[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"lib-842-14":3},{"library":4,"page":9,"limit":10,"total":11,"questions":12,"related":413},{"id":5,"name":6,"category":7,"favorite":8},842,"(土建施工)专业管理实务 岗位知识","建筑工程",0,14,50,892,[13,38,53,68,83,97,112,127,142,157,169,179,185,191,197,203,209,215,221,227,233,239,245,251,257,263,269,275,281,287,293,299,305,311,317,323,329,335,341,347,353,359,365,371,377,383,389,395,401,407],{"id":14,"libraryId":5,"type":15,"typeLabel":16,"stem":17,"options":18,"answer":36,"analysis":37},1258959,2,"多选题","墙体节能工程使用的保温隔热材料，其（ ）应符合设计要求。",[19,23,27,30,33],{"key":20,"text":21,"correct":22},"A","容重",false,{"key":24,"text":25,"correct":26},"B","导热系数",true,{"key":28,"text":29,"correct":26},"C","密度",{"key":31,"text":32,"correct":26},"D","抗压强度或压缩强度",{"key":34,"text":35,"correct":26},"E","燃烧性能","BCDE","",{"id":39,"libraryId":5,"type":15,"typeLabel":16,"stem":40,"options":41,"answer":52,"analysis":37},1258960,"按照《房屋建筑工程和市政基础设施工程实行见证取样和送检的规定》，见证人员应由建设单位或该工程的监理单位书面通知（ ）。",[42,44,46,48,50],{"key":20,"text":43,"correct":26},"施工单位",{"key":24,"text":45,"correct":26},"检测单位",{"key":28,"text":47,"correct":26},"负责该项工程的质量监督机构",{"key":31,"text":49,"correct":22},"设计单位",{"key":34,"text":51,"correct":22},"政府主管部门","ABC",{"id":54,"libraryId":5,"type":15,"typeLabel":16,"stem":55,"options":56,"answer":67,"analysis":37},1258961,"工程建设标准批准部门应当对工程项目执行强制性标准情况进行监督检查，监督检查可以采取（ ）的方式。",[57,59,61,63,65],{"key":20,"text":58,"correct":22},"定期检查",{"key":24,"text":60,"correct":26},"重点检查",{"key":28,"text":62,"correct":26},"抽查",{"key":31,"text":64,"correct":26},"专项检查",{"key":34,"text":66,"correct":22},"平行检查","BCD",{"id":69,"libraryId":5,"type":15,"typeLabel":16,"stem":70,"options":71,"answer":82,"analysis":37},1258962,"施工从业人员的义务包括（ ）。",[72,74,76,78,80],{"key":20,"text":73,"correct":26},"遵章守规的义务",{"key":24,"text":75,"correct":22},"提高职业技能的义务",{"key":28,"text":77,"correct":26},"掌握安全知识、技能的义务",{"key":31,"text":79,"correct":26},"安全隐患及时报告的义务",{"key":34,"text":81,"correct":22},"遵守劳动纪律和职业道德的义务","ACD",{"id":84,"libraryId":5,"type":15,"typeLabel":16,"stem":85,"options":86,"answer":82,"analysis":37},1258963,"预应力分项工程施工质量验收的一般要求有（ ）。",[87,89,91,93,95],{"key":20,"text":88,"correct":26},"后张法预应力工程的施工应由具有相应资质等级的预应力专业施工单位承担",{"key":24,"text":90,"correct":22},"先张法预应力工程的施工应由具有相应资质等级的预应力专业施工单位承担",{"key":28,"text":92,"correct":26},"预应力筋张拉机具设备及仪表，应定期维护和校验",{"key":31,"text":94,"correct":26},"在浇筑混凝土之前，应进行预应力隐蔽工程验收",{"key":34,"text":96,"correct":22},"浇筑完混凝土时，应进行蒸汽养护",{"id":98,"libraryId":5,"type":15,"typeLabel":16,"stem":99,"options":100,"answer":111,"analysis":37},1258964,"建筑工程质量验收应划分为（ ）。",[101,103,105,107,109],{"key":20,"text":102,"correct":26},"检验批",{"key":24,"text":104,"correct":26},"单位（子单位）工程",{"key":28,"text":106,"correct":26},"分项工程",{"key":31,"text":108,"correct":26},"分部（子分部）工程",{"key":34,"text":110,"correct":22},"分批工程","ABCD",{"id":113,"libraryId":5,"type":15,"typeLabel":16,"stem":114,"options":115,"answer":126,"analysis":37},1258965,"危险性较大的分部分项工程专项施工方案的主要内容应包括（ ）。",[116,118,120,122,124],{"key":20,"text":117,"correct":26},"施工安全保证措施",{"key":24,"text":119,"correct":26},"编制依据",{"key":28,"text":121,"correct":22},"工程造价",{"key":31,"text":123,"correct":26},"施工工艺技术",{"key":34,"text":125,"correct":26},"施工计划","ABDE",{"id":128,"libraryId":5,"type":15,"typeLabel":16,"stem":129,"options":130,"answer":141,"analysis":37},1258966,"危险性较大的分部分项工程中的模板工程包括（ ）。",[131,133,135,137,139],{"key":20,"text":132,"correct":26},"大模板工程",{"key":24,"text":134,"correct":26},"滑模工程",{"key":28,"text":136,"correct":26},"爬模工程",{"key":31,"text":138,"correct":22},"悬模工程",{"key":34,"text":140,"correct":26},"飞模工程","ABCE",{"id":143,"libraryId":5,"type":15,"typeLabel":16,"stem":144,"options":145,"answer":156,"analysis":37},1258967,"危险性较大的分部分项工程中的脚手架工程包括（ ）。",[146,148,150,152,154],{"key":20,"text":147,"correct":26},"附着式整体和分片提升脚手架工程",{"key":24,"text":149,"correct":26},"悬挑式脚手架工程及吊篮脚手架工程",{"key":28,"text":151,"correct":26},"搭设高度24m及以上的落地式钢管脚手架工程",{"key":31,"text":153,"correct":26},"自制卸料平台、移动操作平台工程",{"key":34,"text":155,"correct":26},"新型及异型脚手架工程","ABCDE",{"id":158,"libraryId":5,"type":15,"typeLabel":16,"stem":159,"options":160,"answer":36,"analysis":37},1258968,"建筑工程质量验收的程序和组织中指出，建设单位收到工程报告后，应由建设单位负责人组织（ ）负责人进行单位（子单位）工程验收。",[161,163,164,166,168],{"key":20,"text":162,"correct":22},"质检部门",{"key":24,"text":43,"correct":26},{"key":28,"text":165,"correct":26},"监理单位",{"key":31,"text":167,"correct":26},"勘察单位",{"key":34,"text":49,"correct":26},{"id":170,"libraryId":5,"type":171,"typeLabel":172,"stem":173,"options":174,"answer":178,"analysis":37},1258969,3,"判断题","自由时差是指在不影响其紧后工作最迟开始时间前提下，本工作可以利用的机动时间。",[175,177],{"key":20,"text":176,"correct":22},"正确",{"key":24,"text":178,"correct":26},"错误",{"id":180,"libraryId":5,"type":171,"typeLabel":172,"stem":181,"options":182,"answer":176,"analysis":37},1258970,"流水施工是指所有的施工过程按一定的时间间隔依次投入施工，各个施工过程陆续开工、陆续竣工，使同一施工过程的施工队保持连续、均衡施工，不同的施工过程尽可能平行搭接施工的组织形式。",[183,184],{"key":20,"text":176,"correct":26},{"key":24,"text":178,"correct":22},{"id":186,"libraryId":5,"type":171,"typeLabel":172,"stem":187,"options":188,"answer":178,"analysis":37},1258971,"组织流水施工时，由施工组织原因造成的间歇时间称为技术间歇。（ ）",[189,190],{"key":20,"text":176,"correct":22},{"key":24,"text":178,"correct":26},{"id":192,"libraryId":5,"type":171,"typeLabel":172,"stem":193,"options":194,"answer":176,"analysis":37},1258972,"实施性施工进度计划确定了各分部分项工程的施工时间及其相互之间的衔接、穿插、平行搭接、协作配合等关系。（ ）",[195,196],{"key":20,"text":176,"correct":26},{"key":24,"text":178,"correct":22},{"id":198,"libraryId":5,"type":171,"typeLabel":172,"stem":199,"options":200,"answer":178,"analysis":37},1258973,"根据流水施工节奏特征的不同，流水施工的基本方式分为等节奏流水和异节奏流水两大类。",[201,202],{"key":20,"text":176,"correct":22},{"key":24,"text":178,"correct":26},{"id":204,"libraryId":5,"type":171,"typeLabel":172,"stem":205,"options":206,"answer":176,"analysis":37},1258974,"等节奏流水施工一般适用于工程规模较小，建筑结构比较简单，施工过程不多的房屋或某些构筑物。",[207,208],{"key":20,"text":176,"correct":26},{"key":24,"text":178,"correct":22},{"id":210,"libraryId":5,"type":171,"typeLabel":172,"stem":211,"options":212,"answer":176,"analysis":37},1258975,"非关键线路都有若干机动时间（即时差），它意味着工作完成日期容许适当挪动而不影响工期。",[213,214],{"key":20,"text":176,"correct":26},{"key":24,"text":178,"correct":22},{"id":216,"libraryId":5,"type":171,"typeLabel":172,"stem":217,"options":218,"answer":178,"analysis":37},1258976,"等节奏流水是指同一施工过程在各施工段上的流水节拍都相等，不同施工过程之间的流水节拍不一定相等的一种流水施工方式。",[219,220],{"key":20,"text":176,"correct":22},{"key":24,"text":178,"correct":26},{"id":222,"libraryId":5,"type":171,"typeLabel":172,"stem":223,"options":224,"answer":176,"analysis":37},1258977,"当计算工期不能满足计划工期时，可设法通过压缩关键工作的持续时间，以满足计划工期要求。（ ）",[225,226],{"key":20,"text":176,"correct":26},{"key":24,"text":178,"correct":22},{"id":228,"libraryId":5,"type":171,"typeLabel":172,"stem":229,"options":230,"answer":178,"analysis":37},1258978,"等步距异节拍流水施工适用于施工段大小相等的分部和单位工程的流水施工。",[231,232],{"key":20,"text":176,"correct":22},{"key":24,"text":178,"correct":26},{"id":234,"libraryId":5,"type":171,"typeLabel":172,"stem":235,"options":236,"answer":178,"analysis":37},1258979,"流水步距是指两个相邻的施工过程的施工队组相继进入同一施工段开始施工的时间间隔。",[237,238],{"key":20,"text":176,"correct":22},{"key":24,"text":178,"correct":26},{"id":240,"libraryId":5,"type":171,"typeLabel":172,"stem":241,"options":242,"answer":176,"analysis":37},1258980,"所谓网络图是指由箭线和节点组成的、用来表示工作流程的有向、有序的网状图形。",[243,244],{"key":20,"text":176,"correct":26},{"key":24,"text":178,"correct":22},{"id":246,"libraryId":5,"type":171,"typeLabel":172,"stem":247,"options":248,"answer":176,"analysis":37},1258981,"双代号网计划中，只表示前后相邻工作之间的逻辑关系，既不占用时间，也不耗用资源的虚拟的工作称为虚工作。",[249,250],{"key":20,"text":176,"correct":26},{"key":24,"text":178,"correct":22},{"id":252,"libraryId":5,"type":171,"typeLabel":172,"stem":253,"options":254,"answer":176,"analysis":37},1258982,"网络计划是指用网络图表达任务构成、工作顺序并加注工作时间参数的进度计划。",[255,256],{"key":20,"text":176,"correct":26},{"key":24,"text":178,"correct":22},{"id":258,"libraryId":5,"type":171,"typeLabel":172,"stem":259,"options":260,"answer":176,"analysis":37},1258983,"流水施工就是指所有的施工过程按一定的时间间隔依次投人施工，各个施工过程陆续开工、陆续竣工，使同一施工过程的施工队组保持连续、均衡施工，不同的施工过程尽可能平行搭接施工的组织方式。（ ）",[261,262],{"key":20,"text":176,"correct":26},{"key":24,"text":178,"correct":22},{"id":264,"libraryId":5,"type":171,"typeLabel":172,"stem":265,"options":266,"answer":178,"analysis":37},1258984,"流水步距是指两个相邻施工过程的施工队组相继进人同一施工段开始施工的最小时间间隔，它包括技术与组织间歇时间。（ ）",[267,268],{"key":20,"text":176,"correct":22},{"key":24,"text":178,"correct":26},{"id":270,"libraryId":5,"type":171,"typeLabel":172,"stem":271,"options":272,"answer":176,"analysis":37},1258985,"划分施工段时，各施工段的劳动量或工程量要大致相等，相差宜在15％以内。（ ）",[273,274],{"key":20,"text":176,"correct":26},{"key":24,"text":178,"correct":22},{"id":276,"libraryId":5,"type":171,"typeLabel":172,"stem":277,"options":278,"answer":178,"analysis":37},1258986,"采用累加数列法计算流水步距时，将相邻施工过程的流水节拍累加数列错位相减，数值结果中最小的就是流水步。（ ）",[279,280],{"key":20,"text":176,"correct":22},{"key":24,"text":178,"correct":26},{"id":282,"libraryId":5,"type":171,"typeLabel":172,"stem":283,"options":284,"answer":176,"analysis":37},1258987,"施工过程划分的数目多少、粗细程度，一般与施工计划的性质与作用、施工方案及工程结构、劳动组织及劳动量大小、施工过程内容和工作范围等有关。（ ）",[285,286],{"key":20,"text":176,"correct":26},{"key":24,"text":178,"correct":22},{"id":288,"libraryId":5,"type":171,"typeLabel":172,"stem":289,"options":290,"answer":176,"analysis":37},1258988,"总时差是指在不影响总工期的前提下，本工作可以利用的机动时间。",[291,292],{"key":20,"text":176,"correct":26},{"key":24,"text":178,"correct":22},{"id":294,"libraryId":5,"type":171,"typeLabel":172,"stem":295,"options":296,"answer":176,"analysis":37},1258989,"单代号网络图的开始和结束可增加虚拟的起点节点和终点节点。（ ）",[297,298],{"key":20,"text":176,"correct":26},{"key":24,"text":178,"correct":22},{"id":300,"libraryId":5,"type":171,"typeLabel":172,"stem":301,"options":302,"answer":176,"analysis":37},1258990,"施工进度报告的时间一般与进度检查时间相协调，也可按月、旬、周等间隔时间编写上报。（ ）",[303,304],{"key":20,"text":176,"correct":26},{"key":24,"text":178,"correct":22},{"id":306,"libraryId":5,"type":171,"typeLabel":172,"stem":307,"options":308,"answer":176,"analysis":37},1258991,"编制施工进度计划，首先必须划分施工过程。对于控制性施工进度计划，其施工过程的划分可以粗一些，一般可按分部工程划分施工过程。",[309,310],{"key":20,"text":176,"correct":26},{"key":24,"text":178,"correct":22},{"id":312,"libraryId":5,"type":171,"typeLabel":172,"stem":313,"options":314,"answer":176,"analysis":37},1258992,"施工进度计划是为实现项目设定的工期目标，对各项施工工程的施工顺序、起止时间和相互衔接关系所作的统筹策划和安排。",[315,316],{"key":20,"text":176,"correct":26},{"key":24,"text":178,"correct":22},{"id":318,"libraryId":5,"type":171,"typeLabel":172,"stem":319,"options":320,"answer":176,"analysis":37},1258993,"施工任务委托合同是施工单位编制施工进度计划的依据之一。（ ）",[321,322],{"key":20,"text":176,"correct":26},{"key":24,"text":178,"correct":22},{"id":324,"libraryId":5,"type":171,"typeLabel":172,"stem":325,"options":326,"answer":176,"analysis":37},1258994,"异节奏流水施工可分为异步距异节拍流水施工和等步距异节拍流水施工两种。",[327,328],{"key":20,"text":176,"correct":26},{"key":24,"text":178,"correct":22},{"id":330,"libraryId":5,"type":171,"typeLabel":172,"stem":331,"options":332,"answer":176,"analysis":37},1258995,"职业伤害事故是指因生产过程或与其相关的其他原因造成的伤亡事故。",[333,334],{"key":20,"text":176,"correct":26},{"key":24,"text":178,"correct":22},{"id":336,"libraryId":5,"type":171,"typeLabel":172,"stem":337,"options":338,"answer":178,"analysis":37},1258996,"《生产安全事故报告和调查处理条例》中规定的重大事故是指造成10人以上50人以下死亡，或者50人以上100人以下重伤（包括急性工业中毒），或者5000万元以上1亿元以下直接经济损失的事故。（ ）",[339,340],{"key":20,"text":176,"correct":22},{"key":24,"text":178,"correct":26},{"id":342,"libraryId":5,"type":171,"typeLabel":172,"stem":343,"options":344,"answer":178,"analysis":37},1258997,"根据《企业职工伤亡事故分类》GB6441-1986，综合考虑事故的起因物、致癌物、伤害方式等特点，把危险源分为第一类危险源和第二类危险源。",[345,346],{"key":20,"text":176,"correct":22},{"key":24,"text":178,"correct":26},{"id":348,"libraryId":5,"type":171,"typeLabel":172,"stem":349,"options":350,"answer":178,"analysis":37},1258998,"施工现场的噪声按来源可分为：交通噪声、工业噪声、机械噪声、社会生活噪声等。",[351,352],{"key":20,"text":176,"correct":22},{"key":24,"text":178,"correct":26},{"id":354,"libraryId":5,"type":171,"typeLabel":172,"stem":355,"options":356,"answer":178,"analysis":37},1258999,"通常把可能发生意外释放的能量（能源或能量载体）或危险物质称为第二类危险源。",[357,358],{"key":20,"text":176,"correct":22},{"key":24,"text":178,"correct":26},{"id":360,"libraryId":5,"type":171,"typeLabel":172,"stem":361,"options":362,"answer":176,"analysis":37},1259000,"《生产安全事故报告和调查处理条例》中规定，一般事故是指造成3人以下死亡，或者10人以下重伤，或者1000万元以下直接经济损失的事故。（ ）",[363,364],{"key":20,"text":176,"correct":26},{"key":24,"text":178,"correct":22},{"id":366,"libraryId":5,"type":171,"typeLabel":172,"stem":367,"options":368,"answer":178,"analysis":37},1259001,"第一类危险源是指造成约束、限制能量和危险物质控制措施失效的各种不安全因素。（ ）",[369,370],{"key":20,"text":176,"correct":22},{"key":24,"text":178,"correct":26},{"id":372,"libraryId":5,"type":171,"typeLabel":172,"stem":373,"options":374,"answer":178,"analysis":37},1259002,"职业健康安全是指影响工作场所内员工、合同方人员健康安全的条件和因素。不包含临时工作人员、访问者和其他人员。",[375,376],{"key":20,"text":176,"correct":22},{"key":24,"text":178,"correct":26},{"id":378,"libraryId":5,"type":171,"typeLabel":172,"stem":379,"options":380,"answer":178,"analysis":37},1259003,"一次事故中死亡职工1～2人的事故称为重大伤亡事故。",[381,382],{"key":20,"text":176,"correct":22},{"key":24,"text":178,"correct":26},{"id":384,"libraryId":5,"type":171,"typeLabel":172,"stem":385,"options":386,"answer":176,"analysis":37},1259004,"针对高大模板工程，某施工单位编制了专项的安全施工方案，同时聘请了10位专家开会讨论，从而使存在的危险源辨识更加明确具体，该方法属于专家调查法。（ ）",[387,388],{"key":20,"text":176,"correct":26},{"key":24,"text":178,"correct":22},{"id":390,"libraryId":5,"type":171,"typeLabel":172,"stem":391,"options":392,"answer":178,"analysis":37},1259005,"施工现场搅拌站的污水应直接排人城市污水管道。（ ）",[393,394],{"key":20,"text":176,"correct":22},{"key":24,"text":178,"correct":26},{"id":396,"libraryId":5,"type":171,"typeLabel":172,"stem":397,"options":398,"answer":178,"analysis":37},1259006,"根据《质量管理体系》GB\u002F19001-2008的规定，凡工程产品没有满足某个规定的要求，就称为质量缺陷。",[399,400],{"key":20,"text":176,"correct":22},{"key":24,"text":178,"correct":26},{"id":402,"libraryId":5,"type":171,"typeLabel":172,"stem":403,"options":404,"answer":178,"analysis":37},1259007,"按照产生原因划分，施工单位进料检验不严造成的质量事故应判定为技术原因引发的事故。（ ）",[405,406],{"key":20,"text":176,"correct":22},{"key":24,"text":178,"correct":26},{"id":408,"libraryId":5,"type":171,"typeLabel":172,"stem":409,"options":410,"answer":178,"analysis":37},1259008,"一般项目是对检验批的基本质量起决定性影响的检验项目。（ ）",[411,412],{"key":20,"text":176,"correct":22},{"key":24,"text":178,"correct":26},[414,418,421,424,427,430],{"id":415,"name":416,"category":7,"favorite":417},1,"领导干部任职前廉政法规知识测试题",92,{"id":419,"name":420,"category":7,"favorite":415},595,"建筑结构与设备",{"id":422,"name":423,"category":7,"favorite":415},715,"招标采购专业知识与法律法规",{"id":425,"name":426,"category":7,"favorite":415},848,"市政方向-通用基础",{"id":428,"name":429,"category":7,"favorite":8},534,"BIM工程师",{"id":431,"name":429,"category":7,"favorite":8},535]