[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"q-1260114":3},{"question":4,"library":30},{"id":5,"libraryId":6,"type":7,"typeLabel":8,"stem":9,"options":10,"answer":28,"analysis":29},1260114,843,2,"多选题","下列不是措施项目费的是（ ）。",[11,15,19,22,25],{"key":12,"text":13,"correct":14},"A","安全文明施工费",false,{"key":16,"text":17,"correct":18},"B","工程排污费",true,{"key":20,"text":21,"correct":14},"C","已完工程及设备保护费",{"key":23,"text":24,"correct":14},"D","脚手架工程费",{"key":26,"text":27,"correct":18},"E","固定资产使用费","BE","措施项目费可以归纳为以下十项：一是安全文明施工费；二是夜间施工增加费；三是二次搬运费；四是冬雨季施工增加费；五是大型机械设备进出场及安拆费；六是施工排水降水费；七是地上、地下设施，建筑物的临时保护设施费；八是已完工程及设备保护费；九是混凝土模板及支架费；十是脚手架工程费。",{"id":6,"name":31,"category":32,"favorite":33},"(装饰施工)基础知识","建筑工程",0]