[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"q-1259362":3},{"question":4,"library":26},{"id":5,"libraryId":6,"type":7,"typeLabel":8,"stem":9,"options":10,"answer":19,"analysis":25},1259362,843,1,"单选题","不符合石材干挂安装正确方法的是（ ）。",[11,15,18,22],{"key":12,"text":13,"correct":14},"A","大于25mm厚的石材干挂可以在侧面直接开槽",false,{"key":16,"text":17,"correct":14},"B","槽口的后面应留不小于8mm宽度，石材的重量靠这8mm的宽度同不锈钢挂件的紧密结合把重量传递给基层钢架",{"key":19,"text":20,"correct":21},"C","下一排石材安装好后，上一排石材安装应支放在下排石材上",true,{"key":23,"text":24,"correct":14},"D","石材的干挂每一块板的重量要靠各自的挂件承担，不可将力压向下一排，切不可将传统的砌砖工艺用在石材或玻化砖的干挂上","一排板材安装完毕，再进行上一排扣件固定和安装，板材安装要求四角平整，纵横对缝。不是直接安装应支放在下排石材上",{"id":6,"name":27,"category":28,"favorite":29},"(装饰施工)基础知识","建筑工程",0]