[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"q-1260406":3},{"question":4,"library":20},{"id":5,"libraryId":6,"type":7,"typeLabel":8,"stem":9,"options":10,"answer":17,"analysis":19},1260406,843,3,"判断题","某施工项目为8000m2的公共建筑工程施工，按照要求，须实行施工因质量项目管理。（ ）",[11,15],{"key":12,"text":13,"correct":14},"A","正确",false,{"key":16,"text":17,"correct":18},"B","错误",true,"施工项目为8000m2的公共建筑工程施工，按照要求，不需要进行施工因质量项目管理。",{"id":6,"name":21,"category":22,"favorite":23},"(装饰施工)基础知识","建筑工程",0]