[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"q-1259627":3},{"question":4,"library":26},{"id":5,"libraryId":6,"type":7,"typeLabel":8,"stem":9,"options":10,"answer":12,"analysis":25},1259627,843,1,"单选题","单位工程计算顺序一般按（ ）列项顺序计算。",[11,15,19,22],{"key":12,"text":13,"correct":14},"A","计价规范清单",true,{"key":16,"text":17,"correct":18},"B","顺时针方向",false,{"key":20,"text":21,"correct":18},"C","图纸分项编号",{"key":23,"text":24,"correct":18},"D","逆时针方向","单位工程计算顺序一般按计价规范清单列项顺序计算。",{"id":6,"name":27,"category":28,"favorite":29},"(装饰施工)基础知识","建筑工程",0]