[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"q-1260128":3},{"question":4,"library":30},{"id":5,"libraryId":6,"type":7,"typeLabel":8,"stem":9,"options":10,"answer":28,"analysis":29},1260128,843,2,"多选题","工程量清单计价中分部分项工程量清单计价表中有综合单价一项，该综合单价应包括完成一个规定计量单位工程所需的（ ）。",[11,15,18,21,25],{"key":12,"text":13,"correct":14},"A","人工费",true,{"key":16,"text":17,"correct":14},"B","材料费",{"key":19,"text":20,"correct":14},"C","机械使用费",{"key":22,"text":23,"correct":24},"D","间接费",false,{"key":26,"text":27,"correct":14},"E","管理费","ABCE","综合单价包括：人工费、材料费、机械使用费、管理费",{"id":6,"name":31,"category":32,"favorite":33},"(装饰施工)基础知识","建筑工程",0]