[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"lib-842-6":3},{"library":4,"page":9,"limit":10,"total":11,"questions":12,"related":596},{"id":5,"name":6,"category":7,"favorite":8},842,"(土建施工)专业管理实务 岗位知识","建筑工程",0,6,50,892,[13,34,46,58,70,82,94,106,116,128,140,152,164,176,188,200,212,223,233,242,254,266,278,290,302,314,324,334,346,358,366,378,390,402,414,426,437,449,461,471,483,495,507,519,530,542,553,564,574,586],{"id":14,"libraryId":5,"type":15,"typeLabel":16,"stem":17,"options":18,"answer":30,"analysis":33},1258557,1,"单选题","施工作业计划分月施工作业计划和旬（周）施工作业计划。下列选项中不属于其内容的为（ ）。",[19,23,26,29],{"key":20,"text":21,"correct":22},"A","本月、旬（周）应完成的施工任务",false,{"key":24,"text":25,"correct":22},"B","完成作业计划任务所需的劳力、材料、半成品、构配件等的需用量",{"key":27,"text":28,"correct":22},"C","提高劳动生产率的措施和节约措施",{"key":30,"text":31,"correct":32},"D","质量计划",true,"",{"id":35,"libraryId":5,"type":15,"typeLabel":16,"stem":36,"options":37,"answer":24,"analysis":33},1258558,"工程项目资源的特点不包括（ ）。",[38,40,42,44],{"key":20,"text":39,"correct":22},"工程所需资源的种类多、需求量大",{"key":24,"text":41,"correct":32},"工程所需资金的数量大",{"key":27,"text":43,"correct":22},"工程项目建设过程的不均衡性",{"key":30,"text":45,"correct":22},"资源对项目成本的影响大",{"id":47,"libraryId":5,"type":15,"typeLabel":16,"stem":48,"options":49,"answer":20,"analysis":33},1258559,"利用横道图调整施工项目进度计划前，首先应做的是（ ）。",[50,52,54,56],{"key":20,"text":51,"correct":32},"分析进度偏差产生的原因",{"key":24,"text":53,"correct":22},"分析进度偏差对后续工作和总工期的影响",{"key":27,"text":55,"correct":22},"确定后续工作和总工期的限制条件",{"key":30,"text":57,"correct":22},"实施调整后的进度计划",{"id":59,"libraryId":5,"type":15,"typeLabel":16,"stem":60,"options":61,"answer":24,"analysis":33},1258560,"下列关于网络计划的说法，正确的是（ ）。",[62,64,66,68],{"key":20,"text":63,"correct":22},"一个网络计划只有一条关键线路",{"key":24,"text":65,"correct":32},"一个网络计划可能有多条关键线路",{"key":27,"text":67,"correct":22},"网络图的编号顺序应从小到大，必须连续，且不得重复",{"key":30,"text":69,"correct":22},"网络计划中允许存在循环线路",{"id":71,"libraryId":5,"type":15,"typeLabel":16,"stem":72,"options":73,"answer":24,"analysis":33},1258561,"流水施工的基本参数不包括下列哪一项（ ）。",[74,76,78,80],{"key":20,"text":75,"correct":22},"时间参数",{"key":24,"text":77,"correct":32},"技术参数",{"key":27,"text":79,"correct":22},"工艺参数",{"key":30,"text":81,"correct":22},"空间参数",{"id":83,"libraryId":5,"type":15,"typeLabel":16,"stem":84,"options":85,"answer":24,"analysis":33},1258562,"施工任务书是向班组下达任务，实行责任承包、全面管理和原始记录的综合性文件，应由（ ）按班组编制并下达。",[86,88,90,92],{"key":20,"text":87,"correct":22},"项目经理",{"key":24,"text":89,"correct":32},"施工员",{"key":27,"text":91,"correct":22},"监理员",{"key":30,"text":93,"correct":22},"监理工程师",{"id":95,"libraryId":5,"type":15,"typeLabel":16,"stem":96,"options":97,"answer":20,"analysis":33},1258563,"下列不属于施工进度计划的调整方法的是（ ）。",[98,100,102,104],{"key":20,"text":99,"correct":32},"加强安全教育",{"key":24,"text":101,"correct":22},"增加资源投入",{"key":27,"text":103,"correct":22},"增减工作范围",{"key":30,"text":105,"correct":22},"提高劳动效率",{"id":107,"libraryId":5,"type":15,"typeLabel":16,"stem":108,"options":109,"answer":30,"analysis":33},1258564,"某建筑公司总承包某电子厂改扩建工程，在施工准备阶段项目经理组织编制了项目总进度计划和项目资源配置计划。结合上述资料，回答下列问题： 关于工程项目资源特点的说法，错误的是（ ）。",[110,112,113,114],{"key":20,"text":111,"correct":22},"工程所需的资源的种类多、需求量大",{"key":24,"text":43,"correct":22},{"key":27,"text":45,"correct":22},{"key":30,"text":115,"correct":32},"资源是固定不变的",{"id":117,"libraryId":5,"type":15,"typeLabel":16,"stem":118,"options":119,"answer":20,"analysis":33},1258565,"资源配置计划不包括下列哪一项（ ）。",[120,122,124,126],{"key":20,"text":121,"correct":32},"临时设施计划",{"key":24,"text":123,"correct":22},"主要材料配置计划",{"key":27,"text":125,"correct":22},"施工机具配置计划",{"key":30,"text":127,"correct":22},"构配件配置计划",{"id":129,"libraryId":5,"type":15,"typeLabel":16,"stem":130,"options":131,"answer":27,"analysis":33},1258566,"在网络计划的执行过程中检查发现，D工作的总时差由3d变成了1d，则说明d工作的实际进度（ ）。",[132,134,136,138],{"key":20,"text":133,"correct":22},"拖后2d，影响工期2d",{"key":24,"text":135,"correct":22},"拖后3d，影响工期2d",{"key":27,"text":137,"correct":32},"拖后2d，对工期无影响",{"key":30,"text":139,"correct":22},"拖后3d，对工期无影响",{"id":141,"libraryId":5,"type":15,"typeLabel":16,"stem":142,"options":143,"answer":30,"analysis":33},1258568,"关于双代号网络图中节点的说法，错误的是（ ）。",[144,146,148,150],{"key":20,"text":145,"correct":22},"节点表小前面工作结束和后面工作开始的瞬间，所以它不需要消耗时间和资源",{"key":24,"text":147,"correct":22},"箭线的箭尾节点表示该工作的开始，箭线的箭头节点表示该工作的结束",{"key":27,"text":149,"correct":22},"根据节点在网络图中的位置不同可分为起点节点、终点节点和中间节点",{"key":30,"text":151,"correct":32},"箭头节点编号必须小于箭尾节点编号",{"id":153,"libraryId":5,"type":15,"typeLabel":16,"stem":154,"options":155,"answer":20,"analysis":33},1258569,"网络图中同时存在”条关键线路，则每条关键线路上各工作过程的持续时间之和（ ）。",[156,158,160,162],{"key":20,"text":157,"correct":32},"都相同",{"key":24,"text":159,"correct":22},"都不相同",{"key":27,"text":161,"correct":22},"都有一条最长的",{"key":30,"text":163,"correct":22},"都有",{"id":165,"libraryId":5,"type":15,"typeLabel":16,"stem":166,"options":167,"answer":20,"analysis":33},1258570,"施工进度计划的审核内容不包括（ ）。",[168,170,172,174],{"key":20,"text":169,"correct":32},"进度安排是否符合上级规定",{"key":24,"text":171,"correct":22},"施工进度计划中的内容是否有遗漏，分期施工是否满足分批交工的需要和配套交工的要求",{"key":27,"text":173,"correct":22},"施工顺序安排是否符合施工程序的要求",{"key":30,"text":175,"correct":22},"资源供应计划是否能保证施工进度计划的实现，供应是否均衡，分包人供应的资源是否满足进度要求",{"id":177,"libraryId":5,"type":15,"typeLabel":16,"stem":178,"options":179,"answer":24,"analysis":33},1258571,"下列不属于施工进度计划检查方法的是（ ）。",[180,182,184,186],{"key":20,"text":181,"correct":22},"跟踪检查施工实际进度",{"key":24,"text":183,"correct":32},"因果分析法",{"key":27,"text":185,"correct":22},"对比分析实际进度与计划进度",{"key":30,"text":187,"correct":22},"整理统计检查数据",{"id":189,"libraryId":5,"type":15,"typeLabel":16,"stem":190,"options":191,"answer":24,"analysis":33},1258572,"某工程项目为等节奏流水，且施工段数m=2，流水节拍t=4，则流水步距K为（ ）。",[192,194,196,198],{"key":20,"text":193,"correct":22},"2",{"key":24,"text":195,"correct":32},"4",{"key":27,"text":197,"correct":22},"6",{"key":30,"text":199,"correct":22},"8",{"id":201,"libraryId":5,"type":15,"typeLabel":16,"stem":202,"options":203,"answer":20,"analysis":33},1258573,"均衡施工的指标不包括（ ）。",[204,206,208,210],{"key":20,"text":205,"correct":32},"均衡系数",{"key":24,"text":207,"correct":22},"不均衡系数",{"key":27,"text":209,"correct":22},"极差值",{"key":30,"text":211,"correct":22},"均方差值",{"id":213,"libraryId":5,"type":15,"typeLabel":16,"stem":214,"options":215,"answer":24,"analysis":33},1258574,"某建筑公司总承包某电子厂改扩建工程，在施工准备阶段项目经理组织编制了项目总进度计划和项目资源配置计划。结合上述资料，回答下列问题： 总承包单位的施工总进度计划一般由（ ）组织编制。",[216,217,219,221],{"key":20,"text":87,"correct":22},{"key":24,"text":218,"correct":32},"企业技术负责人",{"key":27,"text":220,"correct":22},"项目技术负责人",{"key":30,"text":222,"correct":22},"专业施工员",{"id":224,"libraryId":5,"type":15,"typeLabel":16,"stem":225,"options":226,"answer":27,"analysis":33},1258575,"分部（分项）工程的施工进度计划通常由（ ）编制。",[227,228,229,231],{"key":20,"text":87,"correct":22},{"key":24,"text":220,"correct":22},{"key":27,"text":230,"correct":32},"专业工程师或负责分部分项的工长",{"key":30,"text":232,"correct":22},"施工班组长",{"id":234,"libraryId":5,"type":15,"typeLabel":16,"stem":235,"options":236,"answer":27,"analysis":33},1258576,"某建筑公司总承包某电子厂改扩建工程，在施工准备阶段项目经理组织编制了项目总进度计划和项目资源配置计划。结合上述资料，回答下列问题： 资源平衡指标中，每天计划需要量与每天平均需要量之差的平方和的平均值是（ ）。",[237,238,239,240],{"key":20,"text":207,"correct":22},{"key":24,"text":209,"correct":22},{"key":27,"text":211,"correct":32},{"key":30,"text":241,"correct":22},"平均值",{"id":243,"libraryId":5,"type":15,"typeLabel":16,"stem":244,"options":245,"answer":30,"analysis":33},1258577,"下列间歇时间中，属于组织间歇时间的是（ ）。",[246,248,250,252],{"key":20,"text":247,"correct":22},"混凝土浇筑后的养护时间",{"key":24,"text":249,"correct":22},"抹灰后的干燥时间",{"key":27,"text":251,"correct":22},"油漆后的干燥时间",{"key":30,"text":253,"correct":32},"隐蔽过程的检查验收",{"id":255,"libraryId":5,"type":15,"typeLabel":16,"stem":256,"options":257,"answer":30,"analysis":33},1258578,"施工任务书是向班组下达任务，实行责任承包、全面管理和原始记录的综合性文件，它是计划和实施的纽带，其不包括（ ）。",[258,260,262,264],{"key":20,"text":259,"correct":22},"施工任务单",{"key":24,"text":261,"correct":22},"限额领料单",{"key":27,"text":263,"correct":22},"考勤表",{"key":30,"text":265,"correct":32},"施工进度表",{"id":267,"libraryId":5,"type":15,"typeLabel":16,"stem":268,"options":269,"answer":30,"analysis":33},1258579,"下列（ ）不属于施工进度计划编制依据。",[270,272,274,276],{"key":20,"text":271,"correct":22},"约束条件",{"key":24,"text":273,"correct":22},"工程的工期要求及开工、竣工日期",{"key":27,"text":275,"correct":22},"资源需求",{"key":30,"text":277,"correct":32},"施工方法",{"id":279,"libraryId":5,"type":15,"typeLabel":16,"stem":280,"options":281,"answer":27,"analysis":33},1258580,"当双代号网络计划的计算工期等于计划工期时，对关键工作的说法错误的是（ ）。",[282,284,286,288],{"key":20,"text":283,"correct":22},"关键工作的自由时差为零",{"key":24,"text":285,"correct":22},"关键工作的最早完成时间与最迟完成时间相等",{"key":27,"text":287,"correct":32},"关键工作的持续时间最长",{"key":30,"text":289,"correct":22},"关键工作的最早开始时间与最迟开始时间相等",{"id":291,"libraryId":5,"type":15,"typeLabel":16,"stem":292,"options":293,"answer":27,"analysis":33},1258581,"当实际施工进度发生拖延时，为加快施工进度而采取的组织措施可以是（ ）。",[294,296,298,300],{"key":20,"text":295,"correct":22},"改善劳动条件及外部配合条件",{"key":24,"text":297,"correct":22},"更换设备，采用更先进的施工机械",{"key":27,"text":299,"correct":32},"增加劳动力和施工机械的数量",{"key":30,"text":301,"correct":22},"改进施工工艺和施工技术",{"id":303,"libraryId":5,"type":15,"typeLabel":16,"stem":304,"options":305,"answer":27,"analysis":33},1258582,"关于横道图施工进度计划的优点，说法正确的是（ ）。",[306,308,310,312],{"key":20,"text":307,"correct":22},"能反映各项工作之间关系",{"key":24,"text":309,"correct":22},"能反映影响工期的关键线路和关键工作",{"key":27,"text":311,"correct":32},"直观、方便，应用范围广",{"key":30,"text":313,"correct":22},"反映工作具有机动时间7",{"id":315,"libraryId":5,"type":15,"typeLabel":16,"stem":316,"options":317,"answer":27,"analysis":33},1258583,"该工程开始起扣工程预付款的时间是（ ）月份。",[318,319,321,322],{"key":20,"text":197,"correct":22},{"key":24,"text":320,"correct":22},"7",{"key":27,"text":199,"correct":32},{"key":30,"text":323,"correct":22},"9",{"id":325,"libraryId":5,"type":15,"typeLabel":16,"stem":326,"options":327,"answer":24,"analysis":33},1258584,"根据该工程背景的描述，可以得出工程预付款应该在（ ）个月均匀扣除。",[328,329,331,332],{"key":20,"text":193,"correct":22},{"key":24,"text":330,"correct":32},"3",{"key":27,"text":195,"correct":22},{"key":30,"text":333,"correct":22},"5",{"id":335,"libraryId":5,"type":15,"typeLabel":16,"stem":336,"options":337,"answer":24,"analysis":33},1258585,"某建筑工程，合同总价为700万元，工期为5个月，施工单位按照合同约定，按期完成了合同约定的工程项目并一次验收合格，在合同执行期间，按照当地造价管理部门有关规定，整个施工期间建筑材料和设备价差上调10%，根据测算，该工程的建筑材料和设备费占施工产值的比重为60%，工程质量保证金为建筑安装工程造价的3%，竣工验收合格后第三年，该工程发生屋面渗漏，建设单位多次催促施工单位修理，乙方一再拖延，最后建设单位请另一家施工单位修理，修理费5万元。 该工程竣工结算时，施工单位可得到的结算工程款为（ ）万元。",[338,340,342,344],{"key":20,"text":339,"correct":22},"700.00",{"key":24,"text":341,"correct":32},"719.74",{"key":27,"text":343,"correct":22},"740.50",{"key":30,"text":345,"correct":22},"742.00",{"id":347,"libraryId":5,"type":15,"typeLabel":16,"stem":348,"options":349,"answer":24,"analysis":33},1258586,"该工程在第二年1、6月份业主应该支付给承包商的工程款为（ ）万元。",[350,352,354,356],{"key":20,"text":351,"correct":22},"560.00",{"key":24,"text":353,"correct":32},"986.14",{"key":27,"text":355,"correct":22},"1009.44",{"key":30,"text":357,"correct":22},"171.00",{"id":359,"libraryId":5,"type":15,"typeLabel":16,"stem":360,"options":361,"answer":24,"analysis":33},1258587,"该工程的工程预付款应该从第（ ）个月开始扣留。",[362,363,364,365],{"key":20,"text":193,"correct":22},{"key":24,"text":330,"correct":32},{"key":27,"text":195,"correct":22},{"key":30,"text":333,"correct":22},{"id":367,"libraryId":5,"type":15,"typeLabel":16,"stem":368,"options":369,"answer":24,"analysis":33},1258588,"该工程的预付款为（ ）万元。",[370,372,374,376],{"key":20,"text":371,"correct":22},"10.80",{"key":24,"text":373,"correct":32},"11.77",{"key":27,"text":375,"correct":22},"11.88",{"key":30,"text":377,"correct":22},"13.02",{"id":379,"libraryId":5,"type":15,"typeLabel":16,"stem":380,"options":381,"answer":30,"analysis":33},1258589,"该工程预计合同价为（ ）万元。",[382,384,386,388],{"key":20,"text":383,"correct":22},"130.60",{"key":24,"text":385,"correct":22},"135.05",{"key":27,"text":387,"correct":22},"139.56",{"key":30,"text":389,"correct":32},"144.32",{"id":391,"libraryId":5,"type":15,"typeLabel":16,"stem":392,"options":393,"answer":27,"analysis":33},1258590,"工程预付款的起扣点是（ ）万元。",[394,396,398,400],{"key":20,"text":395,"correct":22},"550",{"key":24,"text":397,"correct":22},"880",{"key":27,"text":399,"correct":32},"1320",{"key":30,"text":401,"correct":22},"2200",{"id":403,"libraryId":5,"type":15,"typeLabel":16,"stem":404,"options":405,"answer":27,"analysis":33},1258591,"扣除质量保证金后，本工程第2个月发包人应该向承包人付的剩余工程款应为（ ）万元。",[406,408,410,412],{"key":20,"text":407,"correct":22},"14.40",{"key":24,"text":409,"correct":22},"18.00",{"key":27,"text":411,"correct":32},"30.78",{"key":30,"text":413,"correct":22},"32.40",{"id":415,"libraryId":5,"type":15,"typeLabel":16,"stem":416,"options":417,"answer":27,"analysis":33},1258592,"根据该工程实际完成的工程量产值，每月扣回的工程预付款为（ ）万元。（单题）",[418,420,422,424],{"key":20,"text":419,"correct":22},"3.816",{"key":24,"text":421,"correct":22},"4.770",{"key":27,"text":423,"correct":32},"6.360",{"key":30,"text":425,"correct":22},"9.540",{"id":427,"libraryId":5,"type":15,"typeLabel":16,"stem":428,"options":429,"answer":24,"analysis":33},1258593,"该工程在背景条件中承包商将拿到的工程预付款是（ ）万元。",[430,432,433,435],{"key":20,"text":431,"correct":22},"352",{"key":24,"text":395,"correct":32},{"key":27,"text":434,"correct":22},"650",{"key":30,"text":436,"correct":22},"750",{"id":438,"libraryId":5,"type":15,"typeLabel":16,"stem":439,"options":440,"answer":20,"analysis":33},1258594,"该工程7月份业主应该支付给承包商的工程款为（ ）万元。",[441,443,445,447],{"key":20,"text":442,"correct":32},"130.10",{"key":24,"text":444,"correct":22},"139.10",{"key":27,"text":446,"correct":22},"144.50",{"key":30,"text":448,"correct":22},"1100.00",{"id":450,"libraryId":5,"type":15,"typeLabel":16,"stem":451,"options":452,"answer":24,"analysis":33},1258595,"该工程的工程预付款是（ ）万元。",[453,455,457,459],{"key":20,"text":454,"correct":22},"15.00",{"key":24,"text":456,"correct":32},"19.08",{"key":27,"text":458,"correct":22},"20.09",{"key":30,"text":460,"correct":22},"22.32",{"id":462,"libraryId":5,"type":15,"typeLabel":16,"stem":463,"options":464,"answer":24,"analysis":33},1258596,"该工程在合同第2年的工程预付款为（ ）万元。",[465,467,468,469],{"key":20,"text":466,"correct":22},"277.50",{"key":24,"text":395,"correct":32},{"key":27,"text":434,"correct":22},{"key":30,"text":470,"correct":22},"1200",{"id":472,"libraryId":5,"type":15,"typeLabel":16,"stem":473,"options":474,"answer":24,"analysis":33},1258597,"该工程的材料预付款为（ ）万元。",[475,477,479,481],{"key":20,"text":476,"correct":22},"18.52",{"key":24,"text":478,"correct":32},"20.46",{"key":27,"text":480,"correct":22},"26.12",{"key":30,"text":482,"correct":22},"26.51",{"id":484,"libraryId":5,"type":15,"typeLabel":16,"stem":485,"options":486,"answer":27,"analysis":33},1258598,"专业工程的暂估价一般应是综合单价，不包括（ ）。",[487,489,491,493],{"key":20,"text":488,"correct":22},"施工机具使用费",{"key":24,"text":490,"correct":22},"材料费",{"key":27,"text":492,"correct":32},"规费",{"key":30,"text":494,"correct":22},"人工费",{"id":496,"libraryId":5,"type":15,"typeLabel":16,"stem":497,"options":498,"answer":20,"analysis":33},1258599,"第六个月承包商完成的工程量累计为6200m3，按照合同可以进行调价的工程量为（ ）m3。",[499,501,503,505],{"key":20,"text":500,"correct":32},"105",{"key":24,"text":502,"correct":22},"795",{"key":27,"text":504,"correct":22},"800",{"key":30,"text":506,"correct":22},"900",{"id":508,"libraryId":5,"type":15,"typeLabel":16,"stem":509,"options":510,"answer":24,"analysis":33},1258600,"施工过程中，工序质量控制的步骤不包括（ ）。",[511,513,515,517],{"key":20,"text":512,"correct":22},"实测",{"key":24,"text":514,"correct":32},"计算",{"key":27,"text":516,"correct":22},"分析",{"key":30,"text":518,"correct":22},"判断",{"id":520,"libraryId":5,"type":15,"typeLabel":16,"stem":521,"options":522,"answer":27,"analysis":33},1258601,"某工程项目桩基工程采用套管成孔灌注桩，为了保证施工质量，桩管灌满混凝土后开始拔管，按照规定，管内应保持不少于（ ）m高的混凝土。",[523,525,527,528],{"key":20,"text":524,"correct":22},"1",{"key":24,"text":526,"correct":22},"1.5",{"key":27,"text":193,"correct":32},{"key":30,"text":529,"correct":22},"2.5",{"id":531,"libraryId":5,"type":15,"typeLabel":16,"stem":532,"options":533,"answer":30,"analysis":33},1258602,"材料质量控制的内容不包括下列哪一项（ ）。",[534,536,538,540],{"key":20,"text":535,"correct":22},"控制材料的性能、标准与设计文件的相符性",{"key":24,"text":537,"correct":22},"控制材料进场验收程序及质量文件资料的齐全程度",{"key":27,"text":539,"correct":22},"控制材料各项技术性能指标、检验测试指标与标准要求的相符性",{"key":30,"text":541,"correct":32},"控制材料的力学性能满足要求",{"id":543,"libraryId":5,"type":15,"typeLabel":16,"stem":544,"options":545,"answer":30,"analysis":33},1258603,"在质量管理体系中使用四类文件，按其适用的范围可分为通用性文件和专用性文件，下列选项中属于通用性文件的是（ ）。",[546,548,549,551],{"key":20,"text":547,"correct":22},"质量目标",{"key":24,"text":31,"correct":22},{"key":27,"text":550,"correct":22},"质量控制文件",{"key":30,"text":552,"correct":32},"质量方针政策",{"id":554,"libraryId":5,"type":15,"typeLabel":16,"stem":555,"options":556,"answer":20,"analysis":33},1258604,"施工过程中，隐蔽工程在隐蔽前应通知（ ）进行验收，并形成验收文件。",[557,559,561,563],{"key":20,"text":558,"correct":32},"建设单位",{"key":24,"text":560,"correct":22},"施工单位",{"key":27,"text":562,"correct":22},"质检单位",{"key":30,"text":93,"correct":22},{"id":565,"libraryId":5,"type":15,"typeLabel":16,"stem":566,"options":567,"answer":24,"analysis":33},1258605,"在质量管理体系中使用四类文件，按其适用的范围可分为通用性文件和专用性文件，下列选项中属于专项性文件的是（ ）。",[568,570,571,573],{"key":20,"text":569,"correct":22},"质量手册",{"key":24,"text":31,"correct":32},{"key":27,"text":572,"correct":22},"程序文件",{"key":30,"text":552,"correct":22},{"id":575,"libraryId":5,"type":15,"typeLabel":16,"stem":576,"options":577,"answer":30,"analysis":33},1258606,"某工程项目桩基工程采用套管成孔灌注桩，则按照规定，预制桩尖的混凝土强度等级应大于（ ）。",[578,580,582,584],{"key":20,"text":579,"correct":22},"C35",{"key":24,"text":581,"correct":22},"C25",{"key":27,"text":583,"correct":22},"C40",{"key":30,"text":585,"correct":32},"C30",{"id":587,"libraryId":5,"type":15,"typeLabel":16,"stem":588,"options":589,"answer":27,"analysis":33},1258607,"质量交底包括质量验收标准和（ ）。",[590,591,593,595],{"key":20,"text":569,"correct":22},{"key":24,"text":592,"correct":22},"质量验收目标",{"key":27,"text":594,"correct":32},"施工技术",{"key":30,"text":277,"correct":22},[597,600,603,606,609,612],{"id":15,"name":598,"category":7,"favorite":599},"领导干部任职前廉政法规知识测试题",92,{"id":601,"name":602,"category":7,"favorite":15},595,"建筑结构与设备",{"id":604,"name":605,"category":7,"favorite":15},715,"招标采购专业知识与法律法规",{"id":607,"name":608,"category":7,"favorite":15},848,"市政方向-通用基础",{"id":610,"name":611,"category":7,"favorite":8},534,"BIM工程师",{"id":613,"name":611,"category":7,"favorite":8},535]