[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"q-1259421":3},{"question":4,"library":26},{"id":5,"libraryId":6,"type":7,"typeLabel":8,"stem":9,"options":10,"answer":12,"analysis":25},1259421,843,1,"单选题","管道系统安装完后应进行综合水压试验。水压试验时应（ ），待水充满后进行加压。当压力升到规定值时，停止打压，认真检查整个管道系统，确认各处接口和阀门均无渗漏现象，再持续稳压到规定时间，观察其压力下降在允许范围内，并经有关人员验收认可后，填写好水压试验记录，办理交接手续。",[11,15,19,22],{"key":12,"text":13,"correct":14},"A","排净空气",true,{"key":16,"text":17,"correct":18},"B","检查管道",false,{"key":20,"text":21,"correct":18},"C","清理管道",{"key":23,"text":24,"correct":18},"D","放水","管道系统安装完后应进行综合水压试验。水压试验时应排净空气，待水充满后进行加压。当压力升到规定值时，停止打压，认真检查整个管道系统，确认各处接口和阀门均无渗漏现象，再持续稳压到规定时间，观察其压力下降在允许范围内，并经有关人员验收认可后，填写好水压试验记录，办理交接手续。",{"id":6,"name":27,"category":28,"favorite":29},"(装饰施工)基础知识","建筑工程",0]