[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"lib-842-11":3},{"library":4,"page":9,"limit":10,"total":11,"questions":12,"related":735},{"id":5,"name":6,"category":7,"favorite":8},842,"(土建施工)专业管理实务 岗位知识","建筑工程",0,11,50,892,[13,38,53,67,82,97,112,127,141,156,171,186,197,212,227,241,255,269,283,298,312,326,341,355,370,384,398,412,426,439,453,467,481,495,509,523,537,551,565,579,593,607,621,635,649,664,679,693,707,721],{"id":14,"libraryId":5,"type":15,"typeLabel":16,"stem":17,"options":18,"answer":36,"analysis":37},1258809,2,"多选题","等节奏流水施工的特征是（ ）。",[19,23,26,29,33],{"key":20,"text":21,"correct":22},"A","各施工过程在各施工段上的流水节拍彼此相等",true,{"key":24,"text":25,"correct":22},"B","流水步距彼此相等，而且等于流水节拍值",{"key":27,"text":28,"correct":22},"C","各专业工作队在各施工段上能够连续作业，施工段之间没有空闲时间",{"key":30,"text":31,"correct":32},"D","施工班组数大于施工过程数",false,{"key":34,"text":35,"correct":22},"E","施工班组数等于施工过程数","ABCE","",{"id":39,"libraryId":5,"type":15,"typeLabel":16,"stem":40,"options":41,"answer":52,"analysis":37},1258810,"造成施工进度计划偏差的影响因素包括（ ）。",[42,44,46,48,50],{"key":20,"text":43,"correct":22},"设计的变更",{"key":24,"text":45,"correct":22},"工期及相关计划的失误",{"key":27,"text":47,"correct":22},"工程条件的变化",{"key":30,"text":49,"correct":22},"管理过程中的失误",{"key":34,"text":51,"correct":22},"实施方案的修改","ABCDE",{"id":54,"libraryId":5,"type":15,"typeLabel":16,"stem":55,"options":56,"answer":36,"analysis":37},1258811,"确定流水步距的基本要求是（ ）。",[57,59,61,63,65],{"key":20,"text":58,"correct":22},"主要施工队组连续施工的需要",{"key":24,"text":60,"correct":22},"施工工艺的要求",{"key":27,"text":62,"correct":22},"最大限度搭接的要求",{"key":30,"text":64,"correct":32},"工期要求",{"key":34,"text":66,"correct":22},"要满足保证工程质量、安全生产、成品保护的需要",{"id":68,"libraryId":5,"type":15,"typeLabel":16,"stem":69,"options":70,"answer":81,"analysis":37},1258812,"施工现场环境保护的相关规定有（ ）。",[71,73,75,77,79],{"key":20,"text":72,"correct":32},"控制污水排放",{"key":24,"text":74,"correct":22},"对施工现场防治扬尘、噪声、水污染及环境保护管理工作进行检查",{"key":27,"text":76,"correct":22},"定期对职工进行环保法规知识培训考核",{"key":30,"text":78,"correct":22},"建筑施工现场应建立环境保护体系，落实责任，保证有效运行",{"key":34,"text":80,"correct":22},"建筑工程施工组织设计中应有防治扬尘、噪声、固体废物和废水等污染环境的有效措施，并在施工作业中认真组织实施","BCDE",{"id":83,"libraryId":5,"type":15,"typeLabel":16,"stem":84,"options":85,"answer":96,"analysis":37},1258813,"施工现场存放油料、化学溶剂等应设专门的库房，必须对（ ）进行防渗处理。",[86,88,90,92,94],{"key":20,"text":87,"correct":22},"库房地面",{"key":24,"text":89,"correct":32},"高200mm的墙面",{"key":27,"text":91,"correct":32},"存放油料、化学溶剂的容器",{"key":30,"text":93,"correct":22},"高250mm的墙面",{"key":34,"text":95,"correct":32},"库房室外地面","AD",{"id":98,"libraryId":5,"type":15,"typeLabel":16,"stem":99,"options":100,"answer":111,"analysis":37},1258814,"施工过程中的“四口”应有防护措施。其中“四口”指的是（ ）。",[101,103,105,107,109],{"key":20,"text":102,"correct":22},"楼梯口",{"key":24,"text":104,"correct":22},"电梯口",{"key":27,"text":106,"correct":22},"通道口",{"key":30,"text":108,"correct":22},"预留洞口",{"key":34,"text":110,"correct":32},"门窗洞口","ABCD",{"id":113,"libraryId":5,"type":15,"typeLabel":16,"stem":114,"options":115,"answer":126,"analysis":37},1258815,"建筑工程施工安全事故按事故后果严重程度可分为（ ）。",[116,118,120,122,124],{"key":20,"text":117,"correct":22},"轻伤事故",{"key":24,"text":119,"correct":22},"死亡事故",{"key":27,"text":121,"correct":32},"重大事故",{"key":30,"text":123,"correct":32},"一般事故",{"key":34,"text":125,"correct":22},"急性中毒事故","ABE",{"id":128,"libraryId":5,"type":15,"typeLabel":16,"stem":129,"options":130,"answer":81,"analysis":37},1258816,"施工安全隐患的处理原则包括冗余安全度处理原则、单项隐患综合处理原则以及（ ）等。",[131,133,135,137,139],{"key":20,"text":132,"correct":32},"全面处理原则",{"key":24,"text":134,"correct":22},"直接隐患与间接隐患并治原则",{"key":27,"text":136,"correct":22},"预防与减灾并重处理原则",{"key":30,"text":138,"correct":22},"重点处理原则",{"key":34,"text":140,"correct":22},"动态处理原则",{"id":142,"libraryId":5,"type":15,"typeLabel":16,"stem":143,"options":144,"answer":155,"analysis":37},1258817,"在进行生产安全事故报告和调查处理时，必须坚持“四不放过”的原则，包括（ ）。",[145,147,149,151,153],{"key":20,"text":146,"correct":22},"事故原因不清楚不放过",{"key":24,"text":148,"correct":22},"事故责任者和员工没有受到教育不放过",{"key":27,"text":150,"correct":32},"事故单位未处理不放过",{"key":30,"text":152,"correct":22},"事故责任者没有处理不放过",{"key":34,"text":154,"correct":22},"没有制定防范措施不放过","ABDE",{"id":157,"libraryId":5,"type":15,"typeLabel":16,"stem":158,"options":159,"answer":170,"analysis":37},1258818,"文明施工是保持施工现场良好的（ ）。",[160,162,164,166,168],{"key":20,"text":161,"correct":22},"作业环境",{"key":24,"text":163,"correct":32},"工作环境",{"key":27,"text":165,"correct":22},"工作秩序",{"key":30,"text":167,"correct":32},"工作氛围",{"key":34,"text":169,"correct":22},"卫生环境","ACE",{"id":172,"libraryId":5,"type":15,"typeLabel":16,"stem":173,"options":174,"answer":185,"analysis":37},1258819,"根据《生产安全事故报告和调查处理条例》的规定，下列情况属于特别重大事故的有（ ）。",[175,177,179,181,183],{"key":20,"text":176,"correct":32},"造成20人以上死亡",{"key":24,"text":178,"correct":22},"造成30人以上死亡",{"key":27,"text":180,"correct":22},"造成100人以上重伤",{"key":30,"text":182,"correct":32},"造成直接经济损失5000万元以上",{"key":34,"text":184,"correct":22},"造成直接经济损失1亿元以上","BCE",{"id":187,"libraryId":5,"type":15,"typeLabel":16,"stem":188,"options":189,"answer":155,"analysis":37},1258820,"建筑工程施工安全事故按生产安全事故造成的人员伤亡或直接经济损失可分为（ ）。",[190,192,193,194,195],{"key":20,"text":191,"correct":22},"特别重大事故",{"key":24,"text":121,"correct":22},{"key":27,"text":119,"correct":32},{"key":30,"text":123,"correct":22},{"key":34,"text":196,"correct":22},"较大事故",{"id":198,"libraryId":5,"type":15,"typeLabel":16,"stem":199,"options":200,"answer":211,"analysis":37},1258821,"第二类危险源是指造成约束、限制能量和危险物质措施失控的各种不安全因素，其主要体现在（ ）。",[201,203,205,207,209],{"key":20,"text":202,"correct":22},"设备故障或缺陷",{"key":24,"text":204,"correct":32},"造成事故后果的严重程度",{"key":27,"text":206,"correct":22},"人为失误",{"key":30,"text":208,"correct":22},"管理缺陷",{"key":34,"text":210,"correct":22},"环境因素","ACDE",{"id":213,"libraryId":5,"type":15,"typeLabel":16,"stem":214,"options":215,"answer":226,"analysis":37},1258822,"施工现场的噪声按振动性质可分为（ ）。",[216,218,220,222,224],{"key":20,"text":217,"correct":32},"工业噪声",{"key":24,"text":219,"correct":32},"交通噪声",{"key":27,"text":221,"correct":22},"气体动力噪声",{"key":30,"text":223,"correct":22},"机械噪声",{"key":34,"text":225,"correct":22},"电磁性噪声","CDE",{"id":228,"libraryId":5,"type":15,"typeLabel":16,"stem":229,"options":230,"answer":52,"analysis":37},1258823,"文明施工是保持施工现场良好的作业环境、卫生环境和工作秩序。主要包括（ ）。",[231,233,235,237,239],{"key":20,"text":232,"correct":22},"规范施工现场的场容，保持作业环境的整洁卫生",{"key":24,"text":234,"correct":22},"科学组织施工，使生产有序进行",{"key":27,"text":236,"correct":22},"减少施工对周围居民和环境的影响",{"key":30,"text":238,"correct":22},"遵守施工现场文明施工的规定和要求",{"key":34,"text":240,"correct":22},"保证职工的安全和身体健康",{"id":242,"libraryId":5,"type":15,"typeLabel":16,"stem":243,"options":244,"answer":52,"analysis":37},1258824,"施工质量的影响因素有（ ）。",[245,247,249,251,253],{"key":20,"text":246,"correct":22},"环境控制",{"key":24,"text":248,"correct":22},"人的因素",{"key":27,"text":250,"correct":22},"材料的因素",{"key":30,"text":252,"correct":22},"方法的因素",{"key":34,"text":254,"correct":22},"设备的因素",{"id":256,"libraryId":5,"type":15,"typeLabel":16,"stem":257,"options":258,"answer":211,"analysis":37},1258825,"施工项目质量控制的基本程序划分为几个阶段，包括（ ）。",[259,261,263,265,267],{"key":20,"text":260,"correct":22},"计划控制",{"key":24,"text":262,"correct":32},"过程控制",{"key":27,"text":264,"correct":22},"监督检查阶段",{"key":30,"text":266,"correct":22},"报告偏差阶段",{"key":34,"text":268,"correct":22},"采取纠正行动阶段",{"id":270,"libraryId":5,"type":15,"typeLabel":16,"stem":271,"options":272,"answer":52,"analysis":37},1258826,"施工质量控制的原则有（ ）。",[273,275,277,279,281],{"key":20,"text":274,"correct":22},"坚持质量第一的原则",{"key":24,"text":276,"correct":22},"坚持以人为核心的原则",{"key":27,"text":278,"correct":22},"坚持以预防为主的原则",{"key":30,"text":280,"correct":22},"坚持质量标准的原则",{"key":34,"text":282,"correct":22},"坚持科学、公正、守法的道德原则",{"id":284,"libraryId":5,"type":15,"typeLabel":16,"stem":285,"options":286,"answer":297,"analysis":37},1258827,"施工质量控制应贯彻全面全过程质量管理的思想，运用动态控制原理，进行质量的（ ）。",[287,289,291,293,295],{"key":20,"text":288,"correct":22},"事前控制",{"key":24,"text":290,"correct":22},"事中控制",{"key":27,"text":292,"correct":22},"事后控制",{"key":30,"text":294,"correct":32},"全过程控制",{"key":34,"text":296,"correct":32},"监督控制","ABC",{"id":299,"libraryId":5,"type":15,"typeLabel":16,"stem":300,"options":301,"answer":36,"analysis":37},1258828,"建筑工程质量管理的特点有（ ）。",[302,304,306,308,310],{"key":20,"text":303,"correct":22},"影响质量的因素多",{"key":24,"text":305,"correct":22},"质量控制的难度大",{"key":27,"text":307,"correct":22},"终结检查的局限大",{"key":30,"text":309,"correct":32},"工作质量的不确定性",{"key":34,"text":311,"correct":22},"过程控制的要求高",{"id":313,"libraryId":5,"type":15,"typeLabel":16,"stem":314,"options":315,"answer":170,"analysis":37},1258829,"施工质量问题按问题责任分类可分为（ ）。",[316,318,320,322,324],{"key":20,"text":317,"correct":22},"指导责任",{"key":24,"text":319,"correct":32},"管理责任",{"key":27,"text":321,"correct":22},"操作责任",{"key":30,"text":323,"correct":32},"技术责任",{"key":34,"text":325,"correct":22},"自然灾害",{"id":327,"libraryId":5,"type":15,"typeLabel":16,"stem":328,"options":329,"answer":340,"analysis":37},1258830,"产生施工项目质量问题的原因很多，下列属于施工与管理不到位的是（ ）。",[330,332,334,336,338],{"key":20,"text":331,"correct":22},"未经设计单位同意擅自修改设计",{"key":24,"text":333,"correct":32},"未搞清工程地质情况仓促开工",{"key":27,"text":335,"correct":32},"水泥安定性不良",{"key":30,"text":337,"correct":32},"采用不正确的结构方案",{"key":34,"text":339,"correct":22},"施工方案考虑不周，施工顺序颠倒","AE",{"id":342,"libraryId":5,"type":15,"typeLabel":16,"stem":343,"options":344,"answer":297,"analysis":37},1258831,"检验批可根据施工、质量控制和专业验收的需要，按（ ）等进行划分。",[345,347,349,351,353],{"key":20,"text":346,"correct":22},"楼层",{"key":24,"text":348,"correct":22},"变形缝",{"key":27,"text":350,"correct":22},"施工段",{"key":30,"text":352,"correct":32},"工种",{"key":34,"text":354,"correct":32},"材料",{"id":356,"libraryId":5,"type":15,"typeLabel":16,"stem":357,"options":358,"answer":369,"analysis":37},1258832,"施工生产中计量控制的主要工作包括（ ）。",[359,361,363,365,367],{"key":20,"text":360,"correct":22},"投料计量",{"key":24,"text":362,"correct":22},"施工测量",{"key":27,"text":364,"correct":32},"施工机械设备数量计量",{"key":30,"text":366,"correct":22},"监测计量",{"key":34,"text":368,"correct":32},"施工人员数量计量","ABD",{"id":371,"libraryId":5,"type":15,"typeLabel":16,"stem":372,"options":373,"answer":81,"analysis":37},1258833,"施工质量控制的基本要求有（ ）。",[374,376,378,380,382],{"key":20,"text":375,"correct":32},"以科学组织管理确保工程质量",{"key":24,"text":377,"correct":22},"严格控制投入品的质量",{"key":27,"text":379,"correct":22},"严防系统性因素的质量变异",{"key":30,"text":381,"correct":22},"严把分项工程质量检验评定关",{"key":34,"text":383,"correct":22},"贯彻“以预防为主”的方针",{"id":385,"libraryId":5,"type":15,"typeLabel":16,"stem":386,"options":387,"answer":126,"analysis":37},1258834,"根据索赔事件的性质不同，可以将工程索赔分为（ ）。",[388,390,392,394,396],{"key":20,"text":389,"correct":22},"工程变更索赔",{"key":24,"text":391,"correct":22},"合同被迫终止索赔",{"key":27,"text":393,"correct":32},"合同中明示的索赔",{"key":30,"text":395,"correct":32},"工期索赔",{"key":34,"text":397,"correct":22},"不可抗力事件的索赔",{"id":399,"libraryId":5,"type":15,"typeLabel":16,"stem":400,"options":401,"answer":81,"analysis":37},1258835,"施工过程成本控制的措施包括（ ）。",[402,404,406,408,410],{"key":20,"text":403,"correct":32},"管理措施",{"key":24,"text":405,"correct":22},"技术措施",{"key":27,"text":407,"correct":22},"经济措施",{"key":30,"text":409,"correct":22},"合同措施",{"key":34,"text":411,"correct":22},"组织措施",{"id":413,"libraryId":5,"type":15,"typeLabel":16,"stem":414,"options":415,"answer":111,"analysis":37},1258836,"机械费用主要由台班数量和台班单价两方面决定，主要从（ ）方面控制台班费的有效支出。",[416,418,420,422,424],{"key":20,"text":417,"correct":22},"合理安排施工生产，加强设备租赁计划管理，减少因安排不当引起的设备闲置",{"key":24,"text":419,"correct":22},"加强机械设备的调度工作，尽量避免窝工，提高现场设备利用率",{"key":27,"text":421,"correct":22},"加强现场设备的维修保养，避免因不正当使用造成机械设备的停置",{"key":30,"text":423,"correct":22},"做好上机人员与辅助生产人员的协调与配合，提高机械台班产量",{"key":34,"text":425,"correct":32},"指定价格低廉的设备租赁单位，降低租赁费用",{"id":427,"libraryId":5,"type":15,"typeLabel":16,"stem":428,"options":429,"answer":52,"analysis":37},1258837,"施工成本的具体影响因素包括（ ）。",[430,431,433,435,437],{"key":20,"text":248,"correct":22},{"key":24,"text":432,"correct":22},"机械费用的控制",{"key":27,"text":434,"correct":22},"工程材料的控制",{"key":30,"text":436,"correct":22},"项目管理者的成本控制能力",{"key":34,"text":438,"correct":22},"科学合理的施工组织设计与施工技术水平",{"id":440,"libraryId":5,"type":15,"typeLabel":16,"stem":441,"options":442,"answer":155,"analysis":37},1258838,"建筑安装工程费由（ ）组成。",[443,445,447,449,451],{"key":20,"text":444,"correct":22},"直接费",{"key":24,"text":446,"correct":22},"间接费",{"key":27,"text":448,"correct":32},"企业管理费",{"key":30,"text":450,"correct":22},"利润",{"key":34,"text":452,"correct":22},"税金",{"id":454,"libraryId":5,"type":15,"typeLabel":16,"stem":455,"options":456,"answer":466,"analysis":37},1258839,"建筑安装工程费中，直接费包括（ ）。",[457,459,461,462,464],{"key":20,"text":458,"correct":22},"直接工程费",{"key":24,"text":460,"correct":22},"措施费",{"key":27,"text":448,"correct":32},{"key":30,"text":463,"correct":32},"间接工程费",{"key":34,"text":465,"correct":32},"规费","AB",{"id":468,"libraryId":5,"type":15,"typeLabel":16,"stem":469,"options":470,"answer":369,"analysis":37},1258840,"单位工程竣工成本分析的主要内容包括（ ）。",[471,473,475,477,479],{"key":20,"text":472,"correct":22},"竣工成本分析",{"key":24,"text":474,"correct":22},"主要资源节超对比分析",{"key":27,"text":476,"correct":32},"月（季）度成本分析",{"key":30,"text":478,"correct":22},"主要技术节约措施及经济效果分析",{"key":34,"text":480,"correct":32},"年度成本分析",{"id":482,"libraryId":5,"type":15,"typeLabel":16,"stem":483,"options":484,"answer":52,"analysis":37},1258841,"工程成本管理的特点包括（ ）。",[485,487,489,491,493],{"key":20,"text":486,"correct":22},"成本管理的全员性",{"key":24,"text":488,"correct":22},"成本管理的全面性",{"key":27,"text":490,"correct":22},"成本管理的目标性",{"key":30,"text":492,"correct":22},"成本管理的战略性",{"key":34,"text":494,"correct":22},"成本管理的系统性",{"id":496,"libraryId":5,"type":15,"typeLabel":16,"stem":497,"options":498,"answer":170,"analysis":37},1258842,"根据成本管理要求，工程项目成本的形式可划分为（ ）。",[499,501,503,505,507],{"key":20,"text":500,"correct":22},"承包成本",{"key":24,"text":502,"correct":32},"直接成本",{"key":27,"text":504,"correct":22},"计划成本",{"key":30,"text":506,"correct":32},"固定成本",{"key":34,"text":508,"correct":22},"实际成本",{"id":510,"libraryId":5,"type":15,"typeLabel":16,"stem":511,"options":512,"answer":211,"analysis":37},1258843,"塔式起重机的工作参数有（ ）。",[513,515,517,519,521],{"key":20,"text":514,"correct":22},"回转半径",{"key":24,"text":516,"correct":32},"起重半径",{"key":27,"text":518,"correct":22},"起升高度",{"key":30,"text":520,"correct":22},"起重力矩",{"key":34,"text":522,"correct":22},"起重量",{"id":524,"libraryId":5,"type":15,"typeLabel":16,"stem":525,"options":526,"answer":466,"analysis":37},1258844,"混凝土搅拌机按其搅拌原理分为（ ）。",[527,529,531,533,535],{"key":20,"text":528,"correct":22},"自落式搅拌机",{"key":24,"text":530,"correct":22},"强制式搅拌机",{"key":27,"text":532,"correct":32},"单卧轴搅拌机",{"key":30,"text":534,"correct":32},"双卧轴搅拌机",{"key":34,"text":536,"correct":32},"滚筒式搅拌机",{"id":538,"libraryId":5,"type":15,"typeLabel":16,"stem":539,"options":540,"answer":81,"analysis":37},1258845,"正铲挖土机作业的适用范围包括（ ）。",[541,543,545,547,549],{"key":20,"text":542,"correct":32},"开挖含水量大的一～三类的砂土或粘土",{"key":24,"text":544,"correct":22},"大型场地整平土方",{"key":27,"text":546,"correct":22},"工作面狭小且较深的大型管沟和基槽路堑",{"key":30,"text":548,"correct":22},"独立基坑",{"key":34,"text":550,"correct":22},"边坡开挖",{"id":552,"libraryId":5,"type":15,"typeLabel":16,"stem":553,"options":554,"answer":466,"analysis":37},1258846,"反铲挖掘机的挖土特点是：“后退向下，强制切土”。根据挖掘机的开挖路线与运输汽车的相对位置不同，一般有（ ）。",[555,557,559,561,563],{"key":20,"text":556,"correct":22},"沟端开挖法",{"key":24,"text":558,"correct":22},"沟侧开挖法",{"key":27,"text":560,"correct":32},"多层接力开挖法",{"key":30,"text":562,"correct":32},"多方位开挖法",{"key":34,"text":564,"correct":32},"沟底开挖法",{"id":566,"libraryId":5,"type":15,"typeLabel":16,"stem":567,"options":568,"answer":111,"analysis":37},1258847,"混凝土振动机械按其工作方式分为（ ）。",[569,571,573,575,577],{"key":20,"text":570,"correct":22},"内部振动器",{"key":24,"text":572,"correct":22},"表面振动器",{"key":27,"text":574,"correct":22},"外部振动器",{"key":30,"text":576,"correct":22},"振动台",{"key":34,"text":578,"correct":32},"全方位振动器",{"id":580,"libraryId":5,"type":15,"typeLabel":16,"stem":581,"options":582,"answer":111,"analysis":37},1258848,"施工升降机应设置专用开关箱，馈电容量应满足升降机直接启动的要求，生产厂家配置的电气箱内应安装的保护装置有（ ）。",[583,585,587,589,591],{"key":20,"text":584,"correct":22},"短路",{"key":24,"text":586,"correct":22},"过载",{"key":27,"text":588,"correct":22},"错相",{"key":30,"text":590,"correct":22},"断相",{"key":34,"text":592,"correct":32},"启动",{"id":594,"libraryId":5,"type":15,"typeLabel":16,"stem":595,"options":596,"answer":111,"analysis":37},1258849,"施工组织设计和专项施工方案的编制依据主要有（ ）。",[597,599,601,603,605],{"key":20,"text":598,"correct":22},"工程合同",{"key":24,"text":600,"correct":22},"施工图纸",{"key":27,"text":602,"correct":22},"技术图集",{"key":30,"text":604,"correct":22},"标准、规范",{"key":34,"text":606,"correct":32},"施工方法",{"id":608,"libraryId":5,"type":15,"typeLabel":16,"stem":609,"options":610,"answer":52,"analysis":37},1258850,"施工准备工作是单位工程资源准备的重要内容，包括（ ）。",[611,613,615,617,619],{"key":20,"text":612,"correct":22},"人员准备",{"key":24,"text":614,"correct":22},"机械设备准备",{"key":27,"text":616,"correct":22},"技术准备",{"key":30,"text":618,"correct":22},"施工现场准备",{"key":34,"text":620,"correct":22},"材料准备",{"id":622,"libraryId":5,"type":15,"typeLabel":16,"stem":623,"options":624,"answer":155,"analysis":37},1258851,"土钉支护的施工特点有（ ）。",[625,627,629,631,633],{"key":20,"text":626,"correct":22},"施工设备较简单",{"key":24,"text":628,"correct":22},"比用挡土桩锚杆施工简便",{"key":27,"text":630,"correct":32},"施工速度较慢",{"key":30,"text":632,"correct":22},"节省工期",{"key":34,"text":634,"correct":22},"造价较低",{"id":636,"libraryId":5,"type":15,"typeLabel":16,"stem":637,"options":638,"answer":52,"analysis":37},1258852,"施工现场管理的总体要求有（ ）。",[639,641,643,645,647],{"key":20,"text":640,"correct":22},"文明施工",{"key":24,"text":642,"correct":22},"安全有序",{"key":27,"text":644,"correct":22},"整洁卫生",{"key":30,"text":646,"correct":22},"现场入口处的醒目位置，应公示“五牌”、“二图”",{"key":34,"text":648,"correct":22},"项目经理部应经常巡视检查施工现场，认真听取各方意见和反映，及时抓好整改",{"id":650,"libraryId":5,"type":15,"typeLabel":16,"stem":651,"options":652,"answer":663,"analysis":37},1258853,"土钉支护的施工过程有（ ）。",[653,655,657,659,661],{"key":20,"text":654,"correct":22},"先锚后喷",{"key":24,"text":656,"correct":32},"边锚边喷",{"key":27,"text":658,"correct":22},"先喷后锚",{"key":30,"text":660,"correct":32},"先锚后浇",{"key":34,"text":662,"correct":32},"均可以","AC",{"id":665,"libraryId":5,"type":15,"typeLabel":16,"stem":666,"options":667,"answer":678,"analysis":37},1258854,"项目施工协调是单位工程施工部署的重要内容，其中包括（ ）。",[668,670,672,674,676],{"key":20,"text":669,"correct":22},"与建设单位的协调",{"key":24,"text":671,"correct":32},"与监理单位的协调",{"key":27,"text":673,"correct":22},"与监理工程师的协调",{"key":30,"text":675,"correct":22},"与设计单位的协调",{"key":34,"text":677,"correct":32},"与施工单位的协调","ACD",{"id":680,"libraryId":5,"type":15,"typeLabel":16,"stem":681,"options":682,"answer":36,"analysis":37},1258855,"施工管理目标是单位工程施工部署的重要内容，其中包括（ ）。",[683,685,687,689,691],{"key":20,"text":684,"correct":22},"质量目标",{"key":24,"text":686,"correct":22},"社会行为目标",{"key":27,"text":688,"correct":22},"工期目标",{"key":30,"text":690,"correct":32},"成本目标",{"key":34,"text":692,"correct":22},"安全生产文明施工目标",{"id":694,"libraryId":5,"type":15,"typeLabel":16,"stem":695,"options":696,"answer":52,"analysis":37},1258856,"施工现场入口处的醒目位置，应公示“五牌”、“二图”，其中“五牌”指的是（ ）。",[697,699,701,703,705],{"key":20,"text":698,"correct":22},"建设项目概况牌",{"key":24,"text":700,"correct":22},"安全纪律牌",{"key":27,"text":702,"correct":22},"防火须知牌",{"key":30,"text":704,"correct":22},"安全无重大事故牌",{"key":34,"text":706,"correct":22},"安全生产、文明施工牌",{"id":708,"libraryId":5,"type":15,"typeLabel":16,"stem":709,"options":710,"answer":126,"analysis":37},1258857,"建筑工程施工图的分类，按专业分工不同可分为（ ）。",[711,713,715,717,719],{"key":20,"text":712,"correct":22},"建筑施工图",{"key":24,"text":714,"correct":22},"结构施工图",{"key":27,"text":716,"correct":32},"给排水施工图",{"key":30,"text":718,"correct":32},"采暖通风施工图",{"key":34,"text":720,"correct":22},"设备施工图",{"id":722,"libraryId":5,"type":15,"typeLabel":16,"stem":723,"options":724,"answer":111,"analysis":37},1258858,"与轴心受压钢构件稳定系数有关的因素有（ ）。",[725,727,729,731,733],{"key":20,"text":726,"correct":22},"截面形状",{"key":24,"text":728,"correct":22},"钢号",{"key":27,"text":730,"correct":22},"两端约束情况",{"key":30,"text":732,"correct":22},"长细比",{"key":34,"text":734,"correct":32},"杆件的防腐材料",[736,740,743,746,749,752],{"id":737,"name":738,"category":7,"favorite":739},1,"领导干部任职前廉政法规知识测试题",92,{"id":741,"name":742,"category":7,"favorite":737},595,"建筑结构与设备",{"id":744,"name":745,"category":7,"favorite":737},715,"招标采购专业知识与法律法规",{"id":747,"name":748,"category":7,"favorite":737},848,"市政方向-通用基础",{"id":750,"name":751,"category":7,"favorite":8},534,"BIM工程师",{"id":753,"name":751,"category":7,"favorite":8},535]