[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"q-1259661":3},{"question":4,"library":26},{"id":5,"libraryId":6,"type":7,"typeLabel":8,"stem":9,"options":10,"answer":22,"analysis":25},1259661,843,1,"单选题","现行建设工程费用由（ ）构成。",[11,15,18,21],{"key":12,"text":13,"correct":14},"A","分部分项工程费、措施项目费、其他项目费",false,{"key":16,"text":17,"correct":14},"B","分部分项工程费、措施项目费、其他项目费、规费",{"key":19,"text":20,"correct":14},"C","分部分项工程费、措施项目费、其他项目费、税金",{"key":22,"text":23,"correct":24},"D","分部分项工程费、措施项目费、其他项目费、规费和税金",true,"现行建设工程费用由分部分项工程费、措施项目费、其他项目费、规费和税金构成。",{"id":6,"name":27,"category":28,"favorite":29},"(装饰施工)基础知识","建筑工程",0]