[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"lib-842-17":3},{"library":4,"page":9,"limit":10,"total":11,"questions":12,"related":322},{"id":5,"name":6,"category":7,"favorite":8},842,"(土建施工)专业管理实务 岗位知识","建筑工程",0,17,50,892,[13,28,34,40,46,52,58,64,70,76,82,88,94,100,106,112,118,124,130,136,142,148,154,160,166,172,178,184,190,196,202,208,214,220,226,232,238,244,250,256,262,268,274,280,286,292,298,304,310,316],{"id":14,"libraryId":5,"type":15,"typeLabel":16,"stem":17,"options":18,"answer":21,"analysis":27},1259109,3,"判断题","工程项目资源是对项目中使用的人力资源、材料、机械设备、技术、资金和基础设施等的总称。",[19,23],{"key":20,"text":21,"correct":22},"A","正确",true,{"key":24,"text":25,"correct":26},"B","错误",false,"",{"id":29,"libraryId":5,"type":15,"typeLabel":16,"stem":30,"options":31,"answer":21,"analysis":27},1259110,"流水节拍是指一个作业队在一个施工段上完成全部工作的时间。",[32,33],{"key":20,"text":21,"correct":22},{"key":24,"text":25,"correct":26},{"id":35,"libraryId":5,"type":15,"typeLabel":16,"stem":36,"options":37,"answer":21,"analysis":27},1259111,"施工进度计划调整时，可采用增减工作范围的方法，增减内容做到不打乱原计划的逻辑关系，只对局部逻辑关系进行调整。（ ）",[38,39],{"key":20,"text":21,"correct":22},{"key":24,"text":25,"correct":26},{"id":41,"libraryId":5,"type":15,"typeLabel":16,"stem":42,"options":43,"answer":21,"analysis":27},1259112,"施工进度计划的编制方法主要有横道图进度计划的编制方法和网络计划编制方法。",[44,45],{"key":20,"text":21,"correct":22},{"key":24,"text":25,"correct":26},{"id":47,"libraryId":5,"type":15,"typeLabel":16,"stem":48,"options":49,"answer":21,"analysis":27},1259113,"对于混合结构多层房屋的流水施工，一般先考虑分部工程的流水，然后再考虑各分部工程之间的相互搭接施工，组成单位工程施工进度计划。",[50,51],{"key":20,"text":21,"correct":22},{"key":24,"text":25,"correct":26},{"id":53,"libraryId":5,"type":15,"typeLabel":16,"stem":54,"options":55,"answer":21,"analysis":27},1259114,"按最早时间绘制的时标网络计划，波形线的水平投影长度即为该工作的自由时差。",[56,57],{"key":20,"text":21,"correct":22},{"key":24,"text":25,"correct":26},{"id":59,"libraryId":5,"type":15,"typeLabel":16,"stem":60,"options":61,"answer":25,"analysis":27},1259115,"均衡施工可以使各种资源的动态曲线尽可能不出现长时期高峰或低谷，因而可大大减少施工现场各种临时设施的规模，从而节省施工费用。",[62,63],{"key":20,"text":21,"correct":26},{"key":24,"text":25,"correct":22},{"id":65,"libraryId":5,"type":15,"typeLabel":16,"stem":66,"options":67,"answer":21,"analysis":27},1259116,"考虑到屋面防水要求高，所以不分段，采用依次施工的方式，其中屋面找平层完成后需有一段养护和干燥的时间，方可进行防水层施工。",[68,69],{"key":20,"text":21,"correct":22},{"key":24,"text":25,"correct":26},{"id":71,"libraryId":5,"type":15,"typeLabel":16,"stem":72,"options":73,"answer":25,"analysis":27},1259117,"若工作的进度偏差大于自由时差，说明该工作对后续工作有影响，原计划必须全部调整。（ ）",[74,75],{"key":20,"text":21,"correct":26},{"key":24,"text":25,"correct":22},{"id":77,"libraryId":5,"type":15,"typeLabel":16,"stem":78,"options":79,"answer":21,"analysis":27},1259118,"使用国有资金投资的建设工程发承包，必须采用工程量清单计价。（ ）",[80,81],{"key":20,"text":21,"correct":22},{"key":24,"text":25,"correct":26},{"id":83,"libraryId":5,"type":15,"typeLabel":16,"stem":84,"options":85,"answer":25,"analysis":27},1259119,"工程实施过程中的现场签证确认的费用可以在清单的暂估价中列支。（ ）",[86,87],{"key":20,"text":21,"correct":26},{"key":24,"text":25,"correct":22},{"id":89,"libraryId":5,"type":15,"typeLabel":16,"stem":90,"options":91,"answer":21,"analysis":27},1259120,"发包人收到承包人提交的最终结清申请单后的14天内予以核实，向承包人签发最终支付证书。发包人未在约定时间内核实，又未提出具体意见的，视为承包人提交的最终结清申请单已被发包人认可。（ ）",[92,93],{"key":20,"text":21,"correct":22},{"key":24,"text":25,"correct":26},{"id":95,"libraryId":5,"type":15,"typeLabel":16,"stem":96,"options":97,"answer":21,"analysis":27},1259121,"在本工程中，当调价系数采用0.9时，代表工程量超过计划工程量的15％后执行的系数。（ ）",[98,99],{"key":20,"text":21,"correct":22},{"key":24,"text":25,"correct":26},{"id":101,"libraryId":5,"type":15,"typeLabel":16,"stem":102,"options":103,"answer":21,"analysis":27},1259122,"在工程实施过程中，当项目特征发生了变化，发承包双方应当按照实际施工的项目特征，重新确定相应工程量清单项目的综合单价，调整合同价款。（ ）",[104,105],{"key":20,"text":21,"correct":22},{"key":24,"text":25,"correct":26},{"id":107,"libraryId":5,"type":15,"typeLabel":16,"stem":108,"options":109,"answer":25,"analysis":27},1259123,"已竣工未验收但实际投人使用的工程，其质量争议按照该工程正常施工中解决争议的条款执行。（ ）",[110,111],{"key":20,"text":21,"correct":26},{"key":24,"text":25,"correct":22},{"id":113,"libraryId":5,"type":15,"typeLabel":16,"stem":114,"options":115,"answer":21,"analysis":27},1259124,"因发生不可抗力事件导致工期延误的，工期相应顺延。（ ）",[116,117],{"key":20,"text":21,"correct":22},{"key":24,"text":25,"correct":26},{"id":119,"libraryId":5,"type":15,"typeLabel":16,"stem":120,"options":121,"answer":25,"analysis":27},1259125,"由于承包商原因导致的工期延误，引起造价变化的，不管增减均不予调整。（ ）",[122,123],{"key":20,"text":21,"correct":26},{"key":24,"text":25,"correct":22},{"id":125,"libraryId":5,"type":15,"typeLabel":16,"stem":126,"options":127,"answer":21,"analysis":27},1259126,"措施项目中不能计算工程量的项目清单，可用“项”或“宗”作为计量单位进行编制。（ ）",[128,129],{"key":20,"text":21,"correct":22},{"key":24,"text":25,"correct":26},{"id":131,"libraryId":5,"type":15,"typeLabel":16,"stem":132,"options":133,"answer":25,"analysis":27},1259127,"当不可抗力事件发生后，造成合同工程本身的损害、因工程损害导致第三方人员伤亡和财产损失，以及运至施工场地用于施工的材料和待安装的设备的损害，由承包人承担。（ ）",[134,135],{"key":20,"text":21,"correct":26},{"key":24,"text":25,"correct":22},{"id":137,"libraryId":5,"type":15,"typeLabel":16,"stem":138,"options":139,"answer":25,"analysis":27},1259128,"已竣工未验收且未实际投人使用的工程的质量争议，双方应就有争议的部分按工程质量监督机构的处理决定执行后办理竣工结算，无争议的竣工结算也应该等争议部分解决后一起办理。（ ）",[140,141],{"key":20,"text":21,"correct":26},{"key":24,"text":25,"correct":22},{"id":143,"libraryId":5,"type":15,"typeLabel":16,"stem":144,"options":145,"answer":25,"analysis":27},1259129,"工程款的最终结清是指建筑工程在工程质量保修期结束后，发包人与承包人结清全部剩余款项的活动。（ ）",[146,147],{"key":20,"text":21,"correct":26},{"key":24,"text":25,"correct":22},{"id":149,"libraryId":5,"type":15,"typeLabel":16,"stem":150,"options":151,"answer":21,"analysis":27},1259130,"工程变更可以理解为合同工程实施过程中由发包人提出或由承包人提出经发包人批准的合同工程的任何改变。（ ）",[152,153],{"key":20,"text":21,"correct":22},{"key":24,"text":25,"correct":26},{"id":155,"libraryId":5,"type":15,"typeLabel":16,"stem":156,"options":157,"answer":25,"analysis":27},1259131,"采用工程量清单方式招标，招标工程量清单必须作为招标文件的组成部分，其准确性和完整性由招标代理人负责。（ ）",[158,159],{"key":20,"text":21,"correct":26},{"key":24,"text":25,"correct":22},{"id":161,"libraryId":5,"type":15,"typeLabel":16,"stem":162,"options":163,"answer":25,"analysis":27},1259132,"专项性文件是指就某项产品的特殊要求编制的专项文件，它是作为对通用性文件中一般规定的补充，属于这类文件的有质量方针政策、质量手册、程序文件和记录。",[164,165],{"key":20,"text":21,"correct":26},{"key":24,"text":25,"correct":22},{"id":167,"libraryId":5,"type":15,"typeLabel":16,"stem":168,"options":169,"answer":25,"analysis":27},1259133,"通用性文件是指就某项产品的特殊要求编制的文件。",[170,171],{"key":20,"text":21,"correct":26},{"key":24,"text":25,"correct":22},{"id":173,"libraryId":5,"type":15,"typeLabel":16,"stem":174,"options":175,"answer":21,"analysis":27},1259134,"质量控制文件主要用以表述保证和提高项目质量的文件，包括与项目质量有关的设计文件、工艺文件、研究试验文件等。",[176,177],{"key":20,"text":21,"correct":22},{"key":24,"text":25,"correct":26},{"id":179,"libraryId":5,"type":15,"typeLabel":16,"stem":180,"options":181,"answer":25,"analysis":27},1259135,"施工技术交底是对施工质量达到的质量标准和使用功能等要求加以说明。",[182,183],{"key":20,"text":21,"correct":26},{"key":24,"text":25,"correct":22},{"id":185,"libraryId":5,"type":15,"typeLabel":16,"stem":186,"options":187,"answer":21,"analysis":27},1259136,"施工质量控制点是指为了保证作业过程质量而确定的重点控制对象、关键部位或薄弱环节。",[188,189],{"key":20,"text":21,"correct":22},{"key":24,"text":25,"correct":26},{"id":191,"libraryId":5,"type":15,"typeLabel":16,"stem":192,"options":193,"answer":25,"analysis":27},1259137,"相邻两立柱的对接接头不得在同步内，沿竖向错开的距离不宜小于400mm。（ ）",[194,195],{"key":20,"text":21,"correct":26},{"key":24,"text":25,"correct":22},{"id":197,"libraryId":5,"type":15,"typeLabel":16,"stem":198,"options":199,"answer":21,"analysis":27},1259138,"高处作业时，梯子如需接长使用，必须有可靠的连接措施，且接头不得超过2处。（ ）",[200,201],{"key":20,"text":21,"correct":22},{"key":24,"text":25,"correct":26},{"id":203,"libraryId":5,"type":15,"typeLabel":16,"stem":204,"options":205,"answer":25,"analysis":27},1259139,"施工升降机安装作业前，安装技术人员应根据专项施工方案和使用说明书的要求，对安全管理人员和安装作业人员进行安全技术交底，并由安全管理人员在交底书上签字。（ ）",[206,207],{"key":20,"text":21,"correct":26},{"key":24,"text":25,"correct":22},{"id":209,"libraryId":5,"type":15,"typeLabel":16,"stem":210,"options":211,"answer":25,"analysis":27},1259140,"当设计无要求时，后张法预应力混凝土结构底模拆除应在预应力钢筋张拉前。（ ）",[212,213],{"key":20,"text":21,"correct":26},{"key":24,"text":25,"correct":22},{"id":215,"libraryId":5,"type":15,"typeLabel":16,"stem":216,"options":217,"answer":21,"analysis":27},1259141,"框架结构建筑的楼层周边设置防护栏杆和挡脚板时，可以不用安全立网封闭。（ ）",[218,219],{"key":20,"text":21,"correct":22},{"key":24,"text":25,"correct":26},{"id":221,"libraryId":5,"type":15,"typeLabel":16,"stem":222,"options":223,"answer":25,"analysis":27},1259142,"物的不安全状态属于第一类危险源。（ ）",[224,225],{"key":20,"text":21,"correct":26},{"key":24,"text":25,"correct":22},{"id":227,"libraryId":5,"type":15,"typeLabel":16,"stem":228,"options":229,"answer":21,"analysis":27},1259143,"宽度小于1m的窗间墙，应选用整砖砌筑，半砖和破损的砖应分散使用于墙心或受力较小部位。（ ）",[230,231],{"key":20,"text":21,"correct":22},{"key":24,"text":25,"correct":26},{"id":233,"libraryId":5,"type":15,"typeLabel":16,"stem":234,"options":235,"answer":25,"analysis":27},1259144,"地基施工结束后，就可立即进行有关检测和质量验收。（ ）",[236,237],{"key":20,"text":21,"correct":26},{"key":24,"text":25,"correct":22},{"id":239,"libraryId":5,"type":15,"typeLabel":16,"stem":240,"options":241,"answer":21,"analysis":27},1259145,"施工现场环境噪声污染防治主要解决建设工程施工过程中产生的施工噪声污染问题。（ ）",[242,243],{"key":20,"text":21,"correct":22},{"key":24,"text":25,"correct":26},{"id":245,"libraryId":5,"type":15,"typeLabel":16,"stem":246,"options":247,"answer":21,"analysis":27},1259146,"管理上的不安全因素主要指人、物、工作的管理不当。（ ）",[248,249],{"key":20,"text":21,"correct":22},{"key":24,"text":25,"correct":26},{"id":251,"libraryId":5,"type":15,"typeLabel":16,"stem":252,"options":253,"answer":21,"analysis":27},1259147,"根据《建设工程质量管理条例》规定，施工单位未对涉及结构安全的试块、试件及有关材料取样检测，情节严重的，应当受到的行政处罚包括降低资质等级或吊销资质证书。（ ）",[254,255],{"key":20,"text":21,"correct":22},{"key":24,"text":25,"correct":26},{"id":257,"libraryId":5,"type":15,"typeLabel":16,"stem":258,"options":259,"answer":25,"analysis":27},1259148,"记录施工情况包括：记录单位工程名称、开工时间、完成时间、施工工艺、完成情况、未完成情况、未完成原因及其他情况等。",[260,261],{"key":20,"text":21,"correct":26},{"key":24,"text":25,"correct":22},{"id":263,"libraryId":5,"type":15,"typeLabel":16,"stem":264,"options":265,"answer":21,"analysis":27},1259149,"各种脚手架搭设前应进行安全技术交底，并应有文字记录。（ ）",[266,267],{"key":20,"text":21,"correct":22},{"key":24,"text":25,"correct":26},{"id":269,"libraryId":5,"type":15,"typeLabel":16,"stem":270,"options":271,"answer":25,"analysis":27},1259150,"施工图审查报告应该在图纸会审结束后由与会各单位共同签发。（ ）",[272,273],{"key":20,"text":21,"correct":26},{"key":24,"text":25,"correct":22},{"id":275,"libraryId":5,"type":15,"typeLabel":16,"stem":276,"options":277,"answer":25,"analysis":27},1259151,"高强度螺栓孔在征得设计同意的基础上，可以采用气割扩孔，扩孔后的孔径不应超过1.2d（d为螺栓直径）。（ ）",[278,279],{"key":20,"text":21,"correct":26},{"key":24,"text":25,"correct":22},{"id":281,"libraryId":5,"type":15,"typeLabel":16,"stem":282,"options":283,"answer":25,"analysis":27},1259152,"施工现场质量检查记录表填写完成后，将有关文件的原件和复印件附在后面，报专业监理工程师审查。（ ）",[284,285],{"key":20,"text":21,"correct":26},{"key":24,"text":25,"correct":22},{"id":287,"libraryId":5,"type":15,"typeLabel":16,"stem":288,"options":289,"answer":21,"analysis":27},1259153,"在土方开挖工程检验批质量验收记录中，检查某工程的柱基基坑基槽的表面平整度，规范允许值为20mm，现场检查了12个点，其中有2个点超过了此值，分别为25、26，可以判定为合格。（ ）",[290,291],{"key":20,"text":21,"correct":22},{"key":24,"text":25,"correct":26},{"id":293,"libraryId":5,"type":15,"typeLabel":16,"stem":294,"options":295,"answer":25,"analysis":27},1259154,"一般基坑（槽）的土方开挖应遵循“开槽支撑，先撑先挖，分层开挖，严禁超挖”的原则。",[296,297],{"key":20,"text":21,"correct":26},{"key":24,"text":25,"correct":22},{"id":299,"libraryId":5,"type":15,"typeLabel":16,"stem":300,"options":301,"answer":25,"analysis":27},1259155,"刚性防水屋面的坡度宜为1%～3%，并应采用结构找坡。",[302,303],{"key":20,"text":21,"correct":26},{"key":24,"text":25,"correct":22},{"id":305,"libraryId":5,"type":15,"typeLabel":16,"stem":306,"options":307,"answer":25,"analysis":27},1259156,"资源配置计划的主要内容包括：劳动力配置计划和资金配置计划。",[308,309],{"key":20,"text":21,"correct":26},{"key":24,"text":25,"correct":22},{"id":311,"libraryId":5,"type":15,"typeLabel":16,"stem":312,"options":313,"answer":21,"analysis":27},1259157,"模板系统包括：模板、支架和紧固件三部分。",[314,315],{"key":20,"text":21,"correct":22},{"key":24,"text":25,"correct":26},{"id":317,"libraryId":5,"type":15,"typeLabel":16,"stem":318,"options":319,"answer":21,"analysis":27},1259158,"当墙体节能工程的保温层采用预埋或后置锚固件固定时，后置锚固件应进行锚固力现场拉拔试验。（ ）",[320,321],{"key":20,"text":21,"correct":22},{"key":24,"text":25,"correct":26},[323,327,330,333,336,339],{"id":324,"name":325,"category":7,"favorite":326},1,"领导干部任职前廉政法规知识测试题",92,{"id":328,"name":329,"category":7,"favorite":324},595,"建筑结构与设备",{"id":331,"name":332,"category":7,"favorite":324},715,"招标采购专业知识与法律法规",{"id":334,"name":335,"category":7,"favorite":324},848,"市政方向-通用基础",{"id":337,"name":338,"category":7,"favorite":8},534,"BIM工程师",{"id":340,"name":338,"category":7,"favorite":8},535]