[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"lib-842-9":3},{"library":4,"page":9,"limit":10,"total":11,"questions":12,"related":602},{"id":5,"name":6,"category":7,"favorite":8},842,"(土建施工)专业管理实务 岗位知识","建筑工程",0,9,50,892,[13,34,46,58,70,82,94,106,118,127,139,151,163,175,187,199,211,223,231,243,255,267,279,291,303,315,327,339,350,362,374,386,398,410,422,434,444,456,468,480,489,501,511,523,535,547,559,567,578,590],{"id":14,"libraryId":5,"type":15,"typeLabel":16,"stem":17,"options":18,"answer":30,"analysis":33},1258708,1,"单选题","项目施工过程中，发生（ ）情况时，施工组织设计不需要进行修改或补充。",[19,23,26,29],{"key":20,"text":21,"correct":22},"A","工程设计有重大调整",false,{"key":24,"text":25,"correct":22},"B","主要施工方法有重大调整",{"key":27,"text":28,"correct":22},"C","主要施工资源配置有重大调整",{"key":30,"text":31,"correct":32},"D","施工企业法人代表变更",true,"",{"id":35,"libraryId":5,"type":15,"typeLabel":16,"stem":36,"options":37,"answer":27,"analysis":33},1258709,"专项方案如因设计、结构、外部环境等因素发生变化确需修改的，修改后的专项方案应当（ ）。",[38,40,42,44],{"key":20,"text":39,"correct":22},"可直接实施",{"key":24,"text":41,"correct":22},"经项目总工审批后实施",{"key":27,"text":43,"correct":32},"重新审核",{"key":30,"text":45,"correct":22},"经项目经理审批后实施",{"id":47,"libraryId":5,"type":15,"typeLabel":16,"stem":48,"options":49,"answer":30,"analysis":33},1258710,"大体积混凝土结构的浇筑方案不包含（ ）。",[50,52,54,56],{"key":20,"text":51,"correct":22},"全面分层",{"key":24,"text":53,"correct":22},"分段分层",{"key":27,"text":55,"correct":22},"斜面分层",{"key":30,"text":57,"correct":32},"分区分层",{"id":59,"libraryId":5,"type":15,"typeLabel":16,"stem":60,"options":61,"answer":24,"analysis":33},1258711,"计要求全焊透的一、二级焊缝，应采用（ ）检查进行内部缺陷的检验。",[62,64,66,68],{"key":20,"text":63,"correct":22},"磁粉探伤",{"key":24,"text":65,"correct":32},"超声波探伤",{"key":27,"text":67,"correct":22},"使用焊缝量规",{"key":30,"text":69,"correct":22},"使用放大镜",{"id":71,"libraryId":5,"type":15,"typeLabel":16,"stem":72,"options":73,"answer":20,"analysis":33},1258712,"下列选项中，属于单位工程施工组织设计的内容的是（ ）。",[74,76,78,80],{"key":20,"text":75,"correct":32},"主要施工方案",{"key":24,"text":77,"correct":22},"施工方法和施工机械的选择",{"key":27,"text":79,"correct":22},"暂设工程",{"key":30,"text":81,"correct":22},"劳动生产率",{"id":83,"libraryId":5,"type":15,"typeLabel":16,"stem":84,"options":85,"answer":20,"analysis":33},1258714,"对于超过一定规模的危险性较大的分部分项工程，（ ）应当组织专家组对其专项方案进行充分论证。",[86,88,90,92],{"key":20,"text":87,"correct":32},"施工单位",{"key":24,"text":89,"correct":22},"建设单位",{"key":27,"text":91,"correct":22},"监理单位",{"key":30,"text":93,"correct":22},"施工总承包单位",{"id":95,"libraryId":5,"type":15,"typeLabel":16,"stem":96,"options":97,"answer":24,"analysis":33},1258715,"关于防水卷材的铺贴方法说法中，正确的是（ ）。",[98,100,102,104],{"key":20,"text":99,"correct":22},"当屋面坡度小于3%时，宜垂直于屋脊铺贴",{"key":24,"text":101,"correct":32},"屋面坡度在3%～15%时，卷材可平行于或垂直于屋脊铺贴",{"key":27,"text":103,"correct":22},"当屋面坡度大于15%或屋面受振动时，应平行于屋脊铺贴",{"key":30,"text":105,"correct":22},"上下层卷材可相互垂直铺贴",{"id":107,"libraryId":5,"type":15,"typeLabel":16,"stem":108,"options":109,"answer":30,"analysis":33},1258716,"专项施工方案的编制依据不包括（ ）",[110,112,114,116],{"key":20,"text":111,"correct":22},"相关法律、法规",{"key":24,"text":113,"correct":22},"施工组织设计",{"key":27,"text":115,"correct":22},"图纸",{"key":30,"text":117,"correct":32},"作业指导书",{"id":119,"libraryId":5,"type":15,"typeLabel":16,"stem":120,"options":121,"answer":20,"analysis":33},1258717,"建筑工程实施施工总承包的，专项施工方案应当由（ ）组织编制。",[122,123,124,125],{"key":20,"text":93,"correct":32},{"key":24,"text":91,"correct":22},{"key":27,"text":89,"correct":22},{"key":30,"text":126,"correct":22},"分包单位",{"id":128,"libraryId":5,"type":15,"typeLabel":16,"stem":129,"options":130,"answer":30,"analysis":33},1258718,"关于混凝土浇筑的说法中错误的是（ ）。",[131,133,135,137],{"key":20,"text":132,"correct":22},"混凝土的浇筑工作应尽可能连续进行",{"key":24,"text":134,"correct":22},"若上下层或前后层混凝土浇筑必须间歇，其间歇时间应尽量缩短",{"key":27,"text":136,"correct":22},"要在前层（下层）混凝土凝结（终凝）前，将次层混凝土浇筑完毕",{"key":30,"text":138,"correct":32},"浇筑竖向结构混凝土前，应先在底部填筑一层20～50mm厚、与混凝土内砂浆成分相同的水泥砂浆，然后再浇筑混凝土。",{"id":140,"libraryId":5,"type":15,"typeLabel":16,"stem":141,"options":142,"answer":20,"analysis":33},1258719,"后张法施工工艺中，其主要工序不包括（ ）。",[143,145,147,149],{"key":20,"text":144,"correct":32},"浇筑混凝土",{"key":24,"text":146,"correct":22},"预留孔道",{"key":27,"text":148,"correct":22},"预应力筋张拉",{"key":30,"text":150,"correct":22},"孔道灌浆",{"id":152,"libraryId":5,"type":15,"typeLabel":16,"stem":153,"options":154,"answer":30,"analysis":33},1258720,"在屋面卷材防水施工中，不属于合成高分子防水卷材的施工方法是（）。",[155,157,159,161],{"key":20,"text":156,"correct":22},"A冷粘法",{"key":24,"text":158,"correct":22},"B自粘法",{"key":27,"text":160,"correct":22},"C热熔法",{"key":30,"text":162,"correct":32},"D热风焊接法",{"id":164,"libraryId":5,"type":15,"typeLabel":16,"stem":165,"options":166,"answer":27,"analysis":33},1258721,"下列哪一项不是常用的防水混凝土（ ）。",[167,169,171,173],{"key":20,"text":168,"correct":22},"普通防水混凝土",{"key":24,"text":170,"correct":22},"膨胀水泥防水混凝土",{"key":27,"text":172,"correct":32},"高强防水混凝土",{"key":30,"text":174,"correct":22},"外加剂或掺合料防水混凝土",{"id":176,"libraryId":5,"type":15,"typeLabel":16,"stem":177,"options":178,"answer":24,"analysis":33},1258722,"当屋面坡度为2％时，高聚物改性沥青防水卷材宜（ ）铺贴。",[179,181,183,185],{"key":20,"text":180,"correct":22},"垂直于屋脊",{"key":24,"text":182,"correct":32},"平行于屋脊",{"key":27,"text":184,"correct":22},"与屋脊呈45°角",{"key":30,"text":186,"correct":22},"下层平行于屋脊，上层垂直于屋脊",{"id":188,"libraryId":5,"type":15,"typeLabel":16,"stem":189,"options":190,"answer":20,"analysis":33},1258723,"钢结构的连接方法不包括（ ）。",[191,193,195,197],{"key":20,"text":192,"correct":32},"机械连接",{"key":24,"text":194,"correct":22},"焊缝连接",{"key":27,"text":196,"correct":22},"螺栓连接",{"key":30,"text":198,"correct":22},"铆钉连接",{"id":200,"libraryId":5,"type":15,"typeLabel":16,"stem":201,"options":202,"answer":20,"analysis":33},1258724,"单层钢结构节间安装法的优点不包括（ ）。",[203,205,207,209],{"key":20,"text":204,"correct":32},"安装效率高",{"key":24,"text":206,"correct":22},"停机点少",{"key":27,"text":208,"correct":22},"起重机开行路线较短",{"key":30,"text":210,"correct":22},"结构稳定性好，有利于保证工程质量",{"id":212,"libraryId":5,"type":15,"typeLabel":16,"stem":213,"options":214,"answer":27,"analysis":33},1258725,"严寒、寒冷地区的建筑外窗采用推拉窗时，应对其气密性做现场实体检验，同一厂家、同一品种、类型的产品各抽查不少于（ ）樘。",[215,217,219,221],{"key":20,"text":216,"correct":22},"1",{"key":24,"text":218,"correct":22},"2",{"key":27,"text":220,"correct":32},"3",{"key":30,"text":222,"correct":22},"4",{"id":224,"libraryId":5,"type":15,"typeLabel":16,"stem":225,"options":226,"answer":24,"analysis":33},1258726,"混凝土自高处倾落时的自由倾落高度不宜超过（ ）m。",[227,228,229,230],{"key":20,"text":216,"correct":22},{"key":24,"text":218,"correct":32},{"key":27,"text":220,"correct":22},{"key":30,"text":222,"correct":22},{"id":232,"libraryId":5,"type":15,"typeLabel":16,"stem":233,"options":234,"answer":30,"analysis":33},1258727,"下列关于施工技术交底文件的编写要求，说法错误的是（ ）。",[235,237,239,241],{"key":20,"text":236,"correct":22},"施工技术交底的内容要详尽",{"key":24,"text":238,"correct":22},"施工技术交底的针对性要强",{"key":27,"text":240,"correct":22},"施工技术交底的表达要通熟易懂",{"key":30,"text":242,"correct":32},"施工技术交底的范围要广",{"id":244,"libraryId":5,"type":15,"typeLabel":16,"stem":245,"options":246,"answer":20,"analysis":33},1258728,"在铺贴卷材防水层时应采用搭接方法，各层卷材长边和短边搭接的最短宽度分别不应小于（ ）mm。",[247,249,251,253],{"key":20,"text":248,"correct":32},"70，100",{"key":24,"text":250,"correct":22},"70，80",{"key":27,"text":252,"correct":22},"60，100",{"key":30,"text":254,"correct":22},"100，70",{"id":256,"libraryId":5,"type":15,"typeLabel":16,"stem":257,"options":258,"answer":30,"analysis":33},1258729,"根据相关文件规定，下列分部分项工程中需单独编制专项施工方案的是（ ）。",[259,261,263,265],{"key":20,"text":260,"correct":22},"开挖深度不超过3m的基坑（槽）的土方开挖工程",{"key":24,"text":262,"correct":22},"常规起重设备，单件起吊重量在10kN以下的起重吊装工程",{"key":27,"text":264,"correct":22},"搭设高度24m以下的落地式钢管脚手架工程",{"key":30,"text":266,"correct":32},"开挖深度未超过3m，但地质条件和周边环境复杂的基坑（槽）支护、降水工程",{"id":268,"libraryId":5,"type":15,"typeLabel":16,"stem":269,"options":270,"answer":27,"analysis":33},1258730,"以下关于钢筋代换的说法中，错误的是（ ）。",[271,273,275,277],{"key":20,"text":272,"correct":22},"对重要受力构件，不宜用HPB235级光面钢筋代换变形钢筋，以免裂缝开展过大",{"key":24,"text":274,"correct":22},"当构件受裂缝宽度或挠度控制时，钢筋代换后应进行刚度、裂缝验算",{"key":27,"text":276,"correct":32},"不同种类的钢筋代换，按钢筋强度实测值相等的原则进行代换",{"key":30,"text":278,"correct":22},"有抗震要求的梁、柱和框架，不宜以强度等级较高的钢筋代换原设计中的钢筋",{"id":280,"libraryId":5,"type":15,"typeLabel":16,"stem":281,"options":282,"answer":24,"analysis":33},1258731,"施工产生的墙体缺陷，如穿墙套管、脚手眼、孔洞等，应采用（ ）措施，不得影响墙体熟工性能。",[283,285,287,289],{"key":20,"text":284,"correct":22},"专用热桥",{"key":24,"text":286,"correct":32},"隔断热桥",{"key":27,"text":288,"correct":22},"不断热桥",{"key":30,"text":290,"correct":22},"自然热桥",{"id":292,"libraryId":5,"type":15,"typeLabel":16,"stem":293,"options":294,"answer":27,"analysis":33},1258732,"施工方案的编制对象是（ ）。",[295,297,299,301],{"key":20,"text":296,"correct":22},"工程项目",{"key":24,"text":298,"correct":22},"单位工程",{"key":27,"text":300,"correct":32},"分部工程或专项工程",{"key":30,"text":302,"correct":22},"建筑群",{"id":304,"libraryId":5,"type":15,"typeLabel":16,"stem":305,"options":306,"answer":20,"analysis":33},1258733,"关于细石混凝土刚性防水层施工要求，下列说法正确的是（ ）。",[307,309,311,313],{"key":20,"text":308,"correct":32},"厚度不应小于40mm，钢筋网放置在混凝土的中上部，保护层厚度不小于10mm",{"key":24,"text":310,"correct":22},"厚度不应小于40mm，钢筋网放置在混凝土的中下部，保护层厚度不小于10mm",{"key":27,"text":312,"correct":22},"厚度不应小于30mm，钢筋网放置在混凝土的中上部，保护层厚度不小于10mm",{"key":30,"text":314,"correct":22},"厚度不应小于30mm，钢筋网放置在混凝土的中下部，保护层厚度不小于10mm",{"id":316,"libraryId":5,"type":15,"typeLabel":16,"stem":317,"options":318,"answer":30,"analysis":33},1258734,"混凝土搅拌时，常用的投料顺序不包括（ ）。",[319,321,323,325],{"key":20,"text":320,"correct":22},"一次投料法",{"key":24,"text":322,"correct":22},"水泥裹砂法",{"key":27,"text":324,"correct":22},"二次投料法",{"key":30,"text":326,"correct":32},"三次投料法",{"id":328,"libraryId":5,"type":15,"typeLabel":16,"stem":329,"options":330,"answer":24,"analysis":33},1258735,"起重量在（ ）kN及以上的起重设备安装工程，施工方案需进行专家论证。",[331,333,335,337],{"key":20,"text":332,"correct":22},"200",{"key":24,"text":334,"correct":32},"300",{"key":27,"text":336,"correct":22},"350",{"key":30,"text":338,"correct":22},"400",{"id":340,"libraryId":5,"type":15,"typeLabel":16,"stem":341,"options":342,"answer":27,"analysis":33},1258736,"专项工程施工方案技术交底应由项目专业技术负责人负责，根据（ ）对专业工长进行交底。",[343,345,346,348],{"key":20,"text":344,"correct":22},"方案质量管理计划",{"key":24,"text":113,"correct":22},{"key":27,"text":347,"correct":32},"专项施工方案",{"key":30,"text":349,"correct":22},"安全施工组织设计",{"id":351,"libraryId":5,"type":15,"typeLabel":16,"stem":352,"options":353,"answer":30,"analysis":33},1258737,"保温砌块砌筑墙体，应采用具有保温功能的砂浆砌筑，砌体的水平灰缝饱满度不应低于（ ），竖直灰缝饱满不应低于（ ）。",[354,356,358,360],{"key":20,"text":355,"correct":22},"70％，60％",{"key":24,"text":357,"correct":22},"80％，70％",{"key":27,"text":359,"correct":22},"80％，75％",{"key":30,"text":361,"correct":32},"90％，80％",{"id":363,"libraryId":5,"type":15,"typeLabel":16,"stem":364,"options":365,"answer":27,"analysis":33},1258738,"民用建筑采用细石混凝土刚性防水屋面时，刚性防水层分格缝应嵌填密封材料，上部应设置（ ）。",[366,368,370,372],{"key":20,"text":367,"correct":22},"保温层",{"key":24,"text":369,"correct":22},"找平层",{"key":27,"text":371,"correct":32},"保护层",{"key":30,"text":373,"correct":22},"隔离层",{"id":375,"libraryId":5,"type":15,"typeLabel":16,"stem":376,"options":377,"answer":20,"analysis":33},1258739,"梁模板在搭设时，如梁跨度等于或大于（ ）m，应使梁底模起拱，如设计无规定时，起拱高度宜为全跨长度的（ ）。",[378,380,382,384],{"key":20,"text":379,"correct":32},"4，1‰～3‰",{"key":24,"text":381,"correct":22},"4，1‰～2‰",{"key":27,"text":383,"correct":22},"5，1‰～3‰",{"key":30,"text":385,"correct":22},"5，1‰～2‰",{"id":387,"libraryId":5,"type":15,"typeLabel":16,"stem":388,"options":389,"answer":30,"analysis":33},1258740,"民用建筑地下室防水采用外防外贴法时，其特点不包括（ ）。",[390,392,394,396],{"key":20,"text":391,"correct":22},"受结构沉降变形影响小",{"key":24,"text":393,"correct":22},"修补方便",{"key":27,"text":395,"correct":22},"占地面积大",{"key":30,"text":397,"correct":32},"工期短",{"id":399,"libraryId":5,"type":15,"typeLabel":16,"stem":400,"options":401,"answer":24,"analysis":33},1258741,"高强度螺栓连接副在终拧以后，螺栓丝扣外露应为（ ）扣。",[402,404,406,408],{"key":20,"text":403,"correct":22},"1～2",{"key":24,"text":405,"correct":32},"2～3",{"key":27,"text":407,"correct":22},"3～4",{"key":30,"text":409,"correct":22},"4～5",{"id":411,"libraryId":5,"type":15,"typeLabel":16,"stem":412,"options":413,"answer":30,"analysis":33},1258742,"钢筋混凝土预制桩的强度须达到设计强度标准值的（）后方可起吊，如提前起吊，必须采取措施并经验算合格方可进行。",[414,416,418,420],{"key":20,"text":415,"correct":22},"A30%",{"key":24,"text":417,"correct":22},"B50%",{"key":27,"text":419,"correct":22},"C100%",{"key":30,"text":421,"correct":32},"D70%",{"id":423,"libraryId":5,"type":15,"typeLabel":16,"stem":424,"options":425,"answer":20,"analysis":33},1258743,"吊车梁和吊车桁架的组装检查结果，不应有下挠，检验方法为（）。",[426,428,430,432],{"key":20,"text":427,"correct":32},"A构件直立，在两端支承后，由水准仪和钢尺检查",{"key":24,"text":429,"correct":22},"B构件平置，由水准仪和钢尺检查",{"key":27,"text":431,"correct":22},"C构件直立，在两端支承后，由经纬仪检查",{"key":30,"text":433,"correct":22},"D构件平置，由经纬仪和钢尺检查",{"id":435,"libraryId":5,"type":15,"typeLabel":16,"stem":436,"options":437,"answer":27,"analysis":33},1258744,"搭设高度（ ）m及以上的混凝土模板支撑工程属于危险性较大的分部分项工程。",[438,439,440,442],{"key":20,"text":220,"correct":22},{"key":24,"text":222,"correct":22},{"key":27,"text":441,"correct":32},"5",{"key":30,"text":443,"correct":22},"6",{"id":445,"libraryId":5,"type":15,"typeLabel":16,"stem":446,"options":447,"answer":30,"analysis":33},1258745,"关于建筑工程质量不符合要求的处理，以下说法错误的是（ ）。",[448,450,452,454],{"key":20,"text":449,"correct":22},"经返工重做或更换器具、设备的检验批，应重新进行验收",{"key":24,"text":451,"correct":22},"经有资质的检测单位检测鉴定能够达到设计要求的检验批，应予以验收",{"key":27,"text":453,"correct":22},"经返修或加固处理的分项、分部工程，虽然改变外形尺寸但仍能满足安全使用要求，可按技术处理方案和协商文件进行验收",{"key":30,"text":455,"correct":32},"经有资质的检测单位检测鉴定达不到设计要求，但经原设计单位核算认可能够满足结构安全和使用功能的检验批，不能予以验收",{"id":457,"libraryId":5,"type":15,"typeLabel":16,"stem":458,"options":459,"answer":30,"analysis":33},1258746,"桩基础施工质量验收要求，桩位的放样允许偏差为：群桩（ ）mm；单排桩（ ）mm。",[460,462,464,466],{"key":20,"text":461,"correct":22},"20，20",{"key":24,"text":463,"correct":22},"10，20",{"key":27,"text":465,"correct":22},"10，10",{"key":30,"text":467,"correct":32},"20，10",{"id":469,"libraryId":5,"type":15,"typeLabel":16,"stem":470,"options":471,"answer":24,"analysis":33},1258747,"建设工程施工前，施工单位负责该项目管理的（ ）应当对有关安全施工的技术要求向施工作业班组、作业人员做出详细说明，并由双方签字确认。",[472,474,476,478],{"key":20,"text":473,"correct":22},"项目经理",{"key":24,"text":475,"correct":32},"技术人员",{"key":27,"text":477,"correct":22},"质量员",{"key":30,"text":479,"correct":22},"安全员",{"id":481,"libraryId":5,"type":15,"typeLabel":16,"stem":482,"options":483,"answer":20,"analysis":33},1258748,"（ ）有必要对工程项目的概况、危险部位和施工技术要求、作业安全注意事项等向作业人员做出详细说明，以保证施工质量和安全生产。",[484,485,486,487],{"key":20,"text":87,"correct":32},{"key":24,"text":89,"correct":22},{"key":27,"text":91,"correct":22},{"key":30,"text":488,"correct":22},"从业人员",{"id":490,"libraryId":5,"type":15,"typeLabel":16,"stem":491,"options":492,"answer":30,"analysis":33},1258749,"建筑节能工程为单位建筑工程的一个（ ）。",[493,495,497,499],{"key":20,"text":494,"correct":22},"分项工程的检验批",{"key":24,"text":496,"correct":22},"分项工程",{"key":27,"text":498,"correct":22},"子分部工程",{"key":30,"text":500,"correct":32},"分部工程",{"id":502,"libraryId":5,"type":15,"typeLabel":16,"stem":503,"options":504,"answer":24,"analysis":33},1258750,"《危险性较大的分部分项工程安全管理办法》规定，超过一定规模的危险性较大的分部分项工程专项方案，应当由（ ）组织召开专家论证会。",[505,506,507,509],{"key":20,"text":89,"correct":22},{"key":24,"text":87,"correct":32},{"key":27,"text":508,"correct":22},"设计单位",{"key":30,"text":510,"correct":22},"第三方单位",{"id":512,"libraryId":5,"type":15,"typeLabel":16,"stem":513,"options":514,"answer":27,"analysis":33},1258751,"《危险性较大的分部分项工程安全管理办法》规定，施工单位应当在危险性较大的分部分项工程施工前编制专项方案。对于建筑工程实行施工总承包的，起重机械安装拆卸工程专项方案（ ）组织编制。",[515,517,519,521],{"key":20,"text":516,"correct":22},"必须由施工总承包单位",{"key":24,"text":518,"correct":22},"必须由专业承包单位",{"key":27,"text":520,"correct":32},"可以由专业承包单位",{"key":30,"text":522,"correct":22},"可以由监理单位",{"id":524,"libraryId":5,"type":15,"typeLabel":16,"stem":525,"options":526,"answer":24,"analysis":33},1258752,"分部工程应由（ ）组织施工单位项目负责人和技术、质量负责人等进行验收。",[527,529,531,533],{"key":20,"text":528,"correct":22},"建设单位项目技术负责人",{"key":24,"text":530,"correct":32},"建设单位项目负责人",{"key":27,"text":532,"correct":22},"施工单位项目技术负责人",{"key":30,"text":534,"correct":22},"施工单位项目负责人",{"id":536,"libraryId":5,"type":15,"typeLabel":16,"stem":537,"options":538,"answer":24,"analysis":33},1258753,"桩基础施工质量验收要求，打入桩的桩位偏差，必须符合《建筑地基基础工程施工质量验收规范》GB50202-2002规定。斜桩倾斜度的偏差不得大于倾斜角正切值的（ ）。",[539,541,543,545],{"key":20,"text":540,"correct":22},"20%",{"key":24,"text":542,"correct":32},"15%",{"key":27,"text":544,"correct":22},"25%",{"key":30,"text":546,"correct":22},"10%",{"id":548,"libraryId":5,"type":15,"typeLabel":16,"stem":549,"options":550,"answer":24,"analysis":33},1258754,"砖砌体工程施工质量验收的要求规定，砖过梁底部的模板，应在灰缝砂浆强度不低于设计强度的（ ）时，方可拆除。",[551,553,555,557],{"key":20,"text":552,"correct":22},"30%",{"key":24,"text":554,"correct":32},"50%",{"key":27,"text":556,"correct":22},"70%",{"key":30,"text":558,"correct":22},"100%",{"id":560,"libraryId":5,"type":15,"typeLabel":16,"stem":561,"options":562,"answer":24,"analysis":33},1258755,"开挖深度超过（ ）m（含选项）的基坑（槽）的土方开挖工程属于危险性较大的分部分项工程。",[563,564,565,566],{"key":20,"text":218,"correct":22},{"key":24,"text":220,"correct":32},{"key":27,"text":222,"correct":22},{"key":30,"text":441,"correct":22},{"id":568,"libraryId":5,"type":15,"typeLabel":16,"stem":569,"options":570,"answer":27,"analysis":33},1258756,"《建设工程安全生产管理条例》规定，建设工程施工前，（ ）应当对有关安全施工的技术要求向施工作业班组、作业人员作出详细说明，并由双方签字确认。",[571,572,574,576],{"key":20,"text":530,"correct":22},{"key":24,"text":573,"correct":22},"总监理工程师",{"key":27,"text":575,"correct":32},"施工单位负责项目管理的技术人员",{"key":30,"text":577,"correct":22},"施工单位项目经理",{"id":579,"libraryId":5,"type":15,"typeLabel":16,"stem":580,"options":581,"answer":20,"analysis":33},1258757,"在工程项目施工招标投标工作完成后，（ ）单位申请领取施工许可证之前，应携有关资料到所在地建设工程质量监督机构办理工程质量监督登记手续。",[582,584,586,588],{"key":20,"text":583,"correct":32},"建设",{"key":24,"text":585,"correct":22},"监理",{"key":27,"text":587,"correct":22},"施工",{"key":30,"text":589,"correct":22},"中介机构",{"id":591,"libraryId":5,"type":15,"typeLabel":16,"stem":592,"options":593,"answer":20,"analysis":33},1258758,"模板分项工程施工质量验收要求，现浇结构模板安装的偏差，层高垂直度：不大于5m时，允许偏差（ ）mm；大于5m时，允许偏差（ ）mm。",[594,596,598,600],{"key":20,"text":595,"correct":32},"6，8",{"key":24,"text":597,"correct":22},"6，7",{"key":27,"text":599,"correct":22},"5，8",{"key":30,"text":601,"correct":22},"5，7",[603,606,609,612,615,618],{"id":15,"name":604,"category":7,"favorite":605},"领导干部任职前廉政法规知识测试题",92,{"id":607,"name":608,"category":7,"favorite":15},595,"建筑结构与设备",{"id":610,"name":611,"category":7,"favorite":15},715,"招标采购专业知识与法律法规",{"id":613,"name":614,"category":7,"favorite":15},848,"市政方向-通用基础",{"id":616,"name":617,"category":7,"favorite":8},534,"BIM工程师",{"id":619,"name":617,"category":7,"favorite":8},535]