[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"q-1260367":3},{"question":4,"library":19},{"id":5,"libraryId":6,"type":7,"typeLabel":8,"stem":9,"options":10,"answer":13,"analysis":9},1260367,843,3,"判断题","木面层地面施工前应完成顶棚、墙面的各种湿作业工程且干燥程度在80%以上。",[11,15],{"key":12,"text":13,"correct":14},"A","正确",true,{"key":16,"text":17,"correct":18},"B","错误",false,{"id":6,"name":20,"category":21,"favorite":22},"(装饰施工)基础知识","建筑工程",0]