[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"lib-843-16":3},{"library":4,"page":9,"limit":10,"total":11,"questions":12,"related":736},{"id":5,"name":6,"category":7,"favorite":8},843,"(装饰施工)基础知识","建筑工程",0,16,50,1446,[13,38,53,68,83,98,113,128,142,157,172,187,202,216,230,244,258,272,286,300,314,329,343,357,371,385,399,414,428,442,456,471,486,500,514,528,543,555,569,583,597,608,622,636,650,664,678,693,707,722],{"id":14,"libraryId":5,"type":15,"typeLabel":16,"stem":17,"options":18,"answer":36,"analysis":37},1259954,2,"多选题","变更设计图，通常包括（ ）等方面内容。",[19,23,27,30,33],{"key":20,"text":21,"correct":22},"A","变更立面图",false,{"key":24,"text":25,"correct":26},"B","变更位置",true,{"key":28,"text":29,"correct":26},"C","变更原因",{"key":31,"text":32,"correct":22},"D","施工单位变更理由",{"key":34,"text":35,"correct":26},"E","变更内容","BCE","",{"id":39,"libraryId":5,"type":15,"typeLabel":16,"stem":40,"options":41,"answer":52,"analysis":37},1259955,"下列关于建筑装饰图的编排顺序原则描述正确的是（ ）。",[42,44,46,48,50],{"key":20,"text":43,"correct":26},"表现性图样在前，技术性图样在后",{"key":24,"text":45,"correct":26},"装饰施工图在前，配套设备施工图在后",{"key":28,"text":47,"correct":26},"基本图在前，详图在后",{"key":31,"text":49,"correct":26},"先施工的在前，后施工的在后",{"key":34,"text":51,"correct":22},"成品施工图在前，半成品施工图在后","ABCD",{"id":54,"libraryId":5,"type":15,"typeLabel":16,"stem":55,"options":56,"answer":67,"analysis":37},1259956,"下列属于装饰立面图的绘制步骤与方法是（ ）。",[57,59,61,63,65],{"key":20,"text":58,"correct":26},"选比例，定画幅",{"key":24,"text":60,"correct":22},"画出主体结构的主要造型轮廓线",{"key":28,"text":62,"correct":22},"画出主体结构次要轮廓线、标注尺寸、剖面符号、详图索引符号、文字说明等",{"key":31,"text":64,"correct":26},"墙面的主要造型轮廓线用中实线表示",{"key":34,"text":66,"correct":26},"次要的轮廓线如装饰线、浮雕图案等用细实线表示","ADE",{"id":69,"libraryId":5,"type":15,"typeLabel":16,"stem":70,"options":71,"answer":82,"analysis":37},1259957,"图样上的尺寸包括（ ）。",[72,74,76,78,80],{"key":20,"text":73,"correct":26},"尺寸界线",{"key":24,"text":75,"correct":26},"尺寸线",{"key":28,"text":77,"correct":26},"尺寸起止符号",{"key":31,"text":79,"correct":22},"轮廓线",{"key":34,"text":81,"correct":26},"尺寸数字","ABCE",{"id":84,"libraryId":5,"type":15,"typeLabel":16,"stem":85,"options":86,"answer":97,"analysis":37},1259958,"装饰节点详图的比例常采用（ ）。",[87,89,91,93,95],{"key":20,"text":88,"correct":26},"1:1",{"key":24,"text":90,"correct":26},"1:2",{"key":28,"text":92,"correct":22},"1:3",{"key":31,"text":94,"correct":26},"1:5",{"key":34,"text":96,"correct":26},"1:10","ABDE",{"id":99,"libraryId":5,"type":15,"typeLabel":16,"stem":100,"options":101,"answer":112,"analysis":37},1259959,"下列说法中属于地面铺装图示内容的是（ ）。",[102,104,106,108,110],{"key":20,"text":103,"correct":26},"建筑平面基本结构和尺寸",{"key":24,"text":105,"correct":22},"地面绿化形式和位置",{"key":28,"text":107,"correct":26},"室内外地面的平面形状和位置",{"key":31,"text":109,"correct":26},"装饰结构与地面布置的尺寸标注",{"key":34,"text":111,"correct":26},"必要的文字说明","ACDE",{"id":114,"libraryId":5,"type":15,"typeLabel":16,"stem":115,"options":116,"answer":127,"analysis":37},1259960,"一套完整的装饰施工图除基本图外通常还有（ ）。",[117,119,121,123,125],{"key":20,"text":118,"correct":22},"装饰工程图",{"key":24,"text":120,"correct":26},"图纸目录",{"key":28,"text":122,"correct":26},"效果图",{"key":31,"text":124,"correct":26},"主材表",{"key":34,"text":126,"correct":22},"地面基础结构图","BCD",{"id":129,"libraryId":5,"type":15,"typeLabel":16,"stem":130,"options":131,"answer":52,"analysis":37},1259961,"轻钢龙骨纸面石膏板吊顶主龙骨壁厚允许偏差为（ ）mm。",[132,134,136,138,140],{"key":20,"text":133,"correct":26},"±0.04",{"key":24,"text":135,"correct":26},"±0.05",{"key":28,"text":137,"correct":26},"±0.06",{"key":31,"text":139,"correct":26},"±0.07",{"key":34,"text":141,"correct":22},"±0.08",{"id":143,"libraryId":5,"type":15,"typeLabel":16,"stem":144,"options":145,"answer":156,"analysis":37},1259962,"木门窗制作时确定宽度和厚度的加工余量，一面刨光者留（ ）mm，两面刨光者留（ ）mm。",[146,148,150,152,154],{"key":20,"text":147,"correct":26},"3",{"key":24,"text":149,"correct":22},"4",{"key":28,"text":151,"correct":26},"5",{"key":31,"text":153,"correct":22},"6",{"key":34,"text":155,"correct":22},"7","AC",{"id":158,"libraryId":5,"type":15,"typeLabel":16,"stem":159,"options":160,"answer":171,"analysis":37},1259963,"板面受到风荷载作用，板面会上下浮动，吊杆通常是用（ ）的钢筋制作的。",[161,163,165,167,169],{"key":20,"text":162,"correct":26},"φ6",{"key":24,"text":164,"correct":22},"φ4",{"key":28,"text":166,"correct":26},"φ8",{"key":31,"text":168,"correct":26},"φ10",{"key":34,"text":170,"correct":22},"φ5","ACD",{"id":173,"libraryId":5,"type":15,"typeLabel":16,"stem":174,"options":175,"answer":186,"analysis":37},1259964,"下列属于整体面层吊顶工程安装质量的允许偏差项目的是（ ）。",[176,178,180,182,184],{"key":20,"text":177,"correct":26},"表面平整度",{"key":24,"text":179,"correct":26},"接缝直线度",{"key":28,"text":181,"correct":26},"接缝高低差",{"key":31,"text":183,"correct":22},"接缝高低度",{"key":34,"text":185,"correct":22},"阴阳角方正","ABC",{"id":188,"libraryId":5,"type":15,"typeLabel":16,"stem":189,"options":190,"answer":201,"analysis":37},1259965,"瓷砖粘贴施工基层处理正确的方法包括（ ）。",[191,193,195,197,199],{"key":20,"text":192,"correct":22},"不同的材料相接处，应粘贴纸质绷带",{"key":24,"text":194,"correct":26},"镶贴饰面的基体表面应具有足够的稳定性和刚度，若为光面应进行凿毛处理，并用素水泥浆满刷一遍，再浇水湿润",{"key":28,"text":196,"correct":26},"对油污进行清洗，即先将表面尘土、污垢清扫干净，用10%火碱水将墙面的油污刷掉，随之用净水将碱冲净、晾干",{"key":31,"text":198,"correct":26},"若为毛面只需清洗，再用1：1水泥砂浆加丹利胶溶液30％+70％永拌和，甩成小拉毛，喷或用扫帚将砂浆甩至墙上",{"key":34,"text":200,"correct":26},"其甩点要均匀，终凝后浇水养护，直至水泥砂浆疙瘩全部粘到混凝土光面上，并有较高的强度，用手掰不动为止","BCDE",{"id":203,"libraryId":5,"type":15,"typeLabel":16,"stem":204,"options":205,"answer":186,"analysis":37},1259966,"下列关于水泥砂浆地面施工要点中正确的是（ ）。",[206,208,210,212,214],{"key":20,"text":207,"correct":26},"地面抹灰前，应先在四周墙上弹出一道水平基准线，作为确定水泥砂浆面层标高的依据",{"key":24,"text":209,"correct":26},"水平基准线做法是以设计地面标高为依据，在四周墙上弹出500mm作为水平基准线",{"key":28,"text":211,"correct":26},"水泥砂浆面层施工完毕后，要及时进行浇水养护，必要时可蓄水养护",{"key":31,"text":213,"correct":22},"水泥砂浆面层养护时间不少于3天",{"key":34,"text":215,"correct":22},"水泥砂浆面层强度等级不应小于35MPa",{"id":217,"libraryId":5,"type":15,"typeLabel":16,"stem":218,"options":219,"answer":52,"analysis":37},1259967,"吊顶工程常见的质量问题有（ ）。",[220,222,224,226,228],{"key":20,"text":221,"correct":26},"吊顶龙骨起拱不均匀",{"key":24,"text":223,"correct":26},"面层变形",{"key":28,"text":225,"correct":26},"板面开裂",{"key":31,"text":227,"correct":26},"龙骨间距不合要求",{"key":34,"text":229,"correct":22},"板面空鼓",{"id":231,"libraryId":5,"type":15,"typeLabel":16,"stem":232,"options":233,"answer":52,"analysis":37},1259968,"吊顶工程应对下列隐蔽工程项目进行验收：（ ）。",[234,236,238,240,242],{"key":20,"text":235,"correct":26},"吊顶内管道、设备的安装及水管试压",{"key":24,"text":237,"correct":26},"木龙骨防火、防腐处理",{"key":28,"text":239,"correct":26},"预埋件或拉结筋",{"key":31,"text":241,"correct":26},"吊杆安装、龙骨安装",{"key":34,"text":243,"correct":22},"乳胶漆厚度",{"id":245,"libraryId":5,"type":15,"typeLabel":16,"stem":246,"options":247,"answer":97,"analysis":37},1259969,"石板湿挂安装施工正确的方法是（ ）。",[248,250,252,254,256],{"key":20,"text":249,"correct":26},"灌浆：石材板墙面防空鼓是关键。施工时应充分湿润基层，在竖缝内15～20mm深的麻丝或泡沫塑料条，以防漏浆",{"key":24,"text":251,"correct":26},"灌注时，边灌边用橡皮锤轻轻敲出石板面或用短钢筋轻捣，使浇人砂浆排气",{"key":28,"text":253,"correct":22},"灌浆应分层分批进行，第一层浇筑高度为150～200mm，且不得超过石板高度2\u002F3；如发现石板外移错位，应立即拆除重新安装",{"key":31,"text":255,"correct":26},"第一次灌浆后待1～2h，等砂浆初凝后应检查一下是否有移动，确定无误后，进行第二层灌浆，第二层灌浆高度为200～300mm",{"key":34,"text":257,"correct":26},"待初凝后再灌第三层，第三层灌至低于板上口50～100mm处为止",{"id":259,"libraryId":5,"type":15,"typeLabel":16,"stem":260,"options":261,"answer":67,"analysis":37},1259970,"下列关于安装横撑龙骨施工要点正确的是（ ）。",[262,264,266,268,270],{"key":20,"text":263,"correct":26},"横撑龙骨由中、小龙骨截取",{"key":24,"text":265,"correct":22},"其方向与次龙骨平行",{"key":28,"text":267,"correct":22},"其方向与主龙骨垂直",{"key":31,"text":269,"correct":26},"装在罩面板的拼接处",{"key":34,"text":271,"correct":26},"地面与次龙骨平齐",{"id":273,"libraryId":5,"type":15,"typeLabel":16,"stem":274,"options":275,"answer":201,"analysis":37},1259971,"外墙面砖铺贴方法与内墙釉面砖铺贴方法的区别有（ ）。",[276,278,280,282,284],{"key":20,"text":277,"correct":22},"基层处理",{"key":24,"text":279,"correct":26},"调整抹灰厚度",{"key":28,"text":281,"correct":26},"贴灰饼设标筋",{"key":31,"text":283,"correct":26},"构造做法",{"key":34,"text":285,"correct":26},"勾缝",{"id":287,"libraryId":5,"type":15,"typeLabel":16,"stem":288,"options":289,"answer":52,"analysis":37},1259972,"瓷板（玻化砖）湿贴安装空鼓的主要原因包括（ ）。",[290,292,294,296,298],{"key":20,"text":291,"correct":26},"基层墙面的变形",{"key":24,"text":293,"correct":26},"水化反应时的缺水",{"key":28,"text":295,"correct":26},"基层未清理干净",{"key":31,"text":297,"correct":26},"水泥等粘结材料的质量不合格",{"key":34,"text":299,"correct":22},"施工时环境温度超过45℃",{"id":301,"libraryId":5,"type":15,"typeLabel":16,"stem":302,"options":303,"answer":112,"analysis":37},1259973,"关于木饰面的挂件安装方法中合理的是（ ）。",[304,306,308,310,312],{"key":20,"text":305,"correct":26},"木挂件的材料应为实木或优质多层板，厚度一般为12mm，中纤板和刨花板不可作挂件",{"key":24,"text":307,"correct":22},"木质、金属质等的挂扣件的安装挡距应不大于1000mm",{"key":28,"text":309,"correct":26},"钢、不锈钢、铝合金、复合高强型塑料等挂件、扣件的壁厚和强度等应符合所安装饰面重量的受力要求，并有一定的安全系数",{"key":31,"text":311,"correct":26},"所有木质、金属质地的挂件、扣件的一些受力方面的数据均需经过计算和确认，并应做相关的剥离试验和先期的样板安装试验。在取得可靠安全的安装方案后大面积施工",{"key":34,"text":313,"correct":26},"木质、金属质等的挂扣件的安装挡距应不大于400mm",{"id":315,"libraryId":5,"type":15,"typeLabel":16,"stem":316,"options":317,"answer":328,"analysis":37},1259974,"吊顶工程按照施工工艺的不同分为（ ）吊顶。",[318,320,322,324,326],{"key":20,"text":319,"correct":22},"木龙骨",{"key":24,"text":321,"correct":26},"暗龙骨",{"key":28,"text":323,"correct":22},"铝合金龙骨",{"key":31,"text":325,"correct":22},"轻钢龙骨",{"key":34,"text":327,"correct":26},"明龙骨","BE",{"id":330,"libraryId":5,"type":15,"typeLabel":16,"stem":331,"options":332,"answer":52,"analysis":37},1259975,"板块面层吊顶按照采用的饰面材料不同，分为（ ）吊顶等。",[333,335,337,339,341],{"key":20,"text":334,"correct":26},"石膏板",{"key":24,"text":336,"correct":26},"金属板",{"key":28,"text":338,"correct":26},"矿棉板",{"key":31,"text":340,"correct":26},"木格栅",{"key":34,"text":342,"correct":22},"不上人吊顶",{"id":344,"libraryId":5,"type":15,"typeLabel":16,"stem":345,"options":346,"answer":52,"analysis":37},1259976,"大面积石膏板吊顶应采取（ ）措施防止开裂。",[347,349,351,353,355],{"key":20,"text":348,"correct":26},"石膏板沿四周墙壁开设凹槽",{"key":24,"text":350,"correct":26},"在石膏板吊顶上做纵、横开缝处理",{"key":28,"text":352,"correct":26},"做好石膏板之间的接缝处理",{"key":31,"text":354,"correct":26},"缩小自攻螺钉钉距，加强固定措施",{"key":34,"text":356,"correct":22},"减少灯具、检修孔等吊顶开孔的数量",{"id":358,"libraryId":5,"type":15,"typeLabel":16,"stem":359,"options":360,"answer":36,"analysis":37},1259977,"下列各项中现浇水磨石地面的施工要点说法正确的是（ ）。",[361,363,365,367,369],{"key":20,"text":362,"correct":22},"石子浆铺抹完成后，即日起浇水养护，并设警戒线严防行人踩踏",{"key":24,"text":364,"correct":26},"对于局部无法使用机械研磨时，可用手工研磨",{"key":28,"text":366,"correct":26},"开模前应试磨，若试磨后石粒不松动，即可开磨",{"key":31,"text":368,"correct":22},"磨光应采用“三浆两磨”方法进行",{"key":34,"text":370,"correct":26},"要求磨至石子料显露，表面平整光滑，无砂眼细孔为止",{"id":372,"libraryId":5,"type":15,"typeLabel":16,"stem":373,"options":374,"answer":82,"analysis":37},1259978,"加气混凝土表面缺棱掉角正确的修补方法是（ ）。",[375,377,379,381,383],{"key":20,"text":376,"correct":26},"需分层修补",{"key":24,"text":378,"correct":26},"洇湿基体表面，刷掺水重10％的108胶水泥浆一道",{"key":28,"text":380,"correct":26},"紧跟抹1：1：6混合砂浆",{"key":31,"text":382,"correct":22},"每遍厚度应控制在12～20mm",{"key":34,"text":384,"correct":26},"每遍厚度应控制在7～9mm",{"id":386,"libraryId":5,"type":15,"typeLabel":16,"stem":387,"options":388,"answer":52,"analysis":37},1259979,"下列关于五金件装配的原则说法正确的是（ ）。",[389,391,393,395,397],{"key":20,"text":390,"correct":26},"要有足够的强度",{"key":24,"text":392,"correct":26},"位置正确",{"key":28,"text":394,"correct":26},"满足各项功能",{"key":31,"text":396,"correct":26},"便于更换",{"key":34,"text":398,"correct":22},"安装位置必须严格按照设计要求执行",{"id":400,"libraryId":5,"type":15,"typeLabel":16,"stem":401,"options":402,"answer":413,"analysis":37},1259980,"铝合金龙骨吊顶面板安装通常分为（ ）。",[403,405,407,409,411],{"key":20,"text":404,"correct":22},"异形金属板搁置式安装",{"key":24,"text":406,"correct":22},"异形金属板卡入式安装",{"key":28,"text":408,"correct":26},"方形金属板搁置式安装",{"key":31,"text":410,"correct":26},"方形金属板卡入式安装",{"key":34,"text":412,"correct":26},"条形金属板安装","CDE",{"id":415,"libraryId":5,"type":15,"typeLabel":16,"stem":416,"options":417,"answer":413,"analysis":37},1259981,"对混凝土表面缺陷如蜂窝、麻面、露筋等的正确处理是（ ）。",[418,420,422,424,426],{"key":20,"text":419,"correct":22},"用水冲后用1：1砂浆补平",{"key":24,"text":421,"correct":22},"把露筋切除后用1：1砂浆补平",{"key":28,"text":423,"correct":26},"首先应剔到实处并冲洗干净",{"key":31,"text":425,"correct":26},"刷素水泥浆一道（内掺水重10％的107胶）",{"key":34,"text":427,"correct":26},"紧跟用1：3水泥砂浆分层补平",{"id":429,"libraryId":5,"type":15,"typeLabel":16,"stem":430,"options":431,"answer":186,"analysis":37},1259982,"下列属于抹面层灰的是（ ）。",[432,434,436,438,440],{"key":20,"text":433,"correct":26},"纸筋石灰面层",{"key":24,"text":435,"correct":26},"麻刀石灰面层",{"key":28,"text":437,"correct":26},"石灰砂浆面层",{"key":31,"text":439,"correct":22},"108胶水泥浆面层",{"key":34,"text":441,"correct":22},"素水泥浆面层",{"id":443,"libraryId":5,"type":15,"typeLabel":16,"stem":444,"options":445,"answer":82,"analysis":37},1259983,"内墙抹灰施工工艺流程及施工要点有（ ）。",[446,448,450,452,454],{"key":20,"text":447,"correct":26},"基层清理",{"key":24,"text":449,"correct":26},"找规矩、弹线",{"key":28,"text":451,"correct":26},"做灰饼、冲筋",{"key":31,"text":453,"correct":22},"做阴角护角",{"key":34,"text":455,"correct":26},"抹窗台线、踢脚线、窗台线",{"id":457,"libraryId":5,"type":15,"typeLabel":16,"stem":458,"options":459,"answer":470,"analysis":37},1259984,"下列关于凿眼制作要点错误的是（ ）",[460,462,464,466,468],{"key":20,"text":461,"correct":26},"凿通眼时，先凿正面，后凿背面",{"key":24,"text":463,"correct":22},"凿眼的凿刀应和眼的宽窄一致，凿出的眼，顺木纹两侧要直，不得错岔",{"key":28,"text":465,"correct":22},"凿眼时，眼的一边先要凿半线、留半线",{"key":31,"text":467,"correct":26},"手工凿眼时，眼内上下端中部宜稍微突出些，以便拼装时加楔打紧，半眼深度应一致，并与半榫深度应一致",{"key":34,"text":469,"correct":22},"成批生产时，要经常核对，检查眼的位置尺寸，以免发生误差","AD",{"id":472,"libraryId":5,"type":15,"typeLabel":16,"stem":473,"options":474,"answer":485,"analysis":37},1259985,"下列有关安装门窗扇施工要点正确的是（ ）。",[475,477,479,481,483],{"key":20,"text":476,"correct":26},"按设计确定门窗扇的开启方向、五金配件型号和安装位置",{"key":24,"text":478,"correct":26},"检查门窗框与扇的尺寸是否符合，框口边角是否方正，有无窜角",{"key":28,"text":480,"correct":22},"第一次修刨后的门窗扇，使框与扇表面平整、缝隙尺寸符合后，在开合页槽",{"key":31,"text":482,"correct":22},"经过第二次修刨后，以刚刚能塞入框口内为宜，塞入后用木楔临时固定",{"key":34,"text":484,"correct":26},"安装对开扇时，应保证两扇宽度尺寸、对口缝的裁口深度一致","ABE",{"id":487,"libraryId":5,"type":15,"typeLabel":16,"stem":488,"options":489,"answer":67,"analysis":37},1259986,"某建筑装饰公司承担了某实木地板的装修施工任务。实木地板铺设时，地坪面抹1：1：4（水泥：黄砂：石灰膏）找平层；木格栅采用膨胀螺栓固定；安装木搁栅时找平层强度达到设计强度70％；设计中未明确木搁栅和地板的方向，木格栅顺着房间长向布置，木格栅接头采用平接头；铺设面层地板的板缝为1mm。根据背景资料，回答下列问题。 上述案例背景资料里有错误的步骤有（ ）。（多项选择题）",[490,492,494,496,498],{"key":20,"text":491,"correct":26},"地坪面抹1：1：4（水泥：黄砂：石灰膏）找平层",{"key":24,"text":493,"correct":22},"木格栅采用膨胀螺栓固定",{"key":28,"text":495,"correct":22},"木搁栅的接头采用平接头",{"key":31,"text":497,"correct":26},"铺设面层地板的板缝为1mm",{"key":34,"text":499,"correct":26},"安装木搁栅时找平层强度达到设计强度70％",{"id":501,"libraryId":5,"type":15,"typeLabel":16,"stem":502,"options":503,"answer":67,"analysis":37},1259987,"下列关于安装玻璃门拉手应注意的说法中，表述正确的是（ ）。",[504,506,508,510,512],{"key":20,"text":505,"correct":26},"拉手的连接部位，插入玻璃门拉手孔时不能很紧，应略有松动",{"key":24,"text":507,"correct":22},"如果过松，可以在插入部分涂少许玻璃胶",{"key":28,"text":509,"correct":22},"安装前在拉手插入玻璃的部分裹上软质胶带",{"key":31,"text":511,"correct":26},"拉手组装时，其根部与玻璃贴靠紧密后，再上紧固定螺钉",{"key":34,"text":513,"correct":26},"其根部与玻璃贴靠紧密后，再上紧固定螺钉，是为了保证拉手没有丝毫松动现象",{"id":515,"libraryId":5,"type":15,"typeLabel":16,"stem":516,"options":517,"answer":171,"analysis":37},1259988,"涂饰工程的常用施涂方法有（ ）。",[518,520,522,524,526],{"key":20,"text":519,"correct":26},"刷涂",{"key":24,"text":521,"correct":22},"油涂",{"key":28,"text":523,"correct":26},"喷涂",{"key":31,"text":525,"correct":26},"抹涂",{"key":34,"text":527,"correct":22},"刮涂",{"id":529,"libraryId":5,"type":15,"typeLabel":16,"stem":530,"options":531,"answer":542,"analysis":37},1259989,"塑钢彩板门窗的水平位置应以楼层室内（ ）cm的水平线为准向（ ）反。",[532,534,536,538,540],{"key":20,"text":533,"correct":26},"+50",{"key":24,"text":535,"correct":22},"+100",{"key":28,"text":537,"correct":22},"+150",{"key":31,"text":539,"correct":22},"下",{"key":34,"text":541,"correct":26},"上","AE",{"id":544,"libraryId":5,"type":15,"typeLabel":16,"stem":545,"options":546,"answer":186,"analysis":37},1259990,"石材地面铺设做法与地砖楼地面铺贴方法相同的是（ ）。",[547,548,550,551,553],{"key":20,"text":277,"correct":26},{"key":24,"text":549,"correct":26},"弹线找规矩",{"key":28,"text":451,"correct":26},{"key":31,"text":552,"correct":22},"选板试饼",{"key":34,"text":554,"correct":22},"铺板、打蜡",{"id":556,"libraryId":5,"type":15,"typeLabel":16,"stem":557,"options":558,"answer":97,"analysis":37},1259991,"木龙骨吊顶施工工艺中弹线包括（ ）。",[559,561,563,565,567],{"key":20,"text":560,"correct":26},"弹吊顶标高线",{"key":24,"text":562,"correct":26},"吊顶造型位置线",{"key":28,"text":564,"correct":22},"压条定位线",{"key":31,"text":566,"correct":26},"吊挂点定位线",{"key":34,"text":568,"correct":26},"大中型灯具吊点定位线",{"id":570,"libraryId":5,"type":15,"typeLabel":16,"stem":571,"options":572,"answer":171,"analysis":37},1259992,"轻钢龙骨吊顶罩面板常有（ ）三种安装方式。",[573,575,577,579,581],{"key":20,"text":574,"correct":26},"明装",{"key":24,"text":576,"correct":22},"透明装",{"key":28,"text":578,"correct":26},"暗装",{"key":31,"text":580,"correct":26},"半隐装",{"key":34,"text":582,"correct":22},"表装",{"id":584,"libraryId":5,"type":15,"typeLabel":16,"stem":585,"options":586,"answer":156,"analysis":37},1259993,"符合冬季注胶作业环境条件的是（ ）。",[587,589,591,593,595],{"key":20,"text":588,"correct":26},"冬季注胶作业环境温度应控制在5℃以上",{"key":24,"text":590,"correct":22},"冬季注胶作业环境温度应控制在10℃以上",{"key":28,"text":592,"correct":26},"结构胶粘结施工时，环境温度不宜低于10℃",{"key":31,"text":594,"correct":22},"结构胶粘结施工时，环境温度不宜低于20℃",{"key":34,"text":596,"correct":22},"上一个工地用过的同一品牌的胶，在这个工地上使用可不做试验",{"id":598,"libraryId":5,"type":15,"typeLabel":16,"stem":599,"options":600,"answer":186,"analysis":37},1259994,"整体面层吊顶按照采用的龙骨材料不同，分为（ ）吊顶等。",[601,602,603,604,606],{"key":20,"text":319,"correct":26},{"key":24,"text":325,"correct":26},{"key":28,"text":323,"correct":26},{"key":31,"text":605,"correct":22},"木板",{"key":34,"text":607,"correct":22},"塑料板",{"id":609,"libraryId":5,"type":15,"typeLabel":16,"stem":610,"options":611,"answer":82,"analysis":37},1259995,"符合木饰面安装允许偏差的是（ ）。",[612,614,616,618,620],{"key":20,"text":613,"correct":26},"立面垂直度1.0mm",{"key":24,"text":615,"correct":26},"表面平整度1.0mm",{"key":28,"text":617,"correct":26},"接缝直线度1.0mm",{"key":31,"text":619,"correct":22},"墙裙、勒脚上口直线度15mm",{"key":34,"text":621,"correct":26},"接缝高低差1.0mm",{"id":623,"libraryId":5,"type":15,"typeLabel":16,"stem":624,"options":625,"answer":328,"analysis":37},1259996,"下列关于门窗扇及玻璃的安装要点中有误的是（ ）。",[626,628,630,632,634],{"key":20,"text":627,"correct":22},"门窗扇及玻璃应在洞口墙体表面装饰完成后安装",{"key":24,"text":629,"correct":26},"推拉门窗在门窗框安装固定后，将配好玻璃的门窗扇整体安入框内滑道后再安玻璃",{"key":28,"text":631,"correct":22},"平开门窗在框与扇格架组装上墙、安装固定好后再安玻璃",{"key":31,"text":633,"correct":22},"地弹簧门应在门框及地弹簧主机入地安装固定后再安门窗",{"key":34,"text":635,"correct":26},"平开门窗在调整好框与扇的缝隙后再安玻璃",{"id":637,"libraryId":5,"type":15,"typeLabel":16,"stem":638,"options":639,"answer":52,"analysis":37},1259997,"涂饰工程涂刷要求包括（ ）。",[640,642,644,646,648],{"key":20,"text":641,"correct":26},"上道涂层干燥后，再进行下道涂层",{"key":24,"text":643,"correct":26},"涂料挥发快的不可过多重复回刷",{"key":28,"text":645,"correct":26},"流平性差的注意每层厚薄一致",{"key":31,"text":647,"correct":26},"刷罩面层时，走刷速度要均匀，涂层要匀",{"key":34,"text":649,"correct":22},"第一道深层涂料稠度不宜过小，深层要薄，使基层快速吸收为佳",{"id":651,"libraryId":5,"type":15,"typeLabel":16,"stem":652,"options":653,"answer":171,"analysis":37},1259998,"吊顶龙骨有（ ）系列。",[654,656,658,660,662],{"key":20,"text":655,"correct":26},"38",{"key":24,"text":657,"correct":22},"45",{"key":28,"text":659,"correct":26},"50",{"key":31,"text":661,"correct":26},"60",{"key":34,"text":663,"correct":22},"75",{"id":665,"libraryId":5,"type":15,"typeLabel":16,"stem":666,"options":667,"answer":112,"analysis":37},1259999,"下列关于裱糊类装饰装修施工要点正确的是（ ）。",[668,670,672,674,676],{"key":20,"text":669,"correct":26},"基层表面必须平整光滑，否则需处理后达到要求",{"key":24,"text":671,"correct":22},"刮腻子厚薄要均匀，且不宜过薄",{"key":28,"text":673,"correct":26},"裱糊类装饰施工前，需在墙面弹好线，以保证裱糊成品顺直",{"key":31,"text":675,"correct":26},"裱糊材料上墙前，需刷胶，涂胶要均匀",{"key":34,"text":677,"correct":26},"裱糊完工后，要除去表面不洁之物，并注意保持温度与湿度适宜",{"id":679,"libraryId":5,"type":15,"typeLabel":16,"stem":680,"options":681,"answer":692,"analysis":37},1260000,"下列各项中，不属于施工项目管理的内容的是（ ）。",[682,684,686,688,690],{"key":20,"text":683,"correct":22},"建立施工项目管理组织",{"key":24,"text":685,"correct":26},"编制《施工项目管理目标责任书》",{"key":28,"text":687,"correct":22},"施工项目的生产要素管理",{"key":31,"text":689,"correct":26},"施工项目的施工情况的评估",{"key":34,"text":691,"correct":22},"施工项目的信息管理","BD",{"id":694,"libraryId":5,"type":15,"typeLabel":16,"stem":695,"options":696,"answer":52,"analysis":37},1260001,"以下属于施工项目资源管理的内容的是（ ）。",[697,699,701,703,705],{"key":20,"text":698,"correct":26},"劳动力",{"key":24,"text":700,"correct":26},"材料",{"key":28,"text":702,"correct":26},"技术",{"key":31,"text":704,"correct":26},"机械设备",{"key":34,"text":706,"correct":22},"施工现场",{"id":708,"libraryId":5,"type":15,"typeLabel":16,"stem":709,"options":710,"answer":721,"analysis":37},1260002,"2013年2月，某公司研发生产中心工地在施工过程中发生支模架和正在浇筑的房屋板坍塌事故，导致13人死亡、16人受伤。经调查，造成此次事故的直接原因是支模架质量低劣。管理上的原因包括：（1）建设单位片面强调工程施工进度，而一些图纸的提供比较滞后，对施工单位违规施工有一定程度的影响；在没有领取施工许可证的情况下先行组织施工，整个工程边设计边施工。（2）施工单位支模架搭设人员均没有特种作业人员上岗证，支模架搭设不规范。（3）施工单位没有对搭设支模架使用的钢管和扣件进行严格的质量检查，使用的钢管、扣件缺乏质量保证书和检测报告等有效的质量证明文件。根据材料背景，回答下列问题。 下列分部分项工程中，属于需要编制专项施工方案的有（ ）。（多项选择题）",[711,713,715,717,719],{"key":20,"text":712,"correct":22},"施工用电",{"key":24,"text":714,"correct":26},"模板工程",{"key":28,"text":716,"correct":22},"抹灰工程",{"key":31,"text":718,"correct":26},"脚手架工程",{"key":34,"text":720,"correct":26},"起重吊装工程","BDE",{"id":723,"libraryId":5,"type":15,"typeLabel":16,"stem":724,"options":725,"answer":485,"analysis":37},1260003,"下列选项中，属于项目部设置的最基本的岗位的是（ ）。",[726,728,730,732,734],{"key":20,"text":727,"correct":26},"施工员",{"key":24,"text":729,"correct":26},"安全员",{"key":28,"text":731,"correct":22},"机械员",{"key":31,"text":733,"correct":22},"劳务员",{"key":34,"text":735,"correct":26},"测量员",[737,741,744,747,750,753],{"id":738,"name":739,"category":7,"favorite":740},1,"领导干部任职前廉政法规知识测试题",92,{"id":742,"name":743,"category":7,"favorite":738},595,"建筑结构与设备",{"id":745,"name":746,"category":7,"favorite":738},715,"招标采购专业知识与法律法规",{"id":748,"name":749,"category":7,"favorite":738},848,"市政方向-通用基础",{"id":751,"name":752,"category":7,"favorite":8},534,"BIM工程师",{"id":754,"name":752,"category":7,"favorite":8},535]