[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"q-1259977":3},{"question":4,"library":30},{"id":5,"libraryId":6,"type":7,"typeLabel":8,"stem":9,"options":10,"answer":28,"analysis":29},1259977,843,2,"多选题","下列各项中现浇水磨石地面的施工要点说法正确的是（ ）。",[11,15,19,22,25],{"key":12,"text":13,"correct":14},"A","石子浆铺抹完成后，即日起浇水养护，并设警戒线严防行人踩踏",false,{"key":16,"text":17,"correct":18},"B","对于局部无法使用机械研磨时，可用手工研磨",true,{"key":20,"text":21,"correct":18},"C","开模前应试磨，若试磨后石粒不松动，即可开磨",{"key":23,"text":24,"correct":14},"D","磨光应采用“三浆两磨”方法进行",{"key":26,"text":27,"correct":18},"E","要求磨至石子料显露，表面平整光滑，无砂眼细孔为止","BCE","养护。石子浆铺抹完成后，次日起浇水养护，并设警戒线严防行人踩踏。磨光。对于局部无法使用机械研磨时，可用手工研磨。开模前应试磨，若试磨后石粒不松动，即可开磨。磨光应采用“两浆三磨”方法进行。要求磨至石子料显露，表面平整光滑，无砂眼细孔为止。",{"id":6,"name":31,"category":32,"favorite":33},"(装饰施工)基础知识","建筑工程",0]