[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"q-1259645":3},{"question":4,"library":26},{"id":5,"libraryId":6,"type":7,"typeLabel":8,"stem":9,"options":10,"answer":22,"analysis":25},1259645,843,1,"单选题","工程量清单主要由（ ）等组成。",[11,15,18,21],{"key":12,"text":13,"correct":14},"A","分部分项工程量清单，措施项目清单",false,{"key":16,"text":17,"correct":14},"B","分部分项工程量清单，措施项目清单和其他项目清单",{"key":19,"text":20,"correct":14},"C","分部分项工程量清单，措施项目清单，其他项目清单和施工组织设计",{"key":22,"text":23,"correct":24},"D","分部分项工程量清单，措施项目清单，其他项目清单，规费项目清单和税金项目清单",true,"工程量清单主要由分部分项工程量清单，措施项目清单，其他项目清单，规费项目清单和税金项目清单等组成。",{"id":6,"name":27,"category":28,"favorite":29},"(装饰施工)基础知识","建筑工程",0]