、深度为6mm的嵌缝槽，待门窗固定后，用中性硅酮密封胶密封门窗外框边缘与副框间隙及嵌缝槽处。",[569,571,572,573],{"key":20,"text":570,"correct":26},"5",{"key":24,"text":51,"correct":22},{"key":28,"text":57,"correct":22},{"key":31,"text":574,"correct":22},"18",{"id":576,"libraryId":5,"type":15,"typeLabel":16,"stem":577,"options":578,"answer":31,"analysis":33},1259399,"饰面板安装工程一般适用于内墙面安装和高度不大于（ ）m、抗震设防烈度不大于（ ）度的外墙饰面板安装工程。",[579,581,583,585],{"key":20,"text":580,"correct":22},"99、7",{"key":24,"text":582,"correct":22},"45、9",{"key":28,"text":584,"correct":22},"50、9",{"key":31,"text":586,"correct":26},"24、7",{"id":588,"libraryId":5,"type":15,"typeLabel":16,"stem":589,"options":590,"answer":31,"analysis":33},1259400,"门窗框料有顺弯时，其弯度一般不应超过（ ）mm。",[591,592,593,594],{"key":20,"text":208,"correct":22},{"key":24,"text":349,"correct":22},{"key":28,"text":211,"correct":22},{"key":31,"text":352,"correct":26},[596,599,602,605,608,611],{"id":15,"name":597,"category":7,"favorite":598},"领导干部任职前廉政法规知识测试题",92,{"id":600,"name":601,"category":7,"favorite":15},595,"建筑结构与设备",{"id":603,"name":604,"category":7,"favorite":15},715,"招标采购专业知识与法律法规",{"id":606,"name":607,"category":7,"favorite":15},848,"市政方向-通用基础",{"id":609,"name":610,"category":7,"favorite":8},534,"BIM工程师",{"id":612,"name":610,"category":7,"favorite":8},535]