[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"q-1260118":3},{"question":4,"library":30},{"id":5,"libraryId":6,"type":7,"typeLabel":8,"stem":9,"options":10,"answer":28,"analysis":29},1260118,843,2,"多选题","在下列施工机械工作时间中，不应计入定额时间的有（ ）。",[11,15,18,22,25],{"key":12,"text":13,"correct":14},"A","不可避免的中断时间",false,{"key":16,"text":17,"correct":14},"B","不可避免的无负荷工作时间",{"key":19,"text":20,"correct":21},"C","非施工本身造成的停工时间",true,{"key":23,"text":24,"correct":14},"D","工人休息时间",{"key":26,"text":27,"correct":21},"E","施工本身造成的停工时间","CE","工人休息时间、施工本身造成的停工时间属于有效时间",{"id":6,"name":31,"category":32,"favorite":33},"(装饰施工)基础知识","建筑工程",0]