[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"q-1260016":3},{"question":4,"library":30},{"id":5,"libraryId":6,"type":7,"typeLabel":8,"stem":9,"options":10,"answer":28,"analysis":29},1260016,843,2,"多选题","施工项目用后服务阶段的主要工作包括（ ）。",[11,15,18,21,25],{"key":12,"text":13,"correct":14},"A","根据《工程质量保修书》的约定做好保修工作",true,{"key":16,"text":17,"correct":14},"B","进行工程回访",{"key":19,"text":20,"correct":14},"C","为保证正常使用提供必要的技术咨询",{"key":22,"text":23,"correct":24},"D","对维修发生的维修费用向用户收取",false,{"key":26,"text":27,"correct":24},"E","使用建设单位推荐的维修队进行维修","ABC","该阶段的主要工作内容：1..根据《工程质量保修书》的约定做好保修工作2.进行工程回访，听取客户意见，总结经验教训，发现问题，及时维修和保养3.为保证正常使用提供必要的技术咨询和服务4.配合科研等需要，进行沉陷、抗震性能观察",{"id":6,"name":31,"category":32,"favorite":33},"(装饰施工)基础知识","建筑工程",0]