[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"lib-842-8":3},{"library":4,"page":9,"limit":10,"total":11,"questions":12,"related":598},{"id":5,"name":6,"category":7,"favorite":8},842,"(土建施工)专业管理实务 岗位知识","建筑工程",0,8,50,892,[13,34,46,58,70,80,88,100,112,124,136,148,160,172,184,195,207,215,226,238,250,261,273,285,297,309,321,332,344,356,367,379,391,403,415,427,439,451,463,475,487,499,511,523,534,546,557,566,574,586],{"id":14,"libraryId":5,"type":15,"typeLabel":16,"stem":17,"options":18,"answer":20,"analysis":33},1258658,1,"单选题","施工现场危险源识别的方法有：专家调查法；安全检查表法；现场调查法；工作任务分析法等，其中专家调查法的优点是（ ）。",[19,23,27,30],{"key":20,"text":21,"correct":22},"A","简单易行",true,{"key":24,"text":25,"correct":26},"B","简单易懂",false,{"key":28,"text":29,"correct":26},"C","容易掌握",{"key":31,"text":32,"correct":26},"D","可以使安全检查做到系统化","",{"id":35,"libraryId":5,"type":15,"typeLabel":16,"stem":36,"options":37,"answer":31,"analysis":33},1258659,"下列安全事故的主要诱因中，属于人的不安全行为的是（ ）。",[38,40,42,44],{"key":20,"text":39,"correct":26},"防护用品不符合要求",{"key":24,"text":41,"correct":26},"作业场地杂乱",{"key":28,"text":43,"correct":26},"劳动组织不合理",{"key":31,"text":45,"correct":22},"在危险作业时接听手机",{"id":47,"libraryId":5,"type":15,"typeLabel":16,"stem":48,"options":49,"answer":20,"analysis":33},1258660,"工程非法承包，偷工减料，这是施工项目质量问题中（ ）的原因。",[50,52,54,56],{"key":20,"text":51,"correct":22},"违反法规行为",{"key":24,"text":53,"correct":26},"勘察设计失误",{"key":28,"text":55,"correct":26},"违背基本建设程序",{"key":31,"text":57,"correct":26},"施工失误",{"id":59,"libraryId":5,"type":15,"typeLabel":16,"stem":60,"options":61,"answer":24,"analysis":33},1258661,"建筑工程由于工程质量不合格、质量缺陷，必须进行返修、加固或报废处理，并造成或引发经济损失，当造成的直接经济损失低于（ ）元时称为工程质量问题。",[62,64,66,68],{"key":20,"text":63,"correct":26},"3000",{"key":24,"text":65,"correct":22},"5000",{"key":28,"text":67,"correct":26},"7000",{"key":31,"text":69,"correct":26},"10000",{"id":71,"libraryId":5,"type":15,"typeLabel":16,"stem":72,"options":73,"answer":20,"analysis":33},1258662,"未搞清地质情况就仓促开工，边设计边施工，无图施工，这是施工项目质量问题中（ ）的原因。",[74,75,76,78],{"key":20,"text":55,"correct":22},{"key":24,"text":51,"correct":26},{"key":28,"text":77,"correct":26},"地质勘察失真",{"key":31,"text":79,"correct":26},"施工与管理不到位",{"id":81,"libraryId":5,"type":15,"typeLabel":16,"stem":82,"options":83,"answer":24,"analysis":33},1258663,"工程构造设计要求不符合规范，这是施工项目质量问题中（ ）的原因。",[84,85,86,87],{"key":20,"text":51,"correct":26},{"key":24,"text":53,"correct":22},{"key":28,"text":55,"correct":26},{"key":31,"text":57,"correct":26},{"id":89,"libraryId":5,"type":15,"typeLabel":16,"stem":90,"options":91,"answer":24,"analysis":33},1258664,"在工程建设领域，环境噪声污染的防治主要包括施工现场和（ ）环境噪声污染防治两个方面。",[92,94,96,98],{"key":20,"text":93,"correct":26},"交通运输",{"key":24,"text":95,"correct":22},"建设项目",{"key":28,"text":97,"correct":26},"社会生活",{"key":31,"text":99,"correct":26},"制品加工",{"id":101,"libraryId":5,"type":15,"typeLabel":16,"stem":102,"options":103,"answer":31,"analysis":33},1258665,"建筑工程结构施工阶段噪声限值：白天施工不允许超过70d B，夜间施工不允许超过（ ）。",[104,106,108,110],{"key":20,"text":105,"correct":26},"75dB",{"key":24,"text":107,"correct":26},"85dB",{"key":28,"text":109,"correct":26},"35dB",{"key":31,"text":111,"correct":22},"55dB",{"id":113,"libraryId":5,"type":15,"typeLabel":16,"stem":114,"options":115,"answer":31,"analysis":33},1258666,"根据《企业职工伤亡事故分类标准》，按照工伤事故类别分类，可将工伤事故划分为（ ）类。",[116,118,120,122],{"key":20,"text":117,"correct":26},"3",{"key":24,"text":119,"correct":26},"4",{"key":28,"text":121,"correct":26},"9",{"key":31,"text":123,"correct":22},"20",{"id":125,"libraryId":5,"type":15,"typeLabel":16,"stem":126,"options":127,"answer":31,"analysis":33},1258667,"在分部分项工程施工前，对现场相关管理人员、施工作业人员进行书面安全技术交底的交底人是（ ）。",[128,130,132,134],{"key":20,"text":129,"correct":26},"项目经理",{"key":24,"text":131,"correct":26},"项目执行经理",{"key":28,"text":133,"correct":26},"监理工程师",{"key":31,"text":135,"correct":22},"方案编写人员或技术负责人",{"id":137,"libraryId":5,"type":15,"typeLabel":16,"stem":138,"options":139,"answer":24,"analysis":33},1258668,"对施工日志的书写记录要求，下列说法错误的是（ ）。",[140,142,144,146],{"key":20,"text":141,"correct":26},"实事求是",{"key":24,"text":143,"correct":22},"图文结合",{"key":28,"text":145,"correct":26},"态度认真",{"key":31,"text":147,"correct":26},"字迹清楚",{"id":149,"libraryId":5,"type":15,"typeLabel":16,"stem":150,"options":151,"answer":24,"analysis":33},1258669,"关于安全网的使用要求，说法错误的是（ ）。",[152,154,156,158],{"key":20,"text":153,"correct":26},"禁止随意拆除安全网构件",{"key":24,"text":155,"correct":22},"注意防止摆动碰撞",{"key":28,"text":157,"correct":26},"严禁在网上堆放构件",{"key":31,"text":159,"correct":26},"禁止各种砂浆污染",{"id":161,"libraryId":5,"type":15,"typeLabel":16,"stem":162,"options":163,"answer":31,"analysis":33},1258670,"（ ）是施工人员提高文字书写水平的一个“练兵场”也是工程完成后书写工程或技术小结的查考依据，还是今后撰写论文的锻炼基础。",[164,166,168,170],{"key":20,"text":165,"correct":26},"施工文件",{"key":24,"text":167,"correct":26},"施工资料",{"key":28,"text":169,"correct":26},"施工照片",{"key":31,"text":171,"correct":22},"施工日志",{"id":173,"libraryId":5,"type":15,"typeLabel":16,"stem":174,"options":175,"answer":28,"analysis":33},1258671,"施工单位应针对施工现场可能导致火灾发生的施工作业及其他活动，制定消防安全管理制度，编制施工现场防火方案及（ ）。",[176,178,180,182],{"key":20,"text":177,"correct":26},"施工组织设计",{"key":24,"text":179,"correct":26},"施工专项方案",{"key":28,"text":181,"correct":22},"应急疏散预案",{"key":31,"text":183,"correct":26},"应急演练",{"id":185,"libraryId":5,"type":15,"typeLabel":16,"stem":186,"options":187,"answer":20,"analysis":33},1258672,"施工现场临时用电设备总容量在50kW及以上者，项目部应编制用电的（ ）。",[188,189,191,193],{"key":20,"text":177,"correct":22},{"key":24,"text":190,"correct":26},"专项方案",{"key":28,"text":192,"correct":26},"应急预案",{"key":31,"text":194,"correct":26},"安全用电措施",{"id":196,"libraryId":5,"type":15,"typeLabel":16,"stem":197,"options":198,"answer":28,"analysis":33},1258673,"下列属于施工日志基本内容的是（ ）。",[199,201,203,205],{"key":20,"text":200,"correct":26},"隐蔽工程验收情况",{"key":24,"text":202,"correct":26},"质量检查情况",{"key":28,"text":204,"correct":22},"施工部位",{"key":31,"text":206,"correct":26},"安全检查情况",{"id":208,"libraryId":5,"type":15,"typeLabel":16,"stem":209,"options":210,"answer":20,"analysis":33},1258674,"（ ）是工程实施的写照，这份原始资料是当工程有什么问题或需要数字依据时的查考辅助资料。",[211,212,213,214],{"key":20,"text":171,"correct":22},{"key":24,"text":167,"correct":26},{"key":28,"text":169,"correct":26},{"key":31,"text":165,"correct":26},{"id":216,"libraryId":5,"type":15,"typeLabel":16,"stem":217,"options":218,"answer":28,"analysis":33},1258675,"施工资料是建筑工程在工程施工过程中形成的资料，下列哪一项不属于施工资料（ ）。",[219,221,223,224],{"key":20,"text":220,"correct":26},"施工管理资料",{"key":24,"text":222,"correct":26},"施工物质资料",{"key":28,"text":169,"correct":22},{"key":31,"text":225,"correct":26},"竣工验收资料",{"id":227,"libraryId":5,"type":15,"typeLabel":16,"stem":228,"options":229,"answer":24,"analysis":33},1258676,"技术复核记录是在施工前或施工过程中，由（ ）对工程的施工质量和管理人员的工作质量进行检查的记录表。",[230,232,234,236],{"key":20,"text":231,"correct":26},"建设单位",{"key":24,"text":233,"correct":22},"施工单位",{"key":28,"text":235,"correct":26},"监理单位",{"key":31,"text":237,"correct":26},"质监部门",{"id":239,"libraryId":5,"type":15,"typeLabel":16,"stem":240,"options":241,"answer":20,"analysis":33},1258677,"根据《建设工程监理规范》GB\u002FT50319，施工阶段工程监理工作用表中的A类用表是（ ）。",[242,244,246,248],{"key":20,"text":243,"correct":22},"工程监理单位用表",{"key":24,"text":245,"correct":26},"施工单位报审、报验用表",{"key":28,"text":247,"correct":26},"建设单位用表",{"key":31,"text":249,"correct":26},"工程参与各方通用表",{"id":251,"libraryId":5,"type":15,"typeLabel":16,"stem":252,"options":253,"answer":24,"analysis":33},1258678,"施工组织设计（方案）报审表承包单位必须加盖公章，其（ ）必须签字。",[254,256,257,259],{"key":20,"text":255,"correct":26},"企业负责人",{"key":24,"text":129,"correct":22},{"key":28,"text":258,"correct":26},"方案编制人",{"key":31,"text":260,"correct":26},"单位技术负责人",{"id":262,"libraryId":5,"type":15,"typeLabel":16,"stem":263,"options":264,"answer":28,"analysis":33},1258679,"在混凝土工程施工质量检验批验收记录表中，属于一般项目的是（ ）。",[265,267,269,271],{"key":20,"text":266,"correct":26},"混凝土原材料每盘称量的偏差符合要求",{"key":24,"text":268,"correct":26},"有抗渗要求的混凝土试件同一工程、同一配合比取样不得少于一次",{"key":28,"text":270,"correct":22},"后浇带的留置位置应按设计要求和施工技术方案确定",{"key":31,"text":272,"correct":26},"结构混凝土的强度等级符合设计要求",{"id":274,"libraryId":5,"type":15,"typeLabel":16,"stem":275,"options":276,"answer":31,"analysis":33},1258680,"现浇钢筋混凝土工程检验批质量验收记录是用于现浇混凝土的外观、尺寸检查的表格，其主控项目为（ ）。",[277,279,281,283],{"key":20,"text":278,"correct":26},"轴线位置",{"key":24,"text":280,"correct":26},"垂直度",{"key":28,"text":282,"correct":26},"截面尺寸",{"key":31,"text":284,"correct":22},"外观质量检查有无严重缺陷",{"id":286,"libraryId":5,"type":15,"typeLabel":16,"stem":287,"options":288,"answer":31,"analysis":33},1258681,"建筑工程质量事故处理中不需要的资料是（ ）。",[289,291,293,295],{"key":20,"text":290,"correct":26},"与事故有关的施工图",{"key":24,"text":292,"correct":26},"与施工有关的资料",{"key":28,"text":294,"correct":26},"事故调查分析报告",{"key":31,"text":296,"correct":22},"事故部位的施工操作规程",{"id":298,"libraryId":5,"type":15,"typeLabel":16,"stem":299,"options":300,"answer":28,"analysis":33},1258682,"下列文件中，相关单位不需要审批或书面回复的是（ ）。",[301,303,305,307],{"key":20,"text":302,"correct":26},"监理通知单",{"key":24,"text":304,"correct":26},"工程暂停令",{"key":28,"text":306,"correct":22},"监理联系单",{"key":31,"text":308,"correct":26},"工程临时延期报审表",{"id":310,"libraryId":5,"type":15,"typeLabel":16,"stem":311,"options":312,"answer":20,"analysis":33},1258683,"在钢筋安装工程检验批验收记录表中，属于主控项目的是（ ）。",[313,315,317,319],{"key":20,"text":314,"correct":22},"钢筋的规格和数量",{"key":24,"text":316,"correct":26},"受力钢筋间距",{"key":28,"text":318,"correct":26},"受力钢筋排距",{"key":31,"text":320,"correct":26},"受力钢筋保护层厚度",{"id":322,"libraryId":5,"type":15,"typeLabel":16,"stem":323,"options":324,"answer":20,"analysis":33},1258684,"在混凝土工程施工质量检验批验收记录表中，属于主控项目的是（ ）。",[325,326,328,330],{"key":20,"text":272,"correct":22},{"key":24,"text":327,"correct":26},"施工缝的位置应在混凝土浇筑前确定",{"key":28,"text":329,"correct":26},"混凝土施工缝的处理应按技术方案进行",{"key":31,"text":331,"correct":26},"混凝土浇筑完毕后，应按施工技术方案及时进行养护",{"id":333,"libraryId":5,"type":15,"typeLabel":16,"stem":334,"options":335,"answer":28,"analysis":33},1258685,"工程项目满足开工条件后，总承包单位应该向监理机构报送的表格是（ ）。",[336,338,340,342],{"key":20,"text":337,"correct":26},"施工现场质量检查记录表",{"key":24,"text":339,"correct":26},"施工组织设计报审表",{"key":28,"text":341,"correct":22},"工程开工报审表",{"key":31,"text":343,"correct":26},"工程复工报审表",{"id":345,"libraryId":5,"type":15,"typeLabel":16,"stem":346,"options":347,"answer":28,"analysis":33},1258686,"钢筋加工检验批质量验收记录表中属于主控项目的是（ ）。",[348,350,352,354],{"key":20,"text":349,"correct":26},"钢筋的级别",{"key":24,"text":351,"correct":26},"钢筋的种类",{"key":28,"text":353,"correct":22},"受力钢筋的弯钩和弯折应符合要求",{"key":31,"text":355,"correct":26},"弯起钢筋的弯折位置偏差",{"id":357,"libraryId":5,"type":15,"typeLabel":16,"stem":358,"options":359,"answer":31,"analysis":33},1258687,"不需要在地基验槽记录表中签字的单位是（ ）。",[360,362,364,365],{"key":20,"text":361,"correct":26},"勘察单位",{"key":24,"text":363,"correct":26},"设计单位",{"key":28,"text":231,"correct":26},{"key":31,"text":366,"correct":22},"质量监督站",{"id":368,"libraryId":5,"type":15,"typeLabel":16,"stem":369,"options":370,"answer":31,"analysis":33},1258688,"当监理单位下达工程暂停令后，施工单位经过整改、返工等达到要求后，应该向监理单位报送（ ）。",[371,373,375,377],{"key":20,"text":372,"correct":26},"监理回复",{"key":24,"text":374,"correct":26},"工程开工审批表",{"key":28,"text":376,"correct":26},"工程复工令",{"key":31,"text":378,"correct":22},"工程复工审批表",{"id":380,"libraryId":5,"type":15,"typeLabel":16,"stem":381,"options":382,"answer":28,"analysis":33},1258689,"工程开工报审表中可以不注明的项目是（ ）。",[383,385,387,389],{"key":20,"text":384,"correct":26},"施工许可证已办理",{"key":24,"text":386,"correct":26},"征地拆迁",{"key":28,"text":388,"correct":22},"分包单位全部落实",{"key":31,"text":390,"correct":26},"施工组织审查情况",{"id":392,"libraryId":5,"type":15,"typeLabel":16,"stem":393,"options":394,"answer":31,"analysis":33},1258690,"三元乙丙橡胶防水卷材属于（ ）。",[395,397,399,401],{"key":20,"text":396,"correct":26},"石油沥青防水卷材",{"key":24,"text":398,"correct":26},"煤油沥青防水卷材",{"key":28,"text":400,"correct":26},"高聚物改性沥青防水卷材",{"key":31,"text":402,"correct":22},"合成高分子防水卷材",{"id":404,"libraryId":5,"type":15,"typeLabel":16,"stem":405,"options":406,"answer":28,"analysis":33},1258691,"碳素结构钢和低合金钢在加热矫正时，加热温度不应超过（ ）℃。",[407,409,411,413],{"key":20,"text":408,"correct":26},"700",{"key":24,"text":410,"correct":26},"800",{"key":28,"text":412,"correct":22},"900",{"key":31,"text":414,"correct":26},"1000",{"id":416,"libraryId":5,"type":15,"typeLabel":16,"stem":417,"options":418,"answer":28,"analysis":33},1258692,"下列哪一项不是施工准备所包括的内容（ ）。",[419,421,423,425],{"key":20,"text":420,"correct":26},"技术准备",{"key":24,"text":422,"correct":26},"资金准备",{"key":28,"text":424,"correct":22},"机械准备",{"key":31,"text":426,"correct":26},"现场准备",{"id":428,"libraryId":5,"type":15,"typeLabel":16,"stem":429,"options":430,"answer":24,"analysis":33},1258693,"当屋面坡度大于15%或者受振动时，为防止卷材下滑，防水卷材的铺贴要求为（ ）。",[431,433,435,437],{"key":20,"text":432,"correct":26},"平行于屋脊",{"key":24,"text":434,"correct":22},"垂直于屋脊",{"key":28,"text":436,"correct":26},"中间平行于屋脊，靠墙处垂直于屋脊",{"key":31,"text":438,"correct":26},"中间垂直于屋脊，靠墙处平行于屋脊",{"id":440,"libraryId":5,"type":15,"typeLabel":16,"stem":441,"options":442,"answer":24,"analysis":33},1258694,"下列关于柱模板的说法错误的是（ ）。",[443,445,447,449],{"key":20,"text":444,"correct":26},"柱模板底部开有清理孔",{"key":24,"text":446,"correct":22},"沿高度每隔1.5m开有浇筑孔",{"key":28,"text":448,"correct":26},"柱底部一般有一钉在底部混凝土上的木框，用来固定柱模板的位置。",{"key":31,"text":450,"correct":26},"柱模之间还要用水平撑及剪刀撑相互拉结",{"id":452,"libraryId":5,"type":15,"typeLabel":16,"stem":453,"options":454,"answer":24,"analysis":33},1258695,"砖砌体的施工工艺过程正确是的（ ）。",[455,457,459,461],{"key":20,"text":456,"correct":26},"抄平、放线、摆砖、盘角、挂线、立皮数杆、砌筑、勾缝、清理等",{"key":24,"text":458,"correct":22},"抄平、放线、摆砖、立皮数杆、盘角、挂线、砌筑、勾缝、清理等",{"key":28,"text":460,"correct":26},"抄平、放线、摆砖、立皮数杆、挂线、盘角、砌筑、勾缝、清理等",{"key":31,"text":462,"correct":26},"抄平、放线、立皮数杆、摆砖、盘角、挂线、砌筑、勾缝、清理等",{"id":464,"libraryId":5,"type":15,"typeLabel":16,"stem":465,"options":466,"answer":31,"analysis":33},1258696,"采用细石混凝土刚性防水屋面时，细石混凝土防水层与基层间宜设置（ ）。",[467,469,471,473],{"key":20,"text":468,"correct":26},"保温层",{"key":24,"text":470,"correct":26},"找平层",{"key":28,"text":472,"correct":26},"保护层",{"key":31,"text":474,"correct":22},"隔离层",{"id":476,"libraryId":5,"type":15,"typeLabel":16,"stem":477,"options":478,"answer":24,"analysis":33},1258697,"在集水井降水法中，集水井应每隔20～40m设置一个，其深度随着挖土深度加深而加深，但要始终低于挖土面（ ）m。",[479,481,483,485],{"key":20,"text":480,"correct":26},"0.5～1.0",{"key":24,"text":482,"correct":22},"0.7～1.0",{"key":28,"text":484,"correct":26},"0.5～0.7",{"key":31,"text":486,"correct":26},"0.7～1.2",{"id":488,"libraryId":5,"type":15,"typeLabel":16,"stem":489,"options":490,"answer":20,"analysis":33},1258698,"钢材切割面或剪切面应无（ ）缺陷。",[491,493,495,497],{"key":20,"text":492,"correct":22},"裂纹",{"key":24,"text":494,"correct":26},"气孔",{"key":28,"text":496,"correct":26},"砂眼",{"key":31,"text":498,"correct":26},"缺棱",{"id":500,"libraryId":5,"type":15,"typeLabel":16,"stem":501,"options":502,"answer":31,"analysis":33},1258699,"钢柱校正工作不包括（ ）。",[503,505,507,509],{"key":20,"text":504,"correct":26},"柱基标高调整",{"key":24,"text":506,"correct":26},"对准纵横十字线",{"key":28,"text":508,"correct":26},"柱身垂直度",{"key":31,"text":510,"correct":22},"柱身高度",{"id":512,"libraryId":5,"type":15,"typeLabel":16,"stem":513,"options":514,"answer":28,"analysis":33},1258700,"填土压实可采用人工压实，也可采用机械压实，下列哪一项不是机械压实的方法（ ）。",[515,517,519,521],{"key":20,"text":516,"correct":26},"碾压法",{"key":24,"text":518,"correct":26},"夯实法",{"key":28,"text":520,"correct":22},"综合法",{"key":31,"text":522,"correct":26},"振动压实法",{"id":524,"libraryId":5,"type":15,"typeLabel":16,"stem":525,"options":526,"answer":24,"analysis":33},1258701,"施工组织设计应由施工单位（ ）或其授权的技术人员审批。",[527,529,531,532],{"key":20,"text":528,"correct":26},"法人代表",{"key":24,"text":530,"correct":22},"技术负责人",{"key":28,"text":129,"correct":26},{"key":31,"text":533,"correct":26},"项目技术负责人",{"id":535,"libraryId":5,"type":15,"typeLabel":16,"stem":536,"options":537,"answer":24,"analysis":33},1258702,"施工缝一般应留在结构（ ）的部位。",[538,540,542,544],{"key":20,"text":539,"correct":26},"受压较小、便于施工",{"key":24,"text":541,"correct":22},"受剪较小、便于施工",{"key":28,"text":543,"correct":26},"受弯较小、便于施工",{"key":31,"text":545,"correct":26},"受扭较小、便于施工",{"id":547,"libraryId":5,"type":15,"typeLabel":16,"stem":548,"options":549,"answer":28,"analysis":33},1258703,"当混凝土浇筑深度超过（ ）m时，应采用带节管的振动串筒，即在串筒上每隔2～3节管安装一台振动器。",[550,552,554,556],{"key":20,"text":551,"correct":26},"6",{"key":24,"text":553,"correct":26},"7",{"key":28,"text":555,"correct":22},"8",{"key":31,"text":121,"correct":26},{"id":558,"libraryId":5,"type":15,"typeLabel":16,"stem":559,"options":560,"answer":24,"analysis":33},1258704,"预制桩在堆放时，地面必须平整、坚实，堆放层数不宜超过（ ）层，不同规格的桩应分别堆放。",[561,562,563,565],{"key":20,"text":117,"correct":26},{"key":24,"text":119,"correct":22},{"key":28,"text":564,"correct":26},"5",{"key":31,"text":551,"correct":26},{"id":567,"libraryId":5,"type":15,"typeLabel":16,"stem":568,"options":569,"answer":24,"analysis":33},1258705,"参加专家论证会的专家组成员应当有（ ）名及以上符合相关专业要求的专家组成。",[570,571,572,573],{"key":20,"text":117,"correct":26},{"key":24,"text":564,"correct":22},{"key":28,"text":551,"correct":26},{"key":31,"text":553,"correct":26},{"id":575,"libraryId":5,"type":15,"typeLabel":16,"stem":576,"options":577,"answer":24,"analysis":33},1258706,"（ ）是施工方案的核心，关系专项工程实施的成败。",[578,580,582,584],{"key":20,"text":579,"correct":26},"施工进度计划",{"key":24,"text":581,"correct":22},"施工安排",{"key":28,"text":583,"correct":26},"施工准备",{"key":31,"text":585,"correct":26},"施工方法",{"id":587,"libraryId":5,"type":15,"typeLabel":16,"stem":588,"options":589,"answer":20,"analysis":33},1258707,"地下室墙体做好后，直接把防水层贴在防水层结构的外墙外表面，最后砌保护墙的施工方法是（ ）。",[590,592,594,596],{"key":20,"text":591,"correct":22},"外防外贴法",{"key":24,"text":593,"correct":26},"内防外贴法",{"key":28,"text":595,"correct":26},"外防内贴法",{"key":31,"text":597,"correct":26},"内防内贴法",[599,602,605,608,611,614],{"id":15,"name":600,"category":7,"favorite":601},"领导干部任职前廉政法规知识测试题",92,{"id":603,"name":604,"category":7,"favorite":15},595,"建筑结构与设备",{"id":606,"name":607,"category":7,"favorite":15},715,"招标采购专业知识与法律法规",{"id":609,"name":610,"category":7,"favorite":15},848,"市政方向-通用基础",{"id":612,"name":613,"category":7,"favorite":8},534,"BIM工程师",{"id":615,"name":613,"category":7,"favorite":8},535]