[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"q-1259680":3},{"question":4,"library":26},{"id":5,"libraryId":6,"type":7,"typeLabel":8,"stem":9,"options":10,"answer":22,"analysis":25},1259680,843,1,"单选题","下列计算公式中不属于其他用工中相关计算公式的是（ ）。",[11,15,18,21],{"key":12,"text":13,"correct":14},"A","超运距=预算定额取定运距-劳动定额已包括的运距",false,{"key":16,"text":17,"correct":14},"B","辅助用工=Σ（材料加工数量×相应的加工劳动定额）",{"key":19,"text":20,"correct":14},"C","人工幅度差=（基本用工+辅助用工+超运距用工）×人工幅度差系数",{"key":22,"text":23,"correct":24},"D","人工幅度差=（基本用工+辅助用工）×人工幅度差系数",true,"用工包括基本用工和其他用工，其他用工包括：辅助用工、超运距用工、人工幅度差，人工幅度差=（基本用工+辅助用工+超运距用工）×人工幅度差系数",{"id":6,"name":27,"category":28,"favorite":29},"(装饰施工)基础知识","建筑工程",0]