[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"lib-842-13":3},{"library":4,"page":9,"limit":10,"total":11,"questions":12,"related":735},{"id":5,"name":6,"category":7,"favorite":8},842,"(土建施工)专业管理实务 岗位知识","建筑工程",0,13,50,892,[13,38,52,67,82,97,112,126,141,155,169,183,198,213,228,242,257,272,286,300,315,329,344,358,372,386,400,414,428,442,456,467,482,496,511,525,539,553,567,581,595,609,623,637,651,665,679,693,707,721],{"id":14,"libraryId":5,"type":15,"typeLabel":16,"stem":17,"options":18,"answer":36,"analysis":37},1258909,2,"多选题","对于建筑物临边外侧靠近街道的情形，结构常用的临边防护措施有（ ）。",[19,23,26,29,33],{"key":20,"text":21,"correct":22},"A","防护栏杆",true,{"key":24,"text":25,"correct":22},"B","挡脚板",{"key":27,"text":28,"correct":22},"C","挂立网",{"key":30,"text":31,"correct":32},"D","里面采取软封闭措施",false,{"key":34,"text":35,"correct":22},"E","采取荆笆等硬封闭措施","ABCE","",{"id":39,"libraryId":5,"type":15,"typeLabel":16,"stem":40,"options":41,"answer":36,"analysis":37},1258910,"施工现场临时用电的三级配电系统，应遵守的配电规则包括（ ）。",[42,44,46,48,50],{"key":20,"text":43,"correct":22},"分级分路规则",{"key":24,"text":45,"correct":22},"动、照分设规则",{"key":27,"text":47,"correct":22},"压缩配电间距规则",{"key":30,"text":49,"correct":32},"两级漏电保护规则",{"key":34,"text":51,"correct":22},"环境安全规则",{"id":53,"libraryId":5,"type":15,"typeLabel":16,"stem":54,"options":55,"answer":66,"analysis":37},1258911,"三级安全教育是指（ ）三个层次的安全教育。",[56,58,60,62,64],{"key":20,"text":57,"correct":22},"公司",{"key":24,"text":59,"correct":22},"项目经理部",{"key":27,"text":61,"correct":22},"施工班组",{"key":30,"text":63,"correct":32},"监理部",{"key":34,"text":65,"correct":32},"建设单位部门","ABC",{"id":68,"libraryId":5,"type":15,"typeLabel":16,"stem":69,"options":70,"answer":81,"analysis":37},1258912,"安装作业前，安装单位应根据施工升降机（ ）等相关资料，确定所安装的施工升降机和辅助起重设备的基础、地基承载力、预埋件、基础排水措施等符合施工升降机安装、拆卸工程专项施工方案的要求。",[71,73,75,77,79],{"key":20,"text":72,"correct":32},"使用说明书",{"key":24,"text":74,"correct":32},"出厂合格证",{"key":27,"text":76,"correct":22},"隐蔽工程验收单",{"key":30,"text":78,"correct":22},"混凝土强度报告",{"key":34,"text":80,"correct":22},"基础验收表","CDE",{"id":83,"libraryId":5,"type":15,"typeLabel":16,"stem":84,"options":85,"answer":96,"analysis":37},1258913,"对达到一定规模的危险性较大的分部分项工程应编制专项施工方案，并附安全验算结果。这些工程包括（ ）。",[86,88,90,92,94],{"key":20,"text":87,"correct":22},"土方开挖工程",{"key":24,"text":89,"correct":32},"钢筋工程",{"key":27,"text":91,"correct":22},"爆破工程",{"key":30,"text":93,"correct":22},"模板工程",{"key":34,"text":95,"correct":22},"脚手架工程","ACDE",{"id":98,"libraryId":5,"type":15,"typeLabel":16,"stem":99,"options":100,"answer":111,"analysis":37},1258914,"基础施工阶段，施工安全控制要点有（ ）。",[101,103,105,107,109],{"key":20,"text":102,"correct":22},"挖土机械作业安全",{"key":24,"text":104,"correct":22},"防水施工时的防火、防毒",{"key":27,"text":106,"correct":22},"人工挖扩孔桩安全",{"key":30,"text":108,"correct":22},"边坡防护安全",{"key":34,"text":110,"correct":22},"降水设备与临时用电安全","ABCDE",{"id":113,"libraryId":5,"type":15,"typeLabel":16,"stem":114,"options":115,"answer":66,"analysis":37},1258915,"关于保证模板安装施工安全的基本要求，说法正确的有（ ）。",[116,118,120,122,124],{"key":20,"text":117,"correct":22},"雨期施工，高耸结构的模板作业，要安装避雷装置",{"key":24,"text":119,"correct":22},"夜间施工，必须有足够的照明",{"key":27,"text":121,"correct":22},"架空输电线路下方进行模板施工，如果不能停电作业，应采取隔离防护措施",{"key":30,"text":123,"correct":32},"模板工程作业高度在1.8m及以上时，要有安全可靠的操作架子",{"key":34,"text":125,"correct":32},"刮风天气不宜进行大块模板拼装和吊装作业",{"id":127,"libraryId":5,"type":15,"typeLabel":16,"stem":128,"options":129,"answer":140,"analysis":37},1258916,"脚手架在使用期间，严禁拆除（ ）。",[130,132,134,136,138],{"key":20,"text":131,"correct":22},"主节点处的纵向、横向水平杆",{"key":24,"text":133,"correct":32},"非施工层上，非主节点处的横向水平杆",{"key":27,"text":135,"correct":22},"连墙件",{"key":30,"text":137,"correct":22},"纵横向扫地杆",{"key":34,"text":139,"correct":32},"非作业层上的挡脚板","ACD",{"id":142,"libraryId":5,"type":15,"typeLabel":16,"stem":143,"options":144,"answer":111,"analysis":37},1258917,"一般工程安全技术措施的编制应考虑的内容有（ ）。",[145,147,149,151,153],{"key":20,"text":146,"correct":22},"进入施工现场的安全规定",{"key":24,"text":148,"correct":22},"施工用电安全",{"key":27,"text":150,"correct":22},"机械设备的安全使用",{"key":30,"text":152,"correct":22},"防火防爆措施",{"key":34,"text":154,"correct":22},"地面及深坑作业的防护",{"id":156,"libraryId":5,"type":15,"typeLabel":16,"stem":157,"options":158,"answer":66,"analysis":37},1258918,"进行安全生产管理时，“三个同时”是指安全生产与（ ）同步策划、同步发展、同步实施的原则。",[159,161,163,165,167],{"key":20,"text":160,"correct":22},"经济建设",{"key":24,"text":162,"correct":22},"企业深化改革",{"key":27,"text":164,"correct":22},"技术改造",{"key":30,"text":166,"correct":32},"安全管理",{"key":34,"text":168,"correct":32},"安全检查",{"id":170,"libraryId":5,"type":15,"typeLabel":16,"stem":171,"options":172,"answer":111,"analysis":37},1258919,"危险源识别应注意的事项有（ ）。",[173,175,177,179,181],{"key":20,"text":174,"correct":22},"充分了解危险源的分部",{"key":24,"text":176,"correct":22},"弄清危险源伤害的方式或途径",{"key":27,"text":178,"correct":22},"确认危险源伤害的范围",{"key":30,"text":180,"correct":22},"要特别关注重大危险源，防止遗漏",{"key":34,"text":182,"correct":22},"对危险源保持高度警觉，持续进行动态识别",{"id":184,"libraryId":5,"type":15,"typeLabel":16,"stem":185,"options":186,"answer":197,"analysis":37},1258920,"施工过程中混凝土结构产生裂缝的主要原因有（ ）。",[187,189,191,193,195],{"key":20,"text":188,"correct":32},"接缝处模板拼缝不严，漏浆",{"key":24,"text":190,"correct":22},"模板局部沉浆",{"key":27,"text":192,"correct":22},"拆模过早",{"key":30,"text":194,"correct":22},"养护时间过短",{"key":34,"text":196,"correct":22},"混凝土养护期间内部与表面温差过大","BCDE",{"id":199,"libraryId":5,"type":15,"typeLabel":16,"stem":200,"options":201,"answer":212,"analysis":37},1258921,"危险源辨识是识别危险源的存在并确定其特性的过程。施工现场危险源识别的方法有（ ）。",[202,204,206,208,210],{"key":20,"text":203,"correct":22},"专家调查法",{"key":24,"text":205,"correct":22},"安全检查表法",{"key":27,"text":207,"correct":22},"现场调查法",{"key":30,"text":209,"correct":22},"工作任务分析法",{"key":34,"text":211,"correct":32},"头脑风暴法","ABCD",{"id":214,"libraryId":5,"type":15,"typeLabel":16,"stem":215,"options":216,"answer":227,"analysis":37},1258922,"下列属于施工现场物的不安全状态的有（ ）。",[217,219,221,223,225],{"key":20,"text":218,"correct":22},"防护、保险、信号等装置缺乏或有缺陷",{"key":24,"text":220,"correct":22},"设备、设施、工具、附件有缺陷",{"key":27,"text":222,"correct":32},"技术和设计上有缺陷",{"key":30,"text":224,"correct":22},"生产（施工）场地环境不良",{"key":34,"text":226,"correct":22},"个人防护用品用具缺乏或有缺陷","ABDE",{"id":229,"libraryId":5,"type":15,"typeLabel":16,"stem":230,"options":231,"answer":36,"analysis":37},1258923,"人工挖孔灌注桩施工过程中应对（ ）等进行全过程检查。",[232,234,236,238,240],{"key":20,"text":233,"correct":22},"成孔清渣",{"key":24,"text":235,"correct":22},"放置钢筋笼",{"key":27,"text":237,"correct":22},"混凝土灌注",{"key":30,"text":239,"correct":32},"周边土的强度",{"key":34,"text":241,"correct":22},"挖孔桩的孔底持力层土（岩）性",{"id":243,"libraryId":5,"type":15,"typeLabel":16,"stem":244,"options":245,"answer":256,"analysis":37},1258924,"施工质量事故发生的原因很多，属于违背建设程序的有（ ）。",[246,248,250,252,254],{"key":20,"text":247,"correct":22},"工程无施工许可证",{"key":24,"text":249,"correct":32},"使用不合格材料",{"key":27,"text":251,"correct":22},"施工单位资质不符合要求",{"key":30,"text":253,"correct":32},"结构设计方案不正确",{"key":34,"text":255,"correct":32},"施工顺序颠倒","AC",{"id":258,"libraryId":5,"type":15,"typeLabel":16,"stem":259,"options":260,"answer":271,"analysis":37},1258925,"根据《企业职工伤亡事故调查分析规则》规定，下列属于安全事故直接原因的有（ ）。",[261,263,265,267,269],{"key":20,"text":262,"correct":22},"物的不安全状态",{"key":24,"text":264,"correct":22},"人的不安全行为",{"key":27,"text":266,"correct":32},"对现场工作缺乏检查",{"key":30,"text":268,"correct":32},"劳动组织不合理",{"key":34,"text":270,"correct":32},"教育培训不够","AB",{"id":273,"libraryId":5,"type":15,"typeLabel":16,"stem":274,"options":275,"answer":81,"analysis":37},1258926,"在土方回填工程检验批质量验收记录表中，属于一般项目的有（ ）。",[276,278,280,282,284],{"key":20,"text":277,"correct":32},"标高",{"key":24,"text":279,"correct":32},"分层压实系数",{"key":27,"text":281,"correct":22},"回填土料",{"key":30,"text":283,"correct":22},"分层厚度及含水量",{"key":34,"text":285,"correct":22},"表面平整度",{"id":287,"libraryId":5,"type":15,"typeLabel":16,"stem":288,"options":289,"answer":111,"analysis":37},1258927,"建设工程信息管理中应遵循的基本原则有（ ）。",[290,292,294,296,298],{"key":20,"text":291,"correct":22},"标准化原则",{"key":24,"text":293,"correct":22},"有效性原则",{"key":27,"text":295,"correct":22},"时效性原则",{"key":30,"text":297,"correct":22},"可预见原则",{"key":34,"text":299,"correct":22},"定量化原则",{"id":301,"libraryId":5,"type":15,"typeLabel":16,"stem":302,"options":303,"answer":314,"analysis":37},1258928,"建设工程图纸会审纪要的主要内容应包括（ ）。",[304,306,308,310,312],{"key":20,"text":305,"correct":32},"设计变更",{"key":24,"text":307,"correct":22},"为便于施工，施工单位要求修改的内容及解决办法",{"key":27,"text":309,"correct":22},"图纸会审的时间和地点",{"key":30,"text":311,"correct":22},"相关单位对设计上提出的要求及需修改的内容",{"key":34,"text":313,"correct":32},"技术核定","BCD",{"id":316,"libraryId":5,"type":15,"typeLabel":16,"stem":317,"options":318,"answer":66,"analysis":37},1258929,"属于结构吊装工程验收记录表格中主控项目的是（ ）。",[319,321,323,325,327],{"key":20,"text":320,"correct":22},"预制构件的进场检查",{"key":24,"text":322,"correct":22},"预制构件的连接",{"key":27,"text":324,"correct":22},"接头和拼缝的混凝土强度",{"key":30,"text":326,"correct":32},"预制构件吊装",{"key":34,"text":328,"correct":32},"安装控制标志",{"id":330,"libraryId":5,"type":15,"typeLabel":16,"stem":331,"options":332,"answer":343,"analysis":37},1258930,"建设工程项目信息管理中，为形成各类报表和报告，应当建立（ ）的工作流程。",[333,335,337,339,341],{"key":20,"text":334,"correct":22},"收集信息、录入信息",{"key":24,"text":336,"correct":32},"信息管理和输出",{"key":27,"text":338,"correct":22},"审核信息、加工信息",{"key":30,"text":340,"correct":32},"信息整理和共享",{"key":34,"text":342,"correct":22},"信息传输和发布","ACE",{"id":345,"libraryId":5,"type":15,"typeLabel":16,"stem":346,"options":347,"answer":212,"analysis":37},1258931,"工程实施的依据性资料，贯穿于施工全过程，在施工信息资料管理中必须作为纲领性文件加以管理、输人并随时更新，该类资料主要包括（ ）。",[348,350,352,354,356],{"key":20,"text":349,"correct":22},"施工合同",{"key":24,"text":351,"correct":22},"地质勘察报告",{"key":27,"text":353,"correct":22},"施工组织设计",{"key":30,"text":355,"correct":22},"图纸会审纪要",{"key":34,"text":357,"correct":32},"质量问题调查报告",{"id":359,"libraryId":5,"type":15,"typeLabel":16,"stem":360,"options":361,"answer":271,"analysis":37},1258932,"墙体节能工程当采用外保温定型产品或成套技术时，其型式检验报告应包括（）检验。",[362,364,366,368,370],{"key":20,"text":363,"correct":22},"A安全性",{"key":24,"text":365,"correct":22},"B耐候性",{"key":27,"text":367,"correct":32},"C耐久性",{"key":30,"text":369,"correct":32},"D保温性",{"key":34,"text":371,"correct":32},"E粘结性",{"id":373,"libraryId":5,"type":15,"typeLabel":16,"stem":374,"options":375,"answer":36,"analysis":37},1258933,"主要技术经济指标是单位工程施工组织设计的编制内容之一，主要包括（）。",[376,378,380,382,384],{"key":20,"text":377,"correct":22},"A工期指标",{"key":24,"text":379,"correct":22},"B安全指标",{"key":27,"text":381,"correct":22},"C降低成本指标",{"key":30,"text":383,"correct":32},"D工程进度指标",{"key":34,"text":385,"correct":22},"E工程质量指标",{"id":387,"libraryId":5,"type":15,"typeLabel":16,"stem":388,"options":389,"answer":271,"analysis":37},1258934,"高强度螺栓根据其受力特征可分为（）受力类型。",[390,392,394,396,398],{"key":20,"text":391,"correct":22},"A摩擦型高强度螺栓",{"key":24,"text":393,"correct":22},"B承压型高强度螺栓",{"key":27,"text":395,"correct":32},"CA型螺栓",{"key":30,"text":397,"correct":32},"DB型螺栓",{"key":34,"text":399,"correct":32},"EC型螺栓",{"id":401,"libraryId":5,"type":15,"typeLabel":16,"stem":402,"options":403,"answer":96,"analysis":37},1258935,"混凝土拌合物运输的基本要求是（ ）。",[404,406,408,410,412],{"key":20,"text":405,"correct":22},"不产生离析现象",{"key":24,"text":407,"correct":32},"在混凝土终凝前能有充分的时间进行浇筑和捣实",{"key":27,"text":409,"correct":22},"保证混凝土浇筑能连续进行。",{"key":30,"text":411,"correct":22},"在混凝土初凝前能有充分的时间进行浇筑和捣实",{"key":34,"text":413,"correct":22},"保证混凝土浇筑时具有设计规定的坍落度",{"id":415,"libraryId":5,"type":15,"typeLabel":16,"stem":416,"options":417,"answer":66,"analysis":37},1258936,"各地住房和城乡建设主管部门应当按专业类别建立专家库，专家库的专家应当具备的基本条件有（ ）。",[418,420,422,424,426],{"key":20,"text":419,"correct":22},"从事专业工作15年以上或具有丰富的专业经验",{"key":24,"text":421,"correct":22},"诚实守信、作风正派、学术严谨",{"key":27,"text":423,"correct":22},"具有高级专业技术职称",{"key":30,"text":425,"correct":32},"从事专业工作20年以上或具有丰富的专业经验",{"key":34,"text":427,"correct":32},"做事认真、责任心强",{"id":429,"libraryId":5,"type":15,"typeLabel":16,"stem":430,"options":431,"answer":111,"analysis":37},1258937,"根据成孔方法不同，混凝土灌注桩可分为（ ）。",[432,434,436,438,440],{"key":20,"text":433,"correct":22},"干作业成孔灌注桩",{"key":24,"text":435,"correct":22},"爆扩成孔灌注桩",{"key":27,"text":437,"correct":22},"人工挖孔灌注桩",{"key":30,"text":439,"correct":22},"套管成孔灌注桩",{"key":34,"text":441,"correct":22},"泥浆护壁成孔灌注桩",{"id":443,"libraryId":5,"type":15,"typeLabel":16,"stem":444,"options":445,"answer":96,"analysis":37},1258938,"单位工程的项目施工过程中，施工组织设计应及时进行修改或补充的情况有（ ）。",[446,448,450,452,454],{"key":20,"text":447,"correct":22},"工程设计有重大修改",{"key":24,"text":449,"correct":32},"工期延误",{"key":27,"text":451,"correct":22},"主要施工资源配置有重大调整，如施工环境有重大改变",{"key":30,"text":453,"correct":22},"主要施工方法有重大调整",{"key":34,"text":455,"correct":22},"有关法律、法规、规范和标准实施、修订和废止",{"id":457,"libraryId":5,"type":15,"typeLabel":16,"stem":458,"options":459,"answer":36,"analysis":37},1258939,"项目实施过程中，发生下列（ ）情况之一时，专项施工方案应及时进行修改或补充。",[460,461,462,463,465],{"key":20,"text":447,"correct":22},{"key":24,"text":455,"correct":22},{"key":27,"text":453,"correct":22},{"key":30,"text":464,"correct":32},"更换项目经理",{"key":34,"text":466,"correct":22},"施工环境有重大改变",{"id":468,"libraryId":5,"type":15,"typeLabel":16,"stem":469,"options":470,"answer":481,"analysis":37},1258940,"大六角头型高强度螺栓的紧固方法通常有（ ）。",[471,473,475,477,479],{"key":20,"text":472,"correct":22},"力矩法",{"key":24,"text":474,"correct":22},"转角法",{"key":27,"text":476,"correct":32},"电动扳手紧固法",{"key":30,"text":478,"correct":22},"扭掉螺栓尾部梅花卡头",{"key":34,"text":480,"correct":32},"扭剪法","ABD",{"id":483,"libraryId":5,"type":15,"typeLabel":16,"stem":484,"options":485,"answer":111,"analysis":37},1258941,"大模板是一种大尺寸的工具式定型模板，主要由（ ）组成。",[486,488,490,492,494],{"key":20,"text":487,"correct":22},"面板",{"key":24,"text":489,"correct":22},"加劲肋",{"key":27,"text":491,"correct":22},"竖楞",{"key":30,"text":493,"correct":22},"支撑系统",{"key":34,"text":495,"correct":22},"附件",{"id":497,"libraryId":5,"type":15,"typeLabel":16,"stem":498,"options":499,"answer":510,"analysis":37},1258942,"地面水的排除通长采用设置（ ）等设施来进行。",[500,502,504,506,508],{"key":20,"text":501,"correct":22},"排水沟",{"key":24,"text":503,"correct":22},"修筑土堤",{"key":27,"text":505,"correct":32},"集水井",{"key":30,"text":507,"correct":32},"井点",{"key":34,"text":509,"correct":22},"截水沟","ABE",{"id":512,"libraryId":5,"type":15,"typeLabel":16,"stem":513,"options":514,"answer":111,"analysis":37},1258943,"建筑工程施工技术交底文件的基本内容包括（ ）。",[515,517,519,521,523],{"key":20,"text":516,"correct":22},"施工质量要求及质量保证措施",{"key":24,"text":518,"correct":22},"施工准备工作情况",{"key":27,"text":520,"correct":22},"劳动力安排及施工周期",{"key":30,"text":522,"correct":22},"主要施工方法",{"key":34,"text":524,"correct":22},"环境安全及文明施工等注意事项及安全保证措施",{"id":526,"libraryId":5,"type":15,"typeLabel":16,"stem":527,"options":528,"answer":96,"analysis":37},1258944,"深基坑的土方开挖应遵循（ ）的原则。",[529,531,533,535,537],{"key":20,"text":530,"correct":22},"先撑后挖",{"key":24,"text":532,"correct":32},"先撑先挖",{"key":27,"text":534,"correct":22},"分层开挖",{"key":30,"text":536,"correct":22},"严禁超挖",{"key":34,"text":538,"correct":22},"开槽支撑",{"id":540,"libraryId":5,"type":15,"typeLabel":16,"stem":541,"options":542,"answer":66,"analysis":37},1258945,"涂膜防水屋面施工时，涂料的涂布顺序为（ ）。",[543,545,547,549,551],{"key":20,"text":544,"correct":22},"先高跨后低跨",{"key":24,"text":546,"correct":22},"先远后近",{"key":27,"text":548,"correct":22},"先立面后平面",{"key":30,"text":550,"correct":32},"先内后外",{"key":34,"text":552,"correct":32},"先外后里",{"id":554,"libraryId":5,"type":15,"typeLabel":16,"stem":555,"options":556,"answer":212,"analysis":37},1258946,"人工挖孔灌注桩常用的护壁方法有（ ）。",[557,559,561,563,565],{"key":20,"text":558,"correct":22},"现浇混凝土护壁",{"key":24,"text":560,"correct":22},"沉井护壁",{"key":27,"text":562,"correct":22},"钢套管护壁",{"key":30,"text":564,"correct":22},"砖护壁",{"key":34,"text":566,"correct":32},"泥浆护壁",{"id":568,"libraryId":5,"type":15,"typeLabel":16,"stem":569,"options":570,"answer":481,"analysis":37},1258947,"屋面防水卷材铺贴采用搭接法时，做法正确的是（ ）。",[571,573,575,577,579],{"key":20,"text":572,"correct":22},"平行于屋脊的搭接缝顺水流方向搭接",{"key":24,"text":574,"correct":22},"垂直于屋脊的搭接缝顺年最大频率风向搭接",{"key":27,"text":576,"correct":32},"垂直于屋脊的搭接缝应顺流水方向搭接",{"key":30,"text":578,"correct":22},"上下层卷材的搭接缝错开",{"key":34,"text":580,"correct":32},"上下层卷材可相互垂直铺贴",{"id":582,"libraryId":5,"type":15,"typeLabel":16,"stem":583,"options":584,"answer":256,"analysis":37},1258948,"一般钢柱的吊装方法有（ ）。",[585,587,589,591,593],{"key":20,"text":586,"correct":22},"旋转法",{"key":24,"text":588,"correct":32},"直行法",{"key":27,"text":590,"correct":22},"滑行法",{"key":30,"text":592,"correct":32},"曲线法",{"key":34,"text":594,"correct":32},"螺旋法",{"id":596,"libraryId":5,"type":15,"typeLabel":16,"stem":597,"options":598,"answer":212,"analysis":37},1258949,"砌体质量的好坏取决于组成砌体的原材料质量和砌筑方法，故在砌筑时应掌握正确的操作方法，做到（ ）。",[599,601,603,605,607],{"key":20,"text":600,"correct":22},"横平竖直",{"key":24,"text":602,"correct":22},"砂浆饱满",{"key":27,"text":604,"correct":22},"错缝搭接",{"key":30,"text":606,"correct":22},"接槎可靠",{"key":34,"text":608,"correct":32},"砌筑美观",{"id":610,"libraryId":5,"type":15,"typeLabel":16,"stem":611,"options":612,"answer":81,"analysis":37},1258950,"施工组织设计按编制对象，可分为（ ）。",[613,615,617,619,621],{"key":20,"text":614,"correct":32},"标后施工组织设计",{"key":24,"text":616,"correct":32},"标前施工组织设计",{"key":27,"text":618,"correct":22},"施工方案",{"key":30,"text":620,"correct":22},"施工组织总设计",{"key":34,"text":622,"correct":22},"单位工程施工组织设计",{"id":624,"libraryId":5,"type":15,"typeLabel":16,"stem":625,"options":626,"answer":96,"analysis":37},1258951,"砖砌体的组砌形式主要有（ ）。",[627,629,631,633,635],{"key":20,"text":628,"correct":22},"一顺一丁",{"key":24,"text":630,"correct":32},"二顺一丁",{"key":27,"text":632,"correct":22},"三顺一丁",{"key":30,"text":634,"correct":22},"梅花丁",{"key":34,"text":636,"correct":22},"全丁式",{"id":638,"libraryId":5,"type":15,"typeLabel":16,"stem":639,"options":640,"answer":111,"analysis":37},1258952,"卷材防水屋面一般由（ ）、保护层组成。",[641,643,645,647,649],{"key":20,"text":642,"correct":22},"结构层",{"key":24,"text":644,"correct":22},"找平层",{"key":27,"text":646,"correct":22},"保温层",{"key":30,"text":648,"correct":22},"隔汽层",{"key":34,"text":650,"correct":22},"防水层",{"id":652,"libraryId":5,"type":15,"typeLabel":16,"stem":653,"options":654,"answer":111,"analysis":37},1258953,"钢筋混凝土预制桩的施工主要包括（）等过程。",[655,657,659,661,663],{"key":20,"text":656,"correct":22},"A起吊",{"key":24,"text":658,"correct":22},"B制作",{"key":27,"text":660,"correct":22},"C堆放",{"key":30,"text":662,"correct":22},"D沉桩",{"key":34,"text":664,"correct":22},"E运输",{"id":666,"libraryId":5,"type":15,"typeLabel":16,"stem":667,"options":668,"answer":227,"analysis":37},1258954,"建设工程专项检测的业务内容包括（ ）。",[669,671,673,675,677],{"key":20,"text":670,"correct":22},"地基基础工程检测",{"key":24,"text":672,"correct":22},"主体结构工程现场检测",{"key":27,"text":674,"correct":32},"模板工程检测",{"key":30,"text":676,"correct":22},"建筑幕墙工程检测",{"key":34,"text":678,"correct":22},"钢结构工程检测",{"id":680,"libraryId":5,"type":15,"typeLabel":16,"stem":681,"options":682,"answer":111,"analysis":37},1258955,"砌体工程施工质量验收的基本要求中规定，下列哪些墙体或部位不得设置脚手眼（ ）。",[683,685,687,689,691],{"key":20,"text":684,"correct":22},"夹心复合墙外墙",{"key":24,"text":686,"correct":22},"过梁上与过梁成60°角的三角形范围及过梁净跨度1\u002F2的高度范围内",{"key":27,"text":688,"correct":22},"120mm厚墙、清水墙、料石墙、独立柱和附墙柱",{"key":30,"text":690,"correct":22},"轻质墙体",{"key":34,"text":692,"correct":22},"梁或梁垫下及其作用500mm范围内",{"id":694,"libraryId":5,"type":15,"typeLabel":16,"stem":695,"options":696,"answer":197,"analysis":37},1258956,"当施工中或验收时出现下列（ ）的情况，可采用现场检验方法对砂浆或砌体强度进行实体检测，并判定其强度。",[697,699,701,703,705],{"key":20,"text":698,"correct":32},"监理工程师有要求",{"key":24,"text":700,"correct":22},"砂浆试块缺乏代表性或试块数量不足",{"key":27,"text":702,"correct":22},"对砂浆试块的试验结果有怀疑或有争议",{"key":30,"text":704,"correct":22},"砂浆试块的试验结果，不能满足设计要求",{"key":34,"text":706,"correct":22},"发生工程事故，需要进一步分析事故原因",{"id":708,"libraryId":5,"type":15,"typeLabel":16,"stem":709,"options":710,"answer":111,"analysis":37},1258957,"混凝土结构子分部工程可划分为（ ）分项工程。",[711,713,715,717,719],{"key":20,"text":712,"correct":22},"模板",{"key":24,"text":714,"correct":22},"钢筋",{"key":27,"text":716,"correct":22},"现浇结构和装配式结构",{"key":30,"text":718,"correct":22},"预应力",{"key":34,"text":720,"correct":22},"混凝土",{"id":722,"libraryId":5,"type":15,"typeLabel":16,"stem":723,"options":724,"answer":111,"analysis":37},1258958,"施工从业人员的权利除知情权外，还包括（ ）。",[725,727,729,731,733],{"key":20,"text":726,"correct":22},"签订合法劳动合同权",{"key":24,"text":728,"correct":22},"建议、批评、检举、控告权",{"key":27,"text":730,"correct":22},"对违章指挥、强令冒险作业的拒绝权",{"key":30,"text":732,"correct":22},"在有安全危险时有停止作业及紧急撤离权",{"key":34,"text":734,"correct":22},"依法获得赔偿权",[736,740,743,746,749,752],{"id":737,"name":738,"category":7,"favorite":739},1,"领导干部任职前廉政法规知识测试题",92,{"id":741,"name":742,"category":7,"favorite":737},595,"建筑结构与设备",{"id":744,"name":745,"category":7,"favorite":737},715,"招标采购专业知识与法律法规",{"id":747,"name":748,"category":7,"favorite":737},848,"市政方向-通用基础",{"id":750,"name":751,"category":7,"favorite":8},534,"BIM工程师",{"id":753,"name":751,"category":7,"favorite":8},535]