[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"q-1259674":3},{"question":4,"library":26},{"id":5,"libraryId":6,"type":7,"typeLabel":8,"stem":9,"options":10,"answer":22,"analysis":25},1259674,843,1,"单选题","在清单报价中土方计算应以（ ）以体积计算。",[11,15,18,21],{"key":12,"text":13,"correct":14},"A","以几何公式考虑放坡、操作工作面等因素计算",false,{"key":16,"text":17,"correct":14},"B","基础挖土方按基础垫层底面积加工作面乘挖土深度",{"key":19,"text":20,"correct":14},"C","基础挖土方按基础垫层底面积加支挡土板宽度乘挖土深度",{"key":22,"text":23,"correct":24},"D","基础挖土方按基础垫层底面乘挖土深度",true,"在清单报价中土方计算应以基础挖土方按基础垫层底面乘挖土深度以体积计算。",{"id":6,"name":27,"category":28,"favorite":29},"(装饰施工)基础知识","建筑工程",0]