[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"lib-842-16":3},{"library":4,"page":9,"limit":10,"total":11,"questions":12,"related":322},{"id":5,"name":6,"category":7,"favorite":8},842,"(土建施工)专业管理实务 岗位知识","建筑工程",0,16,50,892,[13,28,34,40,46,52,58,64,70,76,82,88,94,100,106,112,118,124,130,136,142,148,154,160,166,172,178,184,190,196,202,208,214,220,226,232,238,244,250,256,262,268,274,280,286,292,298,304,310,316],{"id":14,"libraryId":5,"type":15,"typeLabel":16,"stem":17,"options":18,"answer":21,"analysis":27},1259059,3,"判断题","对于混凝土阶梯形基础，每一台阶高度内应整层作为一个浇筑层阶应稍停0.5～1h，使其初步获得沉实，再浇筑上层。（ ）",[19,23],{"key":20,"text":21,"correct":22},"A","正确",true,{"key":24,"text":25,"correct":26},"B","错误",false,"",{"id":29,"libraryId":5,"type":15,"typeLabel":16,"stem":30,"options":31,"answer":25,"analysis":27},1259060,"当筏板基础长度超过40m时，为防止出现温度收缩裂缝，一般应设置贯通后浇带，缝宽不宜小于800mm，在后浇带处钢筋应断开。（ ）",[32,33],{"key":20,"text":21,"correct":26},{"key":24,"text":25,"correct":22},{"id":35,"libraryId":5,"type":15,"typeLabel":16,"stem":36,"options":37,"answer":25,"analysis":27},1259061,"砖在砌筑前应提前1～2h浇水湿润。",[38,39],{"key":20,"text":21,"correct":26},{"key":24,"text":25,"correct":22},{"id":41,"libraryId":5,"type":15,"typeLabel":16,"stem":42,"options":43,"answer":21,"analysis":27},1259062,"砖基础不在同一底标高时，砌筑从低处砌起，并应由高处向低处搭砌。（ ）",[44,45],{"key":20,"text":21,"correct":22},{"key":24,"text":25,"correct":26},{"id":47,"libraryId":5,"type":15,"typeLabel":16,"stem":48,"options":49,"answer":21,"analysis":27},1259063,"砖基础的下部为大放脚，上部为基础墙。（ ）",[50,51],{"key":20,"text":21,"correct":22},{"key":24,"text":25,"correct":26},{"id":53,"libraryId":5,"type":15,"typeLabel":16,"stem":54,"options":55,"answer":25,"analysis":27},1259064,"水泥砂浆防水层是一种柔性防水层。（ ）",[56,57],{"key":20,"text":21,"correct":26},{"key":24,"text":25,"correct":22},{"id":59,"libraryId":5,"type":15,"typeLabel":16,"stem":60,"options":61,"answer":21,"analysis":27},1259065,"大体积混凝土基础的浇筑方法宜先浇筑深坑部分再浇筑大面积基础部分。（ ）",[62,63],{"key":20,"text":21,"correct":22},{"key":24,"text":25,"correct":26},{"id":65,"libraryId":5,"type":15,"typeLabel":16,"stem":66,"options":67,"answer":25,"analysis":27},1259066,"砖基础的转角处和交接处应同时砌筑，不能同时砌筑时，应留直槎。（ ）",[68,69],{"key":20,"text":21,"correct":26},{"key":24,"text":25,"correct":22},{"id":71,"libraryId":5,"type":15,"typeLabel":16,"stem":72,"options":73,"answer":21,"analysis":27},1259067,"在进行模板及其支架系统的设计计算时，应考虑模板及支架自重、浇筑混凝土的重量、钢筋的重量、施工人员及设备重量、振捣混凝土时产生的荷载、新浇混凝土对模板的侧压力、倾倒混凝土时对垂直面模板产生的水平荷载、风荷载等因素的影响。（ ）",[74,75],{"key":20,"text":21,"correct":22},{"key":24,"text":25,"correct":26},{"id":77,"libraryId":5,"type":15,"typeLabel":16,"stem":78,"options":79,"answer":21,"analysis":27},1259068,"进行沉降观测的工作基点一般设置在稳定的永久性建筑物墙体或基础上。（ ）",[80,81],{"key":20,"text":21,"correct":22},{"key":24,"text":25,"correct":26},{"id":83,"libraryId":5,"type":15,"typeLabel":16,"stem":84,"options":85,"answer":25,"analysis":27},1259069,"高层建筑物轴线主要利用皮数杆传递高程和内控法进行竖向投测。（ ）",[86,87],{"key":20,"text":21,"correct":26},{"key":24,"text":25,"correct":22},{"id":89,"libraryId":5,"type":15,"typeLabel":16,"stem":90,"options":91,"answer":21,"analysis":27},1259070,"吊线坠法是利用钢丝悬挂重锤球的方法，进行轴线竖向投测。（ ）",[92,93],{"key":20,"text":21,"correct":22},{"key":24,"text":25,"correct":26},{"id":95,"libraryId":5,"type":15,"typeLabel":16,"stem":96,"options":97,"answer":21,"analysis":27},1259071,"定位放线是建筑工程施工的依据。",[98,99],{"key":20,"text":21,"correct":22},{"key":24,"text":25,"correct":26},{"id":101,"libraryId":5,"type":15,"typeLabel":16,"stem":102,"options":103,"answer":25,"analysis":27},1259072,"建筑物的高层传递可以采用吊钢尺法、利用皮数杆传递高程、利用软皮尺直接丈量等方法。（ ）",[104,105],{"key":20,"text":21,"correct":26},{"key":24,"text":25,"correct":22},{"id":107,"libraryId":5,"type":15,"typeLabel":16,"stem":108,"options":109,"answer":21,"analysis":27},1259073,"建筑工程的定位分为平面位置定位和标高定位。",[110,111],{"key":20,"text":21,"correct":22},{"key":24,"text":25,"correct":26},{"id":113,"libraryId":5,"type":15,"typeLabel":16,"stem":114,"options":115,"answer":25,"analysis":27},1259074,"在多层或高层建筑施工中，为控制施工层竖向轴线，可以以下一层轴线为准，依次逐层向上投测。（ ）",[116,117],{"key":20,"text":21,"correct":26},{"key":24,"text":25,"correct":22},{"id":119,"libraryId":5,"type":15,"typeLabel":16,"stem":120,"options":121,"answer":21,"analysis":27},1259075,"土方边坡用边坡坡度或坡系数表示，两者互为倒数，工程中常以h:b表示坡度。（ ）",[122,123],{"key":20,"text":21,"correct":22},{"key":24,"text":25,"correct":26},{"id":125,"libraryId":5,"type":15,"typeLabel":16,"stem":126,"options":127,"answer":21,"analysis":27},1259076,"建筑基线应尽可能靠近拟建的主要建筑物，并与其主要轴线平行，以便使用比较简单的直角坐标法进行建筑物的定位。（ ）",[128,129],{"key":20,"text":21,"correct":22},{"key":24,"text":25,"correct":26},{"id":131,"libraryId":5,"type":15,"typeLabel":16,"stem":132,"options":133,"answer":21,"analysis":27},1259077,"在日照下校正柱子的垂直度时，应考虑日照使柱顶向阴面弯曲的影响，为避免此种影响，宜在早晨或阴天校正。（ ）",[134,135],{"key":20,"text":21,"correct":22},{"key":24,"text":25,"correct":26},{"id":137,"libraryId":5,"type":15,"typeLabel":16,"stem":138,"options":139,"answer":21,"analysis":27},1259078,"用测量仪器来测定建筑物的基础和主体结构倾斜变化的工作，称为倾斜观测。（ ）",[140,141],{"key":20,"text":21,"correct":22},{"key":24,"text":25,"correct":26},{"id":143,"libraryId":5,"type":15,"typeLabel":16,"stem":144,"options":145,"answer":25,"analysis":27},1259079,"对于地势平坦，通视又比较困难的施工场地，其施工平面控制网可采用三角网。（ ）",[146,147],{"key":20,"text":21,"correct":26},{"key":24,"text":25,"correct":22},{"id":149,"libraryId":5,"type":15,"typeLabel":16,"stem":150,"options":151,"answer":25,"analysis":27},1259080,"一般把平面上划分的若干个劳动量大致相等的施工区段称为施工层。",[152,153],{"key":20,"text":21,"correct":26},{"key":24,"text":25,"correct":22},{"id":155,"libraryId":5,"type":15,"typeLabel":16,"stem":156,"options":157,"answer":21,"analysis":27},1259081,"施工流水段划分是钢结构工程安装前准备工作之一。（ ）",[158,159],{"key":20,"text":21,"correct":22},{"key":24,"text":25,"correct":26},{"id":161,"libraryId":5,"type":15,"typeLabel":16,"stem":162,"options":163,"answer":25,"analysis":27},1259082,"室内装修工程的施工顺序有整体顺序自上而下和整体顺序自下而上两种，其中整体顺序自下而上的施工顺序是指主体结构施工到两层以上时，室内抹灰从底层开始逐层向上进行，一般与主体结构平行搭接施工。",[164,165],{"key":20,"text":21,"correct":26},{"key":24,"text":25,"correct":22},{"id":167,"libraryId":5,"type":15,"typeLabel":16,"stem":168,"options":169,"answer":25,"analysis":27},1259083,"钢结构工程一节柱的各层梁安装好后，应先焊上层梁，再焊中层梁，最后焊下层梁。（ ）",[170,171],{"key":20,"text":21,"correct":26},{"key":24,"text":25,"correct":22},{"id":173,"libraryId":5,"type":15,"typeLabel":16,"stem":174,"options":175,"answer":21,"analysis":27},1259084,"回填土一般在基础工程完工后一次性分层、对称夯填，以避免基础浸泡和为后道工序创造条件。（ ）",[176,177],{"key":20,"text":21,"correct":22},{"key":24,"text":25,"correct":26},{"id":179,"libraryId":5,"type":15,"typeLabel":16,"stem":180,"options":181,"answer":25,"analysis":27},1259085,"高层框架结构建筑的基础大多为深基础，深基础必须采用自下而上的施工顺序。（ ）",[182,183],{"key":20,"text":21,"correct":26},{"key":24,"text":25,"correct":22},{"id":185,"libraryId":5,"type":15,"typeLabel":16,"stem":186,"options":187,"answer":25,"analysis":27},1259086,"相邻基坑开挖时，应遵循先浅后深或同时进行的施工程序。（ ）",[188,189],{"key":20,"text":21,"correct":26},{"key":24,"text":25,"correct":22},{"id":191,"libraryId":5,"type":15,"typeLabel":16,"stem":192,"options":193,"answer":21,"analysis":27},1259087,"基础工程施工阶段的施工顺序一般是：挖土方→垫层→基础→回填土。具体内容视工程设计而定。",[194,195],{"key":20,"text":21,"correct":22},{"key":24,"text":25,"correct":26},{"id":197,"libraryId":5,"type":15,"typeLabel":16,"stem":198,"options":199,"answer":25,"analysis":27},1259088,"对已浇筑完毕的混凝土，应在混凝土终凝前（通常为混凝土浇筑完毕后12～24h内），开始进行自然养护。（ ）",[200,201],{"key":20,"text":21,"correct":26},{"key":24,"text":25,"correct":22},{"id":203,"libraryId":5,"type":15,"typeLabel":16,"stem":204,"options":205,"answer":21,"analysis":27},1259089,"每节钢柱的定位轴线应从地面控制轴线直接引上。（ ）",[206,207],{"key":20,"text":21,"correct":22},{"key":24,"text":25,"correct":26},{"id":209,"libraryId":5,"type":15,"typeLabel":16,"stem":210,"options":211,"answer":21,"analysis":27},1259090,"屋面工程施工在一般情况下不划分流水段，它可以和装修工程搭接施工。",[212,213],{"key":20,"text":21,"correct":22},{"key":24,"text":25,"correct":26},{"id":215,"libraryId":5,"type":15,"typeLabel":16,"stem":216,"options":217,"answer":25,"analysis":27},1259091,"室内装修工程的施工顺序有整体顺序自上而下和整体顺序自下而上两种，其中整体顺序自下而上的施工顺序是指主体工程及屋面防水层完工后，室内抹灰从顶层往底层依次逐层向下进行。",[218,219],{"key":20,"text":21,"correct":26},{"key":24,"text":25,"correct":22},{"id":221,"libraryId":5,"type":15,"typeLabel":16,"stem":222,"options":223,"answer":21,"analysis":27},1259092,"在浇筑与柱和墙连成整体的梁和板时，应在柱和墙浇筑完毕后停歇1、1～5h，再继续浇筑。（ ）",[224,225],{"key":20,"text":21,"correct":22},{"key":24,"text":25,"correct":26},{"id":227,"libraryId":5,"type":15,"typeLabel":16,"stem":228,"options":229,"answer":25,"analysis":27},1259093,"室外装修工程一般采用自下而上的施工顺序。",[230,231],{"key":20,"text":21,"correct":26},{"key":24,"text":25,"correct":22},{"id":233,"libraryId":5,"type":15,"typeLabel":16,"stem":234,"options":235,"answer":21,"analysis":27},1259094,"在实际工程施工中，施工顺序可以有多种。不仅不同类型建筑物的建造过程有着不同的施工顺序，在同一类型的建筑工程施工中，甚至同一栋房屋的施工，也会有不同的施工顺序。",[236,237],{"key":20,"text":21,"correct":22},{"key":24,"text":25,"correct":26},{"id":239,"libraryId":5,"type":15,"typeLabel":16,"stem":240,"options":241,"answer":25,"analysis":27},1259095,"泵送混凝土搅拌时，应按规定顺序进行投料，并且粉煤灰、外加剂宜滞后于水和水泥。（ ）",[242,243],{"key":20,"text":21,"correct":26},{"key":24,"text":25,"correct":22},{"id":245,"libraryId":5,"type":15,"typeLabel":16,"stem":246,"options":247,"answer":25,"analysis":27},1259096,"施工顺序是指工程开工后各单位工程施工的先后顺序。",[248,249],{"key":20,"text":21,"correct":26},{"key":24,"text":25,"correct":22},{"id":251,"libraryId":5,"type":15,"typeLabel":16,"stem":252,"options":253,"answer":21,"analysis":27},1259097,"框架结构建筑的内装饰工程的施工起点与流向可选择自上而下、自下而上及自中间而下再自上而中的施工方案。（ ）",[254,255],{"key":20,"text":21,"correct":22},{"key":24,"text":25,"correct":26},{"id":257,"libraryId":5,"type":15,"typeLabel":16,"stem":258,"options":259,"answer":21,"analysis":27},1259098,"划分施工段的目的，就在于保证不同的施工队组能在不同的施工区段上同时进行施工，消灭由于不同的施工队组不能同时在一个工作面上工作而产生的互等、停歇现象，为流水创造条件。",[260,261],{"key":20,"text":21,"correct":22},{"key":24,"text":25,"correct":26},{"id":263,"libraryId":5,"type":15,"typeLabel":16,"stem":264,"options":265,"answer":25,"analysis":27},1259099,"柔性屋面的施工顺序按照找平层→保温层→柔性防水层→保护隔热层依次进行。",[266,267],{"key":20,"text":21,"correct":26},{"key":24,"text":25,"correct":22},{"id":269,"libraryId":5,"type":15,"typeLabel":16,"stem":270,"options":271,"answer":25,"analysis":27},1259100,"施工区段是指工程对象在组织流水施工中划分的施工区域，包括施工段和施工层。其中把建筑物垂直方向划分的施工区段称为施工段。",[272,273],{"key":20,"text":21,"correct":26},{"key":24,"text":25,"correct":22},{"id":275,"libraryId":5,"type":15,"typeLabel":16,"stem":276,"options":277,"answer":21,"analysis":27},1259101,"施工区段是指工程对象在组织流水施工中划分的施工区域，包括施工段和施工层。",[278,279],{"key":20,"text":21,"correct":22},{"key":24,"text":25,"correct":26},{"id":281,"libraryId":5,"type":15,"typeLabel":16,"stem":282,"options":283,"answer":21,"analysis":27},1259102,"组织流水施工的主要过程：划分施工过程→划分施工段→组织作业队，确定流水节拍→作业队连续作业→各作业队的工作适当搭接起来。",[284,285],{"key":20,"text":21,"correct":22},{"key":24,"text":25,"correct":26},{"id":287,"libraryId":5,"type":15,"typeLabel":16,"stem":288,"options":289,"answer":21,"analysis":27},1259103,"专项工程的进度计划编制应按单位工程的进度计划进行编制。（ ）",[290,291],{"key":20,"text":21,"correct":22},{"key":24,"text":25,"correct":26},{"id":293,"libraryId":5,"type":15,"typeLabel":16,"stem":294,"options":295,"answer":25,"analysis":27},1259104,"关键线路上的工作都是关键工作，非关键线路上的工作都是非关键工作。（ ）",[296,297],{"key":20,"text":21,"correct":26},{"key":24,"text":25,"correct":22},{"id":299,"libraryId":5,"type":15,"typeLabel":16,"stem":300,"options":301,"answer":21,"analysis":27},1259105,"分部（分项）工程施工进度计划是以分部分项为对象，用以具体实施操作其施工过程进度控制文件。（ ）",[302,303],{"key":20,"text":21,"correct":22},{"key":24,"text":25,"correct":26},{"id":305,"libraryId":5,"type":15,"typeLabel":16,"stem":306,"options":307,"answer":21,"analysis":27},1259106,"流水步距是指两个相邻的作业队相继投入工作的最小间隔时间。",[308,309],{"key":20,"text":21,"correct":22},{"key":24,"text":25,"correct":26},{"id":311,"libraryId":5,"type":15,"typeLabel":16,"stem":312,"options":313,"answer":21,"analysis":27},1259107,"施工进度计划是指在施工方案的基础上，根据规定工期和技术物质供应条件，遵循工程的施工顺序，用图表形式表示各分部分项工程搭接关系及工程开竣工时间的一种计划安排。",[314,315],{"key":20,"text":21,"correct":22},{"key":24,"text":25,"correct":26},{"id":317,"libraryId":5,"type":15,"typeLabel":16,"stem":318,"options":319,"answer":25,"analysis":27},1259108,"在施工项目的施工方案选定后，就可编制劳动力、主要材料、构件与半成品、施工机具等各项资源需要量计划。（ ）",[320,321],{"key":20,"text":21,"correct":26},{"key":24,"text":25,"correct":22},[323,327,330,333,336,339],{"id":324,"name":325,"category":7,"favorite":326},1,"领导干部任职前廉政法规知识测试题",92,{"id":328,"name":329,"category":7,"favorite":324},595,"建筑结构与设备",{"id":331,"name":332,"category":7,"favorite":324},715,"招标采购专业知识与法律法规",{"id":334,"name":335,"category":7,"favorite":324},848,"市政方向-通用基础",{"id":337,"name":338,"category":7,"favorite":8},534,"BIM工程师",{"id":340,"name":338,"category":7,"favorite":8},535]