[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"lib-842-5":3},{"library":4,"page":9,"limit":10,"total":11,"questions":12,"related":612},{"id":5,"name":6,"category":7,"favorite":8},842,"(土建施工)专业管理实务 岗位知识","建筑工程",0,5,50,892,[13,34,46,58,70,82,94,104,116,128,140,152,164,176,188,200,209,221,233,245,257,269,281,293,305,317,329,341,353,365,377,389,401,413,425,437,449,461,473,482,494,506,518,530,540,552,564,576,588,600],{"id":14,"libraryId":5,"type":15,"typeLabel":16,"stem":17,"options":18,"answer":20,"analysis":33},1258507,1,"单选题","建筑物主体结构施工中，监测的主要内容不包括建筑物的（ ）。",[19,23,27,30],{"key":20,"text":21,"correct":22},"A","水平位移",true,{"key":24,"text":25,"correct":26},"B","垂直位移",false,{"key":28,"text":29,"correct":26},"C","倾斜",{"key":31,"text":32,"correct":26},"D","挠度","",{"id":35,"libraryId":5,"type":15,"typeLabel":16,"stem":36,"options":37,"answer":28,"analysis":33},1258508,"适用于高层建筑物、烟囱及高塔架垂直定位测量的常用仪器是（ ）。",[38,40,42,44],{"key":20,"text":39,"correct":26},"经纬仪",{"key":24,"text":41,"correct":26},"吊线坠法",{"key":28,"text":43,"correct":22},"激光铅直仪",{"key":31,"text":45,"correct":26},"自动安平水准仪",{"id":47,"libraryId":5,"type":15,"typeLabel":16,"stem":48,"options":49,"answer":20,"analysis":33},1258509,"砖基础墙体的高度是用（ ）来控制的。",[50,52,54,56],{"key":20,"text":51,"correct":22},"皮数杆",{"key":24,"text":53,"correct":26},"水平尺",{"key":28,"text":55,"correct":26},"全站仪",{"key":31,"text":57,"correct":26},"透明胶皮管",{"id":59,"libraryId":5,"type":15,"typeLabel":16,"stem":60,"options":61,"answer":31,"analysis":33},1258510,"采用建筑基线开展施工平面控制测量主要适用于（ ）。",[62,64,66,68],{"key":20,"text":63,"correct":26},"大型建筑场地",{"key":24,"text":65,"correct":26},"建筑方格网",{"key":28,"text":67,"correct":26},"三角网",{"key":31,"text":69,"correct":22},"总平面布置比较简单的小型场地",{"id":71,"libraryId":5,"type":15,"typeLabel":16,"stem":72,"options":73,"answer":24,"analysis":33},1258511,"某建筑物首层地面相对高程为±0.000m，其绝对高程为46.000m；室外散水相对高程为一0.550m，则该散水绝对高程为（ ）。",[74,76,78,80],{"key":20,"text":75,"correct":26},"一0.550",{"key":24,"text":77,"correct":22},"45.450",{"key":28,"text":79,"correct":26},"46.000",{"key":31,"text":81,"correct":26},"46.550",{"id":83,"libraryId":5,"type":15,"typeLabel":16,"stem":84,"options":85,"answer":28,"analysis":33},1258512,"建筑物的施工测量定位是指（ ）。",[86,88,90,92],{"key":20,"text":87,"correct":26},"进行细部定位",{"key":24,"text":89,"correct":26},"将地面上点的平面位置确定在图纸上",{"key":28,"text":91,"correct":22},"将建筑物外廓的轴线交点测设在地面上",{"key":31,"text":93,"correct":26},"在设计图上找到建筑物的位置",{"id":95,"libraryId":5,"type":15,"typeLabel":16,"stem":96,"options":97,"answer":31,"analysis":33},1258513,"施工高程控制网采用（ ）。",[98,99,101,102],{"key":20,"text":67,"correct":26},{"key":24,"text":100,"correct":26},"导线网",{"key":28,"text":65,"correct":26},{"key":31,"text":103,"correct":22},"水准网",{"id":105,"libraryId":5,"type":15,"typeLabel":16,"stem":106,"options":107,"answer":20,"analysis":33},1258514,"若经纬仪没有安在建筑轴线上，校正预制桩身铅直时，可能使桩身产生倾斜、扭转、（ ）。",[108,110,112,114],{"key":20,"text":109,"correct":22},"既倾斜又扭转",{"key":24,"text":111,"correct":26},"既向前倾斜又向左右倾斜",{"key":28,"text":113,"correct":26},"既扭转又向左右斜",{"key":31,"text":115,"correct":26},"柱身不铅垂",{"id":117,"libraryId":5,"type":15,"typeLabel":16,"stem":118,"options":119,"answer":24,"analysis":33},1258515,"建筑基线应尽可能靠近拟建的主要建筑物，并与其主要轴线（ ）。",[120,122,124,126],{"key":20,"text":121,"correct":26},"垂直",{"key":24,"text":123,"correct":22},"平行",{"key":28,"text":125,"correct":26},"相交",{"key":31,"text":127,"correct":26},"任意",{"id":129,"libraryId":5,"type":15,"typeLabel":16,"stem":130,"options":131,"answer":28,"analysis":33},1258516,"建筑物定位放线时，如果施工场地已有建筑方格网或建筑基线，可直接采用）进行定位。",[132,134,136,138],{"key":20,"text":133,"correct":26},"角度交会法",{"key":24,"text":135,"correct":26},"极坐标法",{"key":28,"text":137,"correct":22},"直角坐标法",{"key":31,"text":139,"correct":26},"距离交会法",{"id":141,"libraryId":5,"type":15,"typeLabel":16,"stem":142,"options":143,"answer":31,"analysis":33},1258517,"水准测量是利用水准仪提供的一条水平视线，借助于带有分划的尺子，测量出两个地面点之间的（ ）。",[144,146,148,150],{"key":20,"text":145,"correct":26},"相对高程",{"key":24,"text":147,"correct":26},"绝对高程",{"key":28,"text":149,"correct":26},"视线高程",{"key":31,"text":151,"correct":22},"高差",{"id":153,"libraryId":5,"type":15,"typeLabel":16,"stem":154,"options":155,"answer":20,"analysis":33},1258518,"水准测量中，在一点安置水准仪可求测出多个点的高程，此时常采用的高程计算方法是（ ）。",[156,158,160,162],{"key":20,"text":157,"correct":22},"视线高差法",{"key":24,"text":159,"correct":26},"高差法",{"key":28,"text":161,"correct":26},"角法",{"key":31,"text":163,"correct":26},"导线法",{"id":165,"libraryId":5,"type":15,"typeLabel":16,"stem":166,"options":167,"answer":24,"analysis":33},1258519,"建筑物沉降观测采取水准测量的方法，周期性地观测建筑物上的沉降观测点和水准基点之间的（ ）。",[168,170,172,174],{"key":20,"text":169,"correct":26},"距离变化值",{"key":24,"text":171,"correct":22},"高差变化值",{"key":28,"text":173,"correct":26},"角度变化值",{"key":31,"text":175,"correct":26},"垂直度变化值",{"id":177,"libraryId":5,"type":15,"typeLabel":16,"stem":178,"options":179,"answer":20,"analysis":33},1258520,"建筑物定位放线时，应在建筑物四角与隔墙两端，基槽开挖边界线以外（ ）m处设置龙门桩。",[180,182,184,186],{"key":20,"text":181,"correct":22},"1.5～2",{"key":24,"text":183,"correct":26},"2～4",{"key":28,"text":185,"correct":26},"6～8",{"key":31,"text":187,"correct":26},"8～10",{"id":189,"libraryId":5,"type":15,"typeLabel":16,"stem":190,"options":191,"answer":28,"analysis":33},1258521,"水平视线在已知高程点上水准尺的读数称为（ ）。",[192,194,196,198],{"key":20,"text":193,"correct":26},"前视读数",{"key":24,"text":195,"correct":26},"水准尺读数",{"key":28,"text":197,"correct":22},"后视读数",{"key":31,"text":199,"correct":26},"中视读数",{"id":201,"libraryId":5,"type":15,"typeLabel":16,"stem":202,"options":203,"answer":31,"analysis":33},1258522,"施工平面控制网的布设，对于地形平坦而通视又比较容易的地区，如扩建或改建工程的工业场地，则采用（ ）。",[204,205,206,208],{"key":20,"text":67,"correct":26},{"key":24,"text":103,"correct":26},{"key":28,"text":207,"correct":26},"建筑基线",{"key":31,"text":100,"correct":22},{"id":210,"libraryId":5,"type":15,"typeLabel":16,"stem":211,"options":212,"answer":28,"analysis":33},1258523,"建筑物沉降观测是用（ ）的方法，周期性地观测建筑物上的沉降观测点和水准点之间的高差变化值。",[213,215,217,219],{"key":20,"text":214,"correct":26},"控制测量",{"key":24,"text":216,"correct":26},"距离测量",{"key":28,"text":218,"correct":22},"水准测量",{"key":31,"text":220,"correct":26},"角度测量",{"id":222,"libraryId":5,"type":15,"typeLabel":16,"stem":223,"options":224,"answer":24,"analysis":33},1258524,"在钢结构工程的柱子安装时，每节柱的定位轴线应从（ ）直接引上。",[225,227,229,231],{"key":20,"text":226,"correct":26},"柱子控制轴线",{"key":24,"text":228,"correct":22},"地面控制轴线",{"key":28,"text":230,"correct":26},"上层柱的轴线",{"key":31,"text":232,"correct":26},"下层柱的轴线",{"id":234,"libraryId":5,"type":15,"typeLabel":16,"stem":235,"options":236,"answer":24,"analysis":33},1258525,"钢结构工程斜梁的安装顺序是：先从（ ）的两榀钢架开始，刚架安装完毕后将其间的檩条、支撑、隅撑等全部装好，并检查其垂直度。然后以这两榀刚架为起点，向建筑物另一端顺序安装。",[237,239,241,243],{"key":20,"text":238,"correct":26},"一端的山墙",{"key":24,"text":240,"correct":22},"靠近山墙的有柱间支撑",{"key":28,"text":242,"correct":26},"中部",{"key":31,"text":244,"correct":26},"中部有柱间支撑力一次施拧",{"id":246,"libraryId":5,"type":15,"typeLabel":16,"stem":247,"options":248,"answer":24,"analysis":33},1258526,"划分施工段的基本原则是各施工段的劳动量（或工程量）要大致相等，相差宜在（ ）以内。",[249,251,253,255],{"key":20,"text":250,"correct":26},"10%",{"key":24,"text":252,"correct":22},"15%",{"key":28,"text":254,"correct":26},"20%",{"key":31,"text":256,"correct":26},"25%",{"id":258,"libraryId":5,"type":15,"typeLabel":16,"stem":259,"options":260,"answer":31,"analysis":33},1258527,"为有效防止框架结构超大体积混凝土基础浇筑时出现有害裂缝，一般不采用的施工方式是（ ）。",[261,263,265,267],{"key":20,"text":262,"correct":26},"留置变形缝",{"key":24,"text":264,"correct":26},"后浇带",{"key":28,"text":266,"correct":26},"采用跳仓法施工",{"key":31,"text":268,"correct":22},"间歇施工",{"id":270,"libraryId":5,"type":15,"typeLabel":16,"stem":271,"options":272,"answer":28,"analysis":33},1258528,"钢结构工程一节柱（三层）的竖向焊接顺序是（ ）",[273,275,277,279],{"key":20,"text":274,"correct":26},"上层梁→中层梁→下层梁→上柱与下柱焊接",{"key":24,"text":276,"correct":26},"上层梁→中层梁→上柱与下柱焊接→下层梁",{"key":28,"text":278,"correct":22},"上层梁→下层梁→中层梁→上柱与下柱焊接",{"key":31,"text":280,"correct":26},"上层梁→上柱与下柱焊接→中层梁→下层梁",{"id":282,"libraryId":5,"type":15,"typeLabel":16,"stem":283,"options":284,"answer":31,"analysis":33},1258529,"确定施工顺序的基本要求不包括（ ）。",[285,287,289,291],{"key":20,"text":286,"correct":26},"必须符合施工工艺的要求",{"key":24,"text":288,"correct":26},"必须与施工方法协调一致",{"key":28,"text":290,"correct":26},"必须考虑当地的气候条件",{"key":31,"text":292,"correct":22},"必须考虑文明施工的要求",{"id":294,"libraryId":5,"type":15,"typeLabel":16,"stem":295,"options":296,"answer":24,"analysis":33},1258530,"砖混结构房屋的层数一般在（ ）层以下。",[297,299,301,303],{"key":20,"text":298,"correct":26},"3",{"key":24,"text":300,"correct":22},"6",{"key":28,"text":302,"correct":26},"10",{"key":31,"text":304,"correct":26},"12",{"id":306,"libraryId":5,"type":15,"typeLabel":16,"stem":307,"options":308,"answer":24,"analysis":33},1258531,"钢结构工程的螺栓紧固时，必须从中心开始施拧，同时还要求（ ）。",[309,311,313,315],{"key":20,"text":310,"correct":26},"不对称施拧",{"key":24,"text":312,"correct":22},"对称施拧",{"key":28,"text":314,"correct":26},"先松后紧施拧",{"key":31,"text":316,"correct":26},"强力一次施拧",{"id":318,"libraryId":5,"type":15,"typeLabel":16,"stem":319,"options":320,"answer":20,"analysis":33},1258532,"框架结构中，板、次梁与主梁交叉处钢筋的排放次序应为（ ）。",[321,323,325,327],{"key":20,"text":322,"correct":22},"板的在上，次梁的居中，主梁的在下",{"key":24,"text":324,"correct":26},"板的在上，主梁的居中，次梁的在下",{"key":28,"text":326,"correct":26},"主梁的在上，次梁的居中，板的在下",{"key":31,"text":328,"correct":26},"主梁的在上，板的居中，次梁的在下",{"id":330,"libraryId":5,"type":15,"typeLabel":16,"stem":331,"options":332,"answer":24,"analysis":33},1258533,"室内装修工程的施工顺序有整体顺序自上而下和整体顺序自下而上两种，其中整体顺序自上而下的施工优点有（ ）。",[333,335,337,339],{"key":20,"text":334,"correct":26},"可以与主体结构平行搭接施工",{"key":24,"text":336,"correct":22},"有利于施工安全",{"key":28,"text":338,"correct":26},"可以缩短工期",{"key":31,"text":340,"correct":26},"工序交叉作业多",{"id":342,"libraryId":5,"type":15,"typeLabel":16,"stem":343,"options":344,"answer":31,"analysis":33},1258534,"大六角高强度螺栓转角法施工分（ ）两步进行。",[345,347,349,351],{"key":20,"text":346,"correct":26},"初拧和复拧",{"key":24,"text":348,"correct":26},"终拧和复拧",{"key":28,"text":350,"correct":26},"试拧和终拧",{"key":31,"text":352,"correct":22},"初拧和终拧",{"id":354,"libraryId":5,"type":15,"typeLabel":16,"stem":355,"options":356,"answer":28,"analysis":33},1258535,"框架结构工程施工要划分施工层和施工段，施工层一般按（ ）划分。",[357,359,361,363],{"key":20,"text":358,"correct":26},"轴线",{"key":24,"text":360,"correct":26},"标高线",{"key":28,"text":362,"correct":22},"结构层",{"key":31,"text":364,"correct":26},"伸缩缝",{"id":366,"libraryId":5,"type":15,"typeLabel":16,"stem":367,"options":368,"answer":20,"analysis":33},1258536,"混凝土搅拌时，一次投料法的装料顺序是（ ）。",[369,371,373,375],{"key":20,"text":370,"correct":22},"石子一水泥一砂一水",{"key":24,"text":372,"correct":26},"水泥一砂一石子一水",{"key":28,"text":374,"correct":26},"砂一水泥一石子一水",{"key":31,"text":376,"correct":26},"水一水泥一石子一砂",{"id":378,"libraryId":5,"type":15,"typeLabel":16,"stem":379,"options":380,"answer":20,"analysis":33},1258537,"采用刷涂法进行钢结构构件防腐涂装时，施涂顺序一般为（ ）。",[381,383,385,387],{"key":20,"text":382,"correct":22},"先上后下，先难后易",{"key":24,"text":384,"correct":26},"先上后下，先易后难",{"key":28,"text":386,"correct":26},"先下后上，先难后易",{"key":31,"text":388,"correct":26},"先下后上，先易后难",{"id":390,"libraryId":5,"type":15,"typeLabel":16,"stem":391,"options":392,"answer":20,"analysis":33},1258538,"关于多层及高层钢结构吊装顺序的说法，正确的是（ ）。",[393,395,397,399],{"key":20,"text":394,"correct":22},"平面从中间或某一对称节间开始，垂直方向由下至上组成稳定结构，同节柱范围内的横向构件，通常由上向下逐层安装",{"key":24,"text":396,"correct":26},"平面从中间或某一对称节间开始，垂直方向由上至下组成稳定结构，同节柱范围内的横向构件，通常由上向下逐层安装",{"key":28,"text":398,"correct":26},"平面从两边节间开始，垂直方向由下至上组成稳定结构，同节柱范围内的横向构件，通常由下向上逐层安装",{"key":31,"text":400,"correct":26},"平面从两边节间开始，垂直方向由下至上组成稳定结构，同节柱范围内的横向构件，通常由上向下逐层安装",{"id":402,"libraryId":5,"type":15,"typeLabel":16,"stem":403,"options":404,"answer":20,"analysis":33},1258539,"单层钢结构厂房施工中，屋盖系统安装通常采用（ ）吊装。",[405,407,409,411],{"key":20,"text":406,"correct":22},"节点综合法",{"key":24,"text":408,"correct":26},"组合作业法",{"key":28,"text":410,"correct":26},"单件流水法",{"key":31,"text":412,"correct":26},"多件流水法",{"id":414,"libraryId":5,"type":15,"typeLabel":16,"stem":415,"options":416,"answer":20,"analysis":33},1258540,"框架结构工程划分施工层、施工段的部位，是决定工程（ ）应考虑的因素。",[417,419,421,423],{"key":20,"text":418,"correct":22},"施工流程",{"key":24,"text":420,"correct":26},"项目班子",{"key":28,"text":422,"correct":26},"项目质量",{"key":31,"text":424,"correct":26},"项目安全",{"id":426,"libraryId":5,"type":15,"typeLabel":16,"stem":427,"options":428,"answer":28,"analysis":33},1258541,"关于钢结构工程防火涂料的施工流程顺利，说法正确的是（ ）。",[429,431,433,435],{"key":20,"text":430,"correct":26},"调配涂料→基面处理→涂装施工→检查验收",{"key":24,"text":432,"correct":26},"涂装施工→基面处理→调配涂料→检查验收",{"key":28,"text":434,"correct":22},"基面处理→调配涂料→涂装施工→检查验收",{"key":31,"text":436,"correct":26},"基面处理→涂装施工→调配涂料→检查验收",{"id":438,"libraryId":5,"type":15,"typeLabel":16,"stem":439,"options":440,"answer":24,"analysis":33},1258542,"划分施工段的基本原则不包括（ ）。",[441,443,445,447],{"key":20,"text":442,"correct":26},"施工段的数目要合理",{"key":24,"text":444,"correct":22},"要有利于结构的局部性",{"key":28,"text":446,"correct":26},"要有足够的工作面",{"key":31,"text":448,"correct":26},"以主导施工过程为依据进行划分",{"id":450,"libraryId":5,"type":15,"typeLabel":16,"stem":451,"options":452,"answer":24,"analysis":33},1258543,"施工区段划分过少的主要缺点是（ ）。",[453,455,457,459],{"key":20,"text":454,"correct":26},"不利于充分发挥机械设备的生产效率",{"key":24,"text":456,"correct":22},"不利于充分利用工作面",{"key":28,"text":458,"correct":26},"容易产生在同一工作面上的互等、停歇的现象",{"key":31,"text":460,"correct":26},"不利于充分发挥劳动力的潜能",{"id":462,"libraryId":5,"type":15,"typeLabel":16,"stem":463,"options":464,"answer":24,"analysis":33},1258544,"关于钢结构工程防腐涂层的施工流程工艺，说法正确的是（ ）。",[465,467,469,471],{"key":20,"text":466,"correct":26},"基面处理→中间漆涂装→底漆涂装→面漆涂装→检查验收",{"key":24,"text":468,"correct":22},"基面处理→底漆涂装→中间漆涂装→面漆涂装→检查验收",{"key":28,"text":470,"correct":26},"底漆涂装→基面处理→中间漆涂装→面漆涂装→检查验收",{"key":31,"text":472,"correct":26},"底漆涂装→中间漆涂装→面漆涂装→基面处理→检查验收",{"id":474,"libraryId":5,"type":15,"typeLabel":16,"stem":475,"options":476,"answer":31,"analysis":33},1258545,"某钢结构工程地上15层，施工时每3层钢柱为一节，每层分两个施工段。该钢结构工程共应分为（ ）个施工区段。",[477,478,480,481],{"key":20,"text":298,"correct":26},{"key":24,"text":479,"correct":26},"5",{"key":28,"text":300,"correct":26},{"key":31,"text":302,"correct":22},{"id":483,"libraryId":5,"type":15,"typeLabel":16,"stem":484,"options":485,"answer":24,"analysis":33},1258546,"以下关于确定施工顺序应遵循的基本原则说法错误的是（ ）。",[486,488,490,492],{"key":20,"text":487,"correct":26},"先地下，后地上",{"key":24,"text":489,"correct":22},"先围护，后主体",{"key":28,"text":491,"correct":26},"先结构，后装修",{"key":31,"text":493,"correct":26},"先土建，后设备",{"id":495,"libraryId":5,"type":15,"typeLabel":16,"stem":496,"options":497,"answer":24,"analysis":33},1258547,"多层混合结构房屋的主要缺点是（ ）。",[498,500,502,504],{"key":20,"text":499,"correct":26},"工程造价低",{"key":24,"text":501,"correct":22},"抗震性能差",{"key":28,"text":503,"correct":26},"刚度大",{"key":31,"text":505,"correct":26},"易就地取材",{"id":507,"libraryId":5,"type":15,"typeLabel":16,"stem":508,"options":509,"answer":28,"analysis":33},1258548,"砖墙砌筑施工工作段的分段位置，不宜在（ ）处。",[510,512,514,516],{"key":20,"text":511,"correct":26},"变形缝",{"key":24,"text":513,"correct":26},"构造柱",{"key":28,"text":515,"correct":22},"墙转角",{"key":31,"text":517,"correct":26},"门窗洞口",{"id":519,"libraryId":5,"type":15,"typeLabel":16,"stem":520,"options":521,"answer":24,"analysis":33},1258549,"下列施工过程中，不能作为框架结构主体工程施工段划分依据的是（ ）。",[522,524,526,528],{"key":20,"text":523,"correct":26},"钢筋绑扎",{"key":24,"text":525,"correct":22},"商品混凝土搅拌",{"key":28,"text":527,"correct":26},"混凝土浇筑",{"key":31,"text":529,"correct":26},"模板安装",{"id":531,"libraryId":5,"type":15,"typeLabel":16,"stem":532,"options":533,"answer":28,"analysis":33},1258550,"室内装修工程的施工顺序有整体顺序自上而下和整体顺序自下而上两种，其中整体顺序自下而上的施工优点有（ ）。",[534,536,537,538],{"key":20,"text":535,"correct":26},"便于组织施工",{"key":24,"text":336,"correct":26},{"key":28,"text":338,"correct":22},{"key":31,"text":539,"correct":26},"减少或避免各工种操作互相交叉",{"id":541,"libraryId":5,"type":15,"typeLabel":16,"stem":542,"options":543,"answer":31,"analysis":33},1258551,"框架结构工程的现浇梁板施工顺序是（ ）。",[544,546,548,550],{"key":20,"text":545,"correct":26},"支梁侧模板并加固→梁钢筋绑扎→铺设梁底模板→铺设顶板模板→铺设顶板钢筋→浇筑梁板混凝土→混凝土养护",{"key":24,"text":547,"correct":26},"铺设梁底模板→支梁侧模板并加固→铺设顶板模板→梁钢筋绑扎→铺设顶板钢筋→浇筑梁板混凝土→混凝土养护",{"key":28,"text":549,"correct":26},"铺设梁底模板→梁钢筋绑扎→支梁侧模板并加固→浇筑梁板混凝土→铺设顶板模板→铺设顶板钢筋→混凝土养护",{"key":31,"text":551,"correct":22},"铺设梁底模板→梁钢筋绑扎→支梁侧模板并加固→铺设顶板模板→铺设顶板钢筋→浇筑梁板混凝土→混凝土养护",{"id":553,"libraryId":5,"type":15,"typeLabel":16,"stem":554,"options":555,"answer":28,"analysis":33},1258552,"检查核对钢结构材料，在材料上划出切割、铣、刨、制孔等加工位置，打冲孔，标出零件编号等的操作是（ ）。",[556,558,560,562],{"key":20,"text":557,"correct":26},"放样",{"key":24,"text":559,"correct":26},"制孔",{"key":28,"text":561,"correct":22},"号料",{"key":31,"text":563,"correct":26},"边缘加工",{"id":565,"libraryId":5,"type":15,"typeLabel":16,"stem":566,"options":567,"answer":20,"analysis":33},1258553,"关于钢结构构件生产工艺流程的说法，正确的是（ ）。",[568,570,572,574],{"key":20,"text":569,"correct":22},"放样、号料、切割下料、平直矫正、边缘及端部加工、滚圆、煨弯、制孔、钢结构组装、焊接、摩擦面的处理、涂装",{"key":24,"text":571,"correct":26},"放样、号料、切割下料、边缘及端部加工、平直矫正、滚圆、煨弯、制孔、钢结构组装、焊接、摩擦面的处理、涂装",{"key":28,"text":573,"correct":26},"放样、号料、切割下料、平直矫正、边缘及端部加工、滚圆、煨弯、钢结构组装、制孔、焊接、摩擦面的处理、涂装",{"key":31,"text":575,"correct":26},"放样、号料、切割下料、平直矫正、边缘及端部加工、制孔、滚圆、煨弯、钢结构组装、焊接、摩擦面的处理、涂装",{"id":577,"libraryId":5,"type":15,"typeLabel":16,"stem":578,"options":579,"answer":24,"analysis":33},1258554,"建筑结构施工区段的划分，属于（ ）的内容。",[580,582,584,586],{"key":20,"text":581,"correct":26},"施工技术方案",{"key":24,"text":583,"correct":22},"施工组织设计",{"key":28,"text":585,"correct":26},"施工控制方案",{"key":31,"text":587,"correct":26},"质量管理方案",{"id":589,"libraryId":5,"type":15,"typeLabel":16,"stem":590,"options":591,"answer":24,"analysis":33},1258555,"关于后张法预应力（无粘结）钢筋张拉的说法，正确的是（ ）。",[592,594,596,598],{"key":20,"text":593,"correct":26},"预应力混凝土楼盖中的张拉顺序是先张拉楼面梁、后张拉楼板",{"key":24,"text":595,"correct":22},"板中的无粘结预应力可依次张拉，梁中的无粘结筋可对称张拉",{"key":28,"text":597,"correct":26},"当曲面无粘结预应力筋长度超过20m时，宜采用两端张拉",{"key":31,"text":599,"correct":26},"当长度超过30m时",{"id":601,"libraryId":5,"type":15,"typeLabel":16,"stem":602,"options":603,"answer":24,"analysis":33},1258556,"下列选项中，不属于单位工程施工进度计划编制依据的是（ ）。",[604,606,608,610],{"key":20,"text":605,"correct":26},"施工图纸及设计单位对施工的要求",{"key":24,"text":607,"correct":22},"工程项目所在地区的生活水平",{"key":28,"text":609,"correct":26},"资源配置情况",{"key":31,"text":611,"correct":26},"施工现场条件和勘察资料",[613,616,619,622,625,628],{"id":15,"name":614,"category":7,"favorite":615},"领导干部任职前廉政法规知识测试题",92,{"id":617,"name":618,"category":7,"favorite":15},595,"建筑结构与设备",{"id":620,"name":621,"category":7,"favorite":15},715,"招标采购专业知识与法律法规",{"id":623,"name":624,"category":7,"favorite":15},848,"市政方向-通用基础",{"id":626,"name":627,"category":7,"favorite":8},534,"BIM工程师",{"id":629,"name":627,"category":7,"favorite":8},535]