[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"lib-842-12":3},{"library":4,"page":9,"limit":10,"total":11,"questions":12,"related":737},{"id":5,"name":6,"category":7,"favorite":8},842,"(土建施工)专业管理实务 岗位知识","建筑工程",0,12,50,892,[13,38,53,68,82,97,112,127,142,157,171,186,200,214,229,244,259,274,289,301,315,329,343,357,371,385,400,414,429,443,457,471,485,500,514,528,542,556,569,584,598,613,627,641,656,670,684,698,712,724],{"id":14,"libraryId":5,"type":15,"typeLabel":16,"stem":17,"options":18,"answer":36,"analysis":37},1258859,2,"多选题","下列关于各专业施工图的排列顺序说法正确的是（ ）。",[19,23,26,29,32],{"key":20,"text":21,"correct":22},"A","基础图在前，详图在后",true,{"key":24,"text":25,"correct":22},"B","总体图在前，局部图在后",{"key":27,"text":28,"correct":22},"C","主要部分在前，次要部分在后",{"key":30,"text":31,"correct":22},"D","先施工的在前，后施工的在后",{"key":33,"text":34,"correct":35},"E","重要部分在前，次要部分在后",false,"ABCD","",{"id":39,"libraryId":5,"type":15,"typeLabel":16,"stem":40,"options":41,"answer":52,"analysis":37},1258860,"建筑工程施工图的识读方法包括（ ）。",[42,44,46,48,50],{"key":20,"text":43,"correct":22},"总体了解",{"key":24,"text":45,"correct":22},"前后对照",{"key":27,"text":47,"correct":35},"详图细读",{"key":30,"text":49,"correct":22},"顺序识读",{"key":33,"text":51,"correct":22},"重点细读","ABDE",{"id":54,"libraryId":5,"type":15,"typeLabel":16,"stem":55,"options":56,"answer":67,"analysis":37},1258861,"砖基础的转角处，交接处，为错缝需要加砌（ ）砖长。",[57,59,61,63,65],{"key":20,"text":58,"correct":22},"1\u002F4",{"key":24,"text":60,"correct":22},"1\u002F2",{"key":27,"text":62,"correct":35},"2\u002F3",{"key":30,"text":64,"correct":22},"3\u002F4",{"key":33,"text":66,"correct":35},"1","ABD",{"id":69,"libraryId":5,"type":15,"typeLabel":16,"stem":70,"options":71,"answer":36,"analysis":37},1258862,"地下结构防水混凝土的（ ）等设置和构造，均须符合设计要求，严禁有渗漏。",[72,74,76,78,80],{"key":20,"text":73,"correct":22},"变形缝",{"key":24,"text":75,"correct":22},"后浇带",{"key":27,"text":77,"correct":22},"穿墙管道",{"key":30,"text":79,"correct":22},"埋设件",{"key":33,"text":81,"correct":35},"模板缝",{"id":83,"libraryId":5,"type":15,"typeLabel":16,"stem":84,"options":85,"answer":96,"analysis":37},1258863,"砖砌条形基础，当基底标高不同时，正确的施工方法是（ ）。",[86,88,90,92,94],{"key":20,"text":87,"correct":22},"从低处砌起，由高处向低处搭接",{"key":24,"text":89,"correct":35},"从高处砌起，由低处向高处搭接",{"key":27,"text":91,"correct":22},"搭砌长度不应小于砖基础大放脚的高度",{"key":30,"text":93,"correct":35},"搭砌长度不小于基础垫层厚度",{"key":33,"text":95,"correct":22},"搭接长度范围内下层基础应扩大砌筑","ACE",{"id":98,"libraryId":5,"type":15,"typeLabel":16,"stem":99,"options":100,"answer":111,"analysis":37},1258864,"下列属于现浇钢筋混凝土结构分项工程的有（ ）。",[101,103,105,107,109],{"key":20,"text":102,"correct":22},"钢筋",{"key":24,"text":104,"correct":22},"模板",{"key":27,"text":106,"correct":22},"混凝土",{"key":30,"text":108,"correct":35},"砌体",{"key":33,"text":110,"correct":35},"焊接","ABC",{"id":113,"libraryId":5,"type":15,"typeLabel":16,"stem":114,"options":115,"answer":126,"analysis":37},1258865,"施工技术交底一般包括（ ）。",[116,118,120,122,124],{"key":20,"text":117,"correct":22},"设计交底",{"key":24,"text":119,"correct":35},"合同交底",{"key":27,"text":121,"correct":22},"施工组织设计交底",{"key":30,"text":123,"correct":22},"分部、分项工程施工技术交底",{"key":33,"text":125,"correct":35},"材料交底","ACD",{"id":128,"libraryId":5,"type":15,"typeLabel":16,"stem":129,"options":130,"answer":141,"analysis":37},1258866,"外防水卷材防水层的铺贴方法，按其与地下结构施工的先后顺序分为（ ）。",[131,133,135,137,139],{"key":20,"text":132,"correct":22},"外防外贴法",{"key":24,"text":134,"correct":35},"内防外贴法",{"key":27,"text":136,"correct":22},"外防内贴法",{"key":30,"text":138,"correct":35},"内防内贴法",{"key":33,"text":140,"correct":35},"满贴法","AC",{"id":143,"libraryId":5,"type":15,"typeLabel":16,"stem":144,"options":145,"answer":156,"analysis":37},1258867,"模板分项工程中，模板及其支架必须有足够的（ ）。",[146,148,150,152,154],{"key":20,"text":147,"correct":35},"整体性",{"key":24,"text":149,"correct":22},"强度",{"key":27,"text":151,"correct":22},"刚度",{"key":30,"text":153,"correct":22},"稳定性",{"key":33,"text":155,"correct":35},"安全性","BCD",{"id":158,"libraryId":5,"type":15,"typeLabel":16,"stem":159,"options":160,"answer":36,"analysis":37},1258868,"基础混凝土的组成材料应采用同一品种的（ ）。",[161,163,165,167,169],{"key":20,"text":162,"correct":22},"水泥",{"key":24,"text":164,"correct":22},"掺合料",{"key":27,"text":166,"correct":22},"外加剂",{"key":30,"text":168,"correct":22},"同一配合比",{"key":33,"text":170,"correct":35},"发泡剂",{"id":172,"libraryId":5,"type":15,"typeLabel":16,"stem":173,"options":174,"answer":185,"analysis":37},1258869,"混凝土筏形基础分为（ ）等类型。",[175,177,179,181,183],{"key":20,"text":176,"correct":22},"梁板式",{"key":24,"text":178,"correct":35},"条形基础",{"key":27,"text":180,"correct":35},"独立基础",{"key":30,"text":182,"correct":22},"平板式",{"key":33,"text":184,"correct":35},"箱形基础","AD",{"id":187,"libraryId":5,"type":15,"typeLabel":16,"stem":188,"options":189,"answer":36,"analysis":37},1258870,"柱基定位和放线的主要内容包括（ ）。",[190,192,194,196,198],{"key":20,"text":191,"correct":22},"安置两台经纬仪，在两条互相垂直的柱列轴线控制桩上，延轴线方向交汇处各柱基的位置（即各列轴线的焦点），此项工作称为柱基定位",{"key":24,"text":193,"correct":22},"在柱基的四轴线上，打入四个定位小木桩a、b、c、d其桩位应在基础开挖边线以外，比基础深度大1.5倍的地方，作为修坑和立模的依据",{"key":27,"text":195,"correct":22},"按照基础详图所注尺寸和基坑放坡宽度，用特制角尺，放出基坑开挖边界线，并洒出白灰线以便开挖，此项工作称为基础放线",{"key":30,"text":197,"correct":22},"在进行柱基测设时，应注意柱列轴线不一定都是柱基的中心线，而一般立模、吊装等习惯用中心线，此时，应将柱列轴线平移，定出柱基中心线",{"key":33,"text":199,"correct":35},"用墨线弹出墙中线和墙边线",{"id":201,"libraryId":5,"type":15,"typeLabel":16,"stem":202,"options":203,"answer":126,"analysis":37},1258871,"建（构）筑物的每期变形观测结束后，在数据处理中若出现下列（ ）情形之一时，必须即刻通知建设单位和施工单位采取相应措施。",[204,206,208,210,212],{"key":20,"text":205,"correct":22},"变形量达到预警值或接近允许值",{"key":24,"text":207,"correct":35},"变形量缓慢增长但未达到预警值",{"key":27,"text":209,"correct":22},"建（构）筑物的裂缝或地表裂缝快速扩大",{"key":30,"text":211,"correct":22},"变形量出现异常变化",{"key":33,"text":213,"correct":35},"检测单位将测量数据遗失",{"id":215,"libraryId":5,"type":15,"typeLabel":16,"stem":216,"options":217,"answer":228,"analysis":37},1258872,"在多层建筑施工中，要由下层向上层传递高程，建筑物高层传递的常用方法有（ ）。",[218,220,222,224,226],{"key":20,"text":219,"correct":22},"利用皮数杆传递高程",{"key":24,"text":221,"correct":22},"吊钢尺法",{"key":27,"text":223,"correct":35},"水准仪",{"key":30,"text":225,"correct":35},"吊锤球法",{"key":33,"text":227,"correct":22},"利用钢尺直接丈量","ABE",{"id":230,"libraryId":5,"type":15,"typeLabel":16,"stem":231,"options":232,"answer":243,"analysis":37},1258873,"建筑物主体结构施工中，监测的主要内容包括建筑物的（ ）。",[233,235,237,239,241],{"key":20,"text":234,"correct":35},"水平位移观测",{"key":24,"text":236,"correct":22},"垂直位移观测",{"key":27,"text":238,"correct":22},"倾斜观测",{"key":30,"text":240,"correct":22},"挠度观测",{"key":33,"text":242,"correct":22},"裂缝观测","BCDE",{"id":245,"libraryId":5,"type":15,"typeLabel":16,"stem":246,"options":247,"answer":258,"analysis":37},1258874,"深基坑施工中变形观测的内容有（ ）。",[248,250,252,254,256],{"key":20,"text":249,"correct":22},"支护结构顶部的水平位移观测",{"key":24,"text":251,"correct":22},"临近建筑物的垂直位移、倾斜、裂缝观测",{"key":27,"text":253,"correct":22},"临近道路、地下管网设施的垂直位移、倾斜、裂缝观测",{"key":30,"text":255,"correct":22},"支护结构的垂直位移观测",{"key":33,"text":257,"correct":22},"支护结构倾斜观测","ABCDE",{"id":260,"libraryId":5,"type":15,"typeLabel":16,"stem":261,"options":262,"answer":273,"analysis":37},1258875,"下列关于施工测量特点的叙述，说法正确的有（ ）。",[263,265,267,269,271],{"key":20,"text":264,"correct":22},"低层建筑物的测设精度小于高层建筑物的测设精度",{"key":24,"text":266,"correct":35},"装配式建筑物的测设精度小于非装配式建筑物的测设精度",{"key":27,"text":268,"correct":22},"钢筋混凝土结构建筑物的测设精度小于钢结构建筑物的测设精度",{"key":30,"text":270,"correct":22},"道路工程的测设精度小于桥梁工程的测设精度",{"key":33,"text":272,"correct":22},"民用建筑物的测设精度小于工业建筑物的测设精度","ACDE",{"id":275,"libraryId":5,"type":15,"typeLabel":16,"stem":276,"options":277,"answer":288,"analysis":37},1258876,"为了便于检核和提高测量精度，施工场地高程控制网应布设成（ ）。",[278,280,282,284,286],{"key":20,"text":279,"correct":22},"闭合水准路线",{"key":24,"text":281,"correct":22},"附合水准路线",{"key":27,"text":283,"correct":35},"平面控制网",{"key":30,"text":285,"correct":35},"建筑方格网",{"key":33,"text":287,"correct":35},"三角网","AB",{"id":290,"libraryId":5,"type":15,"typeLabel":16,"stem":291,"options":292,"answer":111,"analysis":37},1258877,"根据场地地形条件和建筑物、构筑物的布置情况，施工平面控制网的建立方式可以采用（ ）。",[293,295,296,297,299],{"key":20,"text":294,"correct":22},"建筑基线",{"key":24,"text":287,"correct":22},{"key":27,"text":285,"correct":22},{"key":30,"text":298,"correct":35},"“一”字直线",{"key":33,"text":300,"correct":35},"“十”字交叉线",{"id":302,"libraryId":5,"type":15,"typeLabel":16,"stem":303,"options":304,"answer":36,"analysis":37},1258878,"确定施工顺序的基本要求包括（ ）。",[305,307,309,311,313],{"key":20,"text":306,"correct":22},"必须符合施工工艺的要求",{"key":24,"text":308,"correct":22},"必须与施工方法协调一致",{"key":27,"text":310,"correct":22},"必须考虑当地的气候条件",{"key":30,"text":312,"correct":22},"必须考虑安全施工的要求",{"key":33,"text":314,"correct":35},"必须考虑文明施工的要求",{"id":316,"libraryId":5,"type":15,"typeLabel":16,"stem":317,"options":318,"answer":67,"analysis":37},1258879,"关于框架结构工程钢筋混凝土预制桩沉桩顺序的说法，正确的有（ ）。",[319,321,323,325,327],{"key":20,"text":320,"correct":22},"当基坑不大时，打桩应逐排打设或从中间分头向四周或两边进行",{"key":24,"text":322,"correct":22},"对于密集桩群，从中间分头向四周或两边对称打设",{"key":27,"text":324,"correct":35},"当一侧毗邻建筑物时，由另一方向向毗邻建筑物施打",{"key":30,"text":326,"correct":22},"当基坑较大时，宜将基坑分为数段，然后在各段范围内分别施打",{"key":33,"text":328,"correct":35},"对于基础标高不一的桩，宜先浅后深",{"id":330,"libraryId":5,"type":15,"typeLabel":16,"stem":331,"options":332,"answer":36,"analysis":37},1258880,"多层及高层建筑钢结构的安装，必须考虑（ ）等影响因素，合理划分施工流水区段，确定安装顺序。",[333,335,337,339,341],{"key":20,"text":334,"correct":22},"建筑物的平面形状",{"key":24,"text":336,"correct":22},"结构形式",{"key":27,"text":338,"correct":22},"安装机械的位置",{"key":30,"text":340,"correct":22},"安装机械的数量",{"key":33,"text":342,"correct":35},"外加工钢结构厂的运距",{"id":344,"libraryId":5,"type":15,"typeLabel":16,"stem":345,"options":346,"answer":36,"analysis":37},1258881,"关于梁和板同时浇筑混凝土时施工技术的说法，正确的有（ ）。",[347,349,351,353,355],{"key":20,"text":348,"correct":22},"梁和板宜同时浇筑混凝土",{"key":24,"text":350,"correct":22},"单向板宜沿着板的长边方向浇筑",{"key":27,"text":352,"correct":22},"有主次梁的楼板宜顺着次梁方向浇筑",{"key":30,"text":354,"correct":22},"高度大于1m时的梁可单独浇筑混凝土",{"key":33,"text":356,"correct":35},"有主次梁的楼板宜顺着主梁方向浇筑",{"id":358,"libraryId":5,"type":15,"typeLabel":16,"stem":359,"options":360,"answer":156,"analysis":37},1258882,"多层混合结构民用房屋的施工，按照房屋结构各部位不同的施工特点，可分为（ ）。",[361,363,365,367,369],{"key":20,"text":362,"correct":35},"设备工程",{"key":24,"text":364,"correct":22},"基础工程",{"key":27,"text":366,"correct":22},"主体工程",{"key":30,"text":368,"correct":22},"屋面及装修工程",{"key":33,"text":370,"correct":35},"地面工程",{"id":372,"libraryId":5,"type":15,"typeLabel":16,"stem":373,"options":374,"answer":36,"analysis":37},1258883,"确定施工顺序应遵循的基本原则是（ ）。",[375,377,379,381,383],{"key":20,"text":376,"correct":22},"先地下，后地上",{"key":24,"text":378,"correct":22},"先主体，后围护",{"key":27,"text":380,"correct":22},"先结构，后装修",{"key":30,"text":382,"correct":22},"先土建，后设备",{"key":33,"text":384,"correct":35},"先围护，后主体",{"id":386,"libraryId":5,"type":15,"typeLabel":16,"stem":387,"options":388,"answer":399,"analysis":37},1258884,"框架结构工程模板的拆除顺序是（ ）。",[389,391,393,395,397],{"key":20,"text":390,"correct":35},"先支先拆，后支后拆",{"key":24,"text":392,"correct":22},"先支后拆，后支先拆",{"key":27,"text":394,"correct":22},"先拆非承重部分，再拆承重部分",{"key":30,"text":396,"correct":35},"先拆承重部分，后拆非承重部分",{"key":33,"text":398,"correct":35},"先下后上，先内后外","BC",{"id":401,"libraryId":5,"type":15,"typeLabel":16,"stem":402,"options":403,"answer":228,"analysis":37},1258885,"钢结构每个单元安装顺序以（ ）安装成框架为原则。",[404,406,408,410,412],{"key":20,"text":405,"correct":22},"主梁",{"key":24,"text":407,"correct":22},"主钢支撑",{"key":27,"text":409,"correct":35},"次梁",{"key":30,"text":411,"correct":35},"楼板",{"key":33,"text":413,"correct":22},"带状桁架",{"id":415,"libraryId":5,"type":15,"typeLabel":16,"stem":416,"options":417,"answer":428,"analysis":37},1258886,"编制建设工程施工总进度计划，主要用来确定如下哪几项工作（ ）。",[418,420,422,424,426],{"key":20,"text":419,"correct":35},"各单项工程或单位工程的工期定额",{"key":24,"text":421,"correct":35},"建设的要求工期和计算工期",{"key":27,"text":423,"correct":22},"各单项工程或工程的施工期限",{"key":30,"text":425,"correct":35},"各单项工程或单位工程的实物工程量",{"key":33,"text":427,"correct":22},"各单项工程或单位工程的相互搭接关系","CE",{"id":430,"libraryId":5,"type":15,"typeLabel":16,"stem":431,"options":432,"answer":67,"analysis":37},1258887,"流水施工作业中的基本参数有（ ）。",[433,435,437,439,441],{"key":20,"text":434,"correct":22},"工艺参数",{"key":24,"text":436,"correct":22},"时间参数",{"key":27,"text":438,"correct":35},"流水参数",{"key":30,"text":440,"correct":22},"空间参数",{"key":33,"text":442,"correct":35},"技术参数",{"id":444,"libraryId":5,"type":15,"typeLabel":16,"stem":445,"options":446,"answer":141,"analysis":37},1258888,"施工项目进度计划调整时，应考虑（ ）等限制条件，确保要求的进度目标得到实现。",[447,449,451,453,455],{"key":20,"text":448,"correct":22},"后续工作",{"key":24,"text":450,"correct":35},"项目经理部的管理力量",{"key":27,"text":452,"correct":22},"总工期",{"key":30,"text":454,"correct":35},"已完工作",{"key":33,"text":456,"correct":35},"安全管理要求",{"id":458,"libraryId":5,"type":15,"typeLabel":16,"stem":459,"options":460,"answer":36,"analysis":37},1258889,"工程项目资源管理内容主要包括（ ）。",[461,463,465,467,469],{"key":20,"text":462,"correct":22},"人力资源管理",{"key":24,"text":464,"correct":22},"材料管理",{"key":27,"text":466,"correct":22},"机械设备管理",{"key":30,"text":468,"correct":22},"技术管理和资金管理",{"key":33,"text":470,"correct":35},"环境管理",{"id":472,"libraryId":5,"type":15,"typeLabel":16,"stem":473,"options":474,"answer":52,"analysis":37},1258890,"施工进度计划的审核内容包括（ ）。",[475,477,479,481,483],{"key":20,"text":476,"correct":22},"施工进度计划是否符合承包合同中的工期要求",{"key":24,"text":478,"correct":22},"施工进度计划中的内容是否有遗漏，分期施工是否满足分批交工的需要和配套交工的要求",{"key":27,"text":480,"correct":35},"施工顺序安排是否符合施工程序的要求",{"key":30,"text":482,"correct":22},"资源供应计划应满足施工进度计划的需要",{"key":33,"text":484,"correct":22},"施工图设计的进度是否满足施工进度计划要求",{"id":486,"libraryId":5,"type":15,"typeLabel":16,"stem":487,"options":488,"answer":499,"analysis":37},1258891,"在双代号网络计划中，某项工作的最早完成时间是指其（ ）。",[489,491,493,495,497],{"key":20,"text":490,"correct":35},"开始节点的最早时间与工作总时差之和",{"key":24,"text":492,"correct":22},"开始节点的最早时间与工作持续时间之和",{"key":27,"text":494,"correct":35},"完成节点的最迟时间与工作持续时间之差",{"key":30,"text":496,"correct":22},"完成节点的最迟时间与工作总时差之差",{"key":33,"text":498,"correct":35},"完成节点的最迟时间与工作自由时差之差","BD",{"id":501,"libraryId":5,"type":15,"typeLabel":16,"stem":502,"options":503,"answer":243,"analysis":37},1258892,"资源配置计划包括（ ）等内容。",[504,506,508,510,512],{"key":20,"text":505,"correct":35},"临时设施计划",{"key":24,"text":507,"correct":22},"主要材料配置计划",{"key":27,"text":509,"correct":22},"施工机具配置计划",{"key":30,"text":511,"correct":22},"构配件配置计划",{"key":33,"text":513,"correct":22},"劳动力配置计划",{"id":515,"libraryId":5,"type":15,"typeLabel":16,"stem":516,"options":517,"answer":499,"analysis":37},1258893,"在建设工程施工过程中，加快施工进度的组织措施包括（ ）。",[518,520,522,524,526],{"key":20,"text":519,"correct":35},"采用先进的施工方法以减少施工过程的数量",{"key":24,"text":521,"correct":22},"增加工作面，组织更多的专业工作队",{"key":27,"text":523,"correct":35},"改善劳动条件和外部配合条件",{"key":30,"text":525,"correct":22},"增加劳动力和施工机械的数量",{"key":33,"text":527,"correct":35},"改进施工工艺并实施强有力的调度",{"id":529,"libraryId":5,"type":15,"typeLabel":16,"stem":530,"options":531,"answer":111,"analysis":37},1258894,"施工任务书是向班组下达任务，实行责任承包、全面管理和原始记录的综合性文件，它是计划和实施的纽带，其包括（ ）。",[532,534,536,538,540],{"key":20,"text":533,"correct":22},"施工任务单",{"key":24,"text":535,"correct":22},"限额领料单",{"key":27,"text":537,"correct":22},"考勤表",{"key":30,"text":539,"correct":35},"施工进度表",{"key":33,"text":541,"correct":35},"材料单",{"id":543,"libraryId":5,"type":15,"typeLabel":16,"stem":544,"options":545,"answer":555,"analysis":37},1258895,"当实际施工进度发生拖延时，为了加快施工进度而采取的组织措施可以是（ ）。",[546,548,550,552,554],{"key":20,"text":547,"correct":22},"增加工作面和每天的施工时间",{"key":24,"text":549,"correct":35},"改善劳动条件并实施强有力的调度",{"key":27,"text":551,"correct":35},"采用更先进的施工机械和施工方法",{"key":30,"text":553,"correct":35},"改进施工方法，减少施工过程的数量",{"key":33,"text":525,"correct":22},"AE",{"id":557,"libraryId":5,"type":15,"typeLabel":16,"stem":558,"options":559,"answer":399,"analysis":37},1258896,"在施工进度计划的调整过程中，压缩关键工作持续时间的技术措施有（ ）。",[560,561,563,565,567],{"key":20,"text":525,"correct":35},{"key":24,"text":562,"correct":22},"改进施工工艺和施工技术",{"key":27,"text":564,"correct":22},"采用更先进的施工机械",{"key":30,"text":566,"correct":35},"改善外部配合条件",{"key":33,"text":568,"correct":35},"采用工程分包方式",{"id":570,"libraryId":5,"type":15,"typeLabel":16,"stem":571,"options":572,"answer":583,"analysis":37},1258897,"施工进度计划编制依据包括（ ）。",[573,575,577,579,581],{"key":20,"text":574,"correct":22},"约束条件",{"key":24,"text":576,"correct":22},"工程的工期要求及开工、竣工日期",{"key":27,"text":578,"correct":22},"资源需求",{"key":30,"text":580,"correct":35},"施工方法",{"key":33,"text":582,"correct":22},"作业制度安排","ABCE",{"id":585,"libraryId":5,"type":15,"typeLabel":16,"stem":586,"options":587,"answer":111,"analysis":37},1258898,"建设工程竣工结算的编制依据有（ ）。",[588,590,592,594,596],{"key":20,"text":589,"correct":22},"工程合同",{"key":24,"text":591,"correct":22},"建设工程设计文件及相关资料",{"key":27,"text":593,"correct":22},"投标文件",{"key":30,"text":595,"correct":35},"招标文件",{"key":33,"text":597,"correct":35},"监理合同",{"id":599,"libraryId":5,"type":15,"typeLabel":16,"stem":600,"options":601,"answer":612,"analysis":37},1258899,"国家融资资金投资的工程建设项目包括（ ）。",[602,604,606,608,610],{"key":20,"text":603,"correct":35},"使用各级财政预算资金的项目",{"key":24,"text":605,"correct":22},"使用国家政策性贷款的项目",{"key":27,"text":607,"correct":22},"国家特许的融资项目",{"key":30,"text":609,"correct":35},"使用纳人财政管理的各种政府性专项建设资金的项目",{"key":33,"text":611,"correct":22},"使用国家发行债券所筹资金的项目","BCE",{"id":614,"libraryId":5,"type":15,"typeLabel":16,"stem":615,"options":616,"answer":67,"analysis":37},1258900,"结合背景材料，关于工程变更的价款调整方法，说法正确的有（ ）。",[617,619,621,623,625],{"key":20,"text":618,"correct":22},"已标价工程量清单中有适用于变更工程项目的，且工程变更导致的该清单项目的工程数量不足15％时，其单价不作调整",{"key":24,"text":620,"correct":22},"已标价工程量清单中没有适用也没有类似变更工程项目的，由承包人报价，发包人确认",{"key":27,"text":622,"correct":35},"安全文明施工费，按照实际发生的措施项目调整，可以浮动",{"key":30,"text":624,"correct":22},"对措施费的调整原则是，工程量增加的，措施项目费调增，否则调减",{"key":33,"text":626,"correct":35},"综合单价的调整方法，应由承发包双方当事人在合同通用条款中约定",{"id":628,"libraryId":5,"type":15,"typeLabel":16,"stem":629,"options":630,"answer":111,"analysis":37},1258901,"计日工是为了解决现场发生的零星工作的计价而设立的，在计日工表中应由招标人填写的项目有（ ）。",[631,633,635,637,639],{"key":20,"text":632,"correct":22},"项目名称",{"key":24,"text":634,"correct":22},"暂定数量",{"key":27,"text":636,"correct":22},"计量单位",{"key":30,"text":638,"correct":35},"实际数量",{"key":33,"text":640,"correct":35},"综合单价",{"id":642,"libraryId":5,"type":15,"typeLabel":16,"stem":643,"options":644,"answer":655,"analysis":37},1258902,"因发生不可抗力事件导致人员的伤亡、财产损失及其费用增加，发承包双方承担并调整合同价款的原则有（ ）。",[645,647,649,651,653],{"key":20,"text":646,"correct":35},"发包人、承包人人员伤亡由对方单位负责，并承担相应费用",{"key":24,"text":648,"correct":22},"承包人的施工机械设备损坏及停工损失，由承包人承担",{"key":27,"text":650,"correct":35},"停工期间，承包人应发包人要求留在施工现场的必要的管理人员及保卫人员的费用由承包人承担",{"key":30,"text":652,"correct":22},"工程所需清理、修复费用，由发包人承担",{"key":33,"text":654,"correct":22},"发包人要求承包人赶工的，承包人应采取赶工措施，赶工费用由发包人承担","BDE",{"id":657,"libraryId":5,"type":15,"typeLabel":16,"stem":658,"options":659,"answer":258,"analysis":37},1258903,"施工单位现场质量检查的内容有（ ）。",[660,662,664,666,668],{"key":20,"text":661,"correct":22},"成品保护检查",{"key":24,"text":663,"correct":22},"开工前检查",{"key":27,"text":665,"correct":22},"工序交接检查",{"key":30,"text":667,"correct":22},"停工后复工前的检查",{"key":33,"text":669,"correct":22},"隐蔽工程检查",{"id":671,"libraryId":5,"type":15,"typeLabel":16,"stem":672,"options":673,"answer":258,"analysis":37},1258904,"施工质量计划的内容一般包括（ ）。",[674,676,678,680,682],{"key":20,"text":675,"correct":22},"工程特点及施工条件分析",{"key":24,"text":677,"correct":22},"工程检测项目计划及方法",{"key":27,"text":679,"correct":22},"材料设备质量管理及控制措施",{"key":30,"text":681,"correct":22},"质量管理组织机构、人员及资源配置计划",{"key":33,"text":683,"correct":22},"为确保工程质量所采取的施工技术方案、施工程序",{"id":685,"libraryId":5,"type":15,"typeLabel":16,"stem":686,"options":687,"answer":583,"analysis":37},1258905,"质量管理体系中使用的文件有（ ）。",[688,690,692,694,696],{"key":20,"text":689,"correct":22},"质量手册",{"key":24,"text":691,"correct":22},"质量计划",{"key":27,"text":693,"correct":22},"程序文件",{"key":30,"text":695,"correct":35},"质量目标",{"key":33,"text":697,"correct":22},"记录",{"id":699,"libraryId":5,"type":15,"typeLabel":16,"stem":700,"options":701,"answer":273,"analysis":37},1258906,"施工现场实测法的手段可归纳为哪几个字（ ）。",[702,704,706,708,710],{"key":20,"text":703,"correct":22},"吊",{"key":24,"text":705,"correct":35},"看",{"key":27,"text":707,"correct":22},"靠",{"key":30,"text":709,"correct":22},"量",{"key":33,"text":711,"correct":22},"套",{"id":713,"libraryId":5,"type":15,"typeLabel":16,"stem":714,"options":715,"answer":243,"analysis":37},1258907,"施工现场目测法的手段可归纳为哪几个字（ ）。",[716,717,718,720,722],{"key":20,"text":703,"correct":35},{"key":24,"text":705,"correct":22},{"key":27,"text":719,"correct":22},"敲",{"key":30,"text":721,"correct":22},"摸",{"key":33,"text":723,"correct":22},"照",{"id":725,"libraryId":5,"type":15,"typeLabel":16,"stem":726,"options":727,"answer":36,"analysis":37},1258908,"施工安全技术措施应具有哪些特性（ ）。",[728,730,732,734,736],{"key":20,"text":729,"correct":22},"超前性",{"key":24,"text":731,"correct":22},"可靠性",{"key":27,"text":733,"correct":22},"针对性",{"key":30,"text":735,"correct":22},"可操作性",{"key":33,"text":153,"correct":35},[738,742,745,748,751,754],{"id":739,"name":740,"category":7,"favorite":741},1,"领导干部任职前廉政法规知识测试题",92,{"id":743,"name":744,"category":7,"favorite":739},595,"建筑结构与设备",{"id":746,"name":747,"category":7,"favorite":739},715,"招标采购专业知识与法律法规",{"id":749,"name":750,"category":7,"favorite":739},848,"市政方向-通用基础",{"id":752,"name":753,"category":7,"favorite":8},534,"BIM工程师",{"id":755,"name":753,"category":7,"favorite":8},535]