[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"q-1259663":3},{"question":4,"library":26},{"id":5,"libraryId":6,"type":7,"typeLabel":8,"stem":9,"options":10,"answer":22,"analysis":25},1259663,843,1,"单选题","预算定额人工工日消耗量应包括（ ）。",[11,15,18,21],{"key":12,"text":13,"correct":14},"A","基本用工和人工幅度差用工",false,{"key":16,"text":17,"correct":14},"B","辅助用工和基本用工",{"key":19,"text":20,"correct":14},"C","基本用工和其他用工",{"key":22,"text":23,"correct":24},"D","基本用工，其他用工和人工幅度差用工",true,"预算定额人工工日消耗量应包括基本用工，其他用工和人工幅度差用工。",{"id":6,"name":27,"category":28,"favorite":29},"(装饰施工)基础知识","建筑工程",0]