[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"lib-842-10":3},{"library":4,"page":9,"limit":10,"total":11,"questions":12,"related":650},{"id":5,"name":6,"category":7,"favorite":8},842,"(土建施工)专业管理实务 岗位知识","建筑工程",0,10,50,892,[13,34,46,55,67,79,91,103,115,127,139,151,163,175,187,199,211,223,235,247,259,271,283,293,305,317,329,341,353,365,377,389,400,411,421,432,444,456,474,489,504,519,533,548,562,576,590,605,620,635],{"id":14,"libraryId":5,"type":15,"typeLabel":16,"stem":17,"options":18,"answer":20,"analysis":33},1258759,1,"单选题","下列危险性较大的分部分项工程中，其专项施工方案需进行专家论证的是（ ）。",[19,23,27,30],{"key":20,"text":21,"correct":22},"A","开挖深度超过4m，但地质条件、周围环境和地下管线复杂的土方开挖工程",true,{"key":24,"text":25,"correct":26},"B","开挖深度为4m的土方开挖工程",false,{"key":28,"text":29,"correct":26},"C","基坑上口标高为-1.5m，基底标高分别为-3m、-4m、-5m的基坑支护工程",{"key":31,"text":32,"correct":26},"D","桩顶标高为-1.5m，底标高为-15m的人工挖孔灌注桩工程","",{"id":35,"libraryId":5,"type":15,"typeLabel":16,"stem":36,"options":37,"answer":31,"analysis":33},1258760,"建筑工程质量验收的程序和组织中指出，单位工程完工后，（ ）应自行组织有关人员进行检查评定，并向建设单位提交工程验收报告。",[38,40,42,44],{"key":20,"text":39,"correct":26},"建设单位",{"key":24,"text":41,"correct":26},"监理工程师",{"key":28,"text":43,"correct":26},"总监理工程师",{"key":31,"text":45,"correct":22},"施工单位",{"id":47,"libraryId":5,"type":15,"typeLabel":16,"stem":48,"options":49,"answer":24,"analysis":33},1258761,"建筑工程质量验收的程序和组织中指出，检验批及分项工程应由（ ）组织施工单位项目专业质量负责人等进行验收。",[50,51,52,53],{"key":20,"text":39,"correct":26},{"key":24,"text":41,"correct":22},{"key":28,"text":43,"correct":26},{"key":31,"text":54,"correct":26},"监理员",{"id":56,"libraryId":5,"type":15,"typeLabel":16,"stem":57,"options":58,"answer":20,"analysis":33},1258762,"当在使用中对水泥质量有怀疑或水泥出厂超过三个月（快硬硅酸盐水泥超过一个月）时，应对水泥进行复验，并（ ）使用。",[59,61,63,65],{"key":20,"text":60,"correct":22},"按复验结果",{"key":24,"text":62,"correct":26},"按原强度等级",{"key":28,"text":64,"correct":26},"应降低一级",{"key":31,"text":66,"correct":26},"按检验结果降低一级",{"id":68,"libraryId":5,"type":15,"typeLabel":16,"stem":69,"options":70,"answer":31,"analysis":33},1258763,"保温砌块砌筑的墙体，应采用（ ）砌筑。",[71,73,75,77],{"key":20,"text":72,"correct":26},"水泥砂浆",{"key":24,"text":74,"correct":26},"混合砂浆",{"key":28,"text":76,"correct":26},"高强度水泥砂浆",{"key":31,"text":78,"correct":22},"具有保温功能的砂浆",{"id":80,"libraryId":5,"type":15,"typeLabel":16,"stem":81,"options":82,"answer":31,"analysis":33},1258764,"在正常情况下，屋面防水工程的最低保修期限为（ ）年。",[83,85,87,89],{"key":20,"text":84,"correct":26},"2",{"key":24,"text":86,"correct":26},"3",{"key":28,"text":88,"correct":26},"4",{"key":31,"text":90,"correct":22},"5",{"id":92,"libraryId":5,"type":15,"typeLabel":16,"stem":93,"options":94,"answer":20,"analysis":33},1258765,"根据《建筑法》的规定，以下属于建筑工程保修范围的是（ ）。",[95,97,99,101],{"key":20,"text":96,"correct":22},"供热供冷系统工程",{"key":24,"text":98,"correct":26},"因使用不当造成的质量缺陷",{"key":28,"text":100,"correct":26},"因第三方造成的质量缺陷",{"key":31,"text":102,"correct":26},"不可抗力造成的质量缺陷",{"id":104,"libraryId":5,"type":15,"typeLabel":16,"stem":105,"options":106,"answer":20,"analysis":33},1258766,"根据《建设工程安全生产管理条例》规定，施工单位应当向作业人员提供安全防护用具和安全防护服装，并书面告知危险岗位操作的（ ）和违章操作的危害。",[107,109,111,113],{"key":20,"text":108,"correct":22},"操作规程",{"key":24,"text":110,"correct":26},"使用要领",{"key":28,"text":112,"correct":26},"使用方法",{"key":31,"text":114,"correct":26},"作业条件",{"id":116,"libraryId":5,"type":15,"typeLabel":16,"stem":117,"options":118,"answer":24,"analysis":33},1258767,"落地式钢管脚手架工程搭设高度超过（ ）m时，应当编制专项施工方案。",[119,121,123,125],{"key":20,"text":120,"correct":26},"20",{"key":24,"text":122,"correct":22},"24",{"key":28,"text":124,"correct":26},"30",{"key":31,"text":126,"correct":26},"50",{"id":128,"libraryId":5,"type":15,"typeLabel":16,"stem":129,"options":130,"answer":20,"analysis":33},1258768,"根据《中华人民共和国安全生产法》规定，生产经营单位与从业人员订立协议，免除或减轻其对从业人员因生产安全事故伤亡依法应承担的责任，该协议（ ）。",[131,133,135,137],{"key":20,"text":132,"correct":22},"无效",{"key":24,"text":134,"correct":26},"有效",{"key":28,"text":136,"correct":26},"经备案后生效",{"key":31,"text":138,"correct":26},"是否生效待定",{"id":140,"libraryId":5,"type":15,"typeLabel":16,"stem":141,"options":142,"answer":20,"analysis":33},1258769,"不需专家论证的危险性较大分部分项工程专项施工方案，其审批流程为（ ）。",[143,145,147,149],{"key":20,"text":144,"correct":22},"施工单位技术部门组织专业人员审核→施工单位技术负责人签字→总监理工程师审核签字",{"key":24,"text":146,"correct":26},"施工单位技术负责人组织专业人员审核→施工单位技术负责人签字→总监理工程师审核签字",{"key":28,"text":148,"correct":26},"专业承包单位技术负责人组织专业人员审核→专业承包单位技术负责人签字→总监理工程师审核签字",{"key":31,"text":150,"correct":26},"施工单位技术负责人组织专业人员审核→施工单位技术负责人签字→业主项目负责人或总监理工程师审核签字",{"id":152,"libraryId":5,"type":15,"typeLabel":16,"stem":153,"options":154,"answer":28,"analysis":33},1258770,"对水泥土搅拌复合地基、高压喷射注浆桩复合地基等，其承载力检验，数量为总数的（ ），但不应少于（ ）处。",[155,157,159,161],{"key":20,"text":156,"correct":26},"0.5%～1%，2",{"key":24,"text":158,"correct":26},"0.3%～1%，3",{"key":28,"text":160,"correct":22},"0.5%～1%，3",{"key":31,"text":162,"correct":26},"0.3%～1%，2",{"id":164,"libraryId":5,"type":15,"typeLabel":16,"stem":165,"options":166,"answer":31,"analysis":33},1258771,"搭设跨度在（ ）m及以上，施工总荷载在（ ）kN\u002F㎡及以上的混凝土模板支撑工程属于危险性较大的分部分项工程。",[167,169,171,173],{"key":20,"text":168,"correct":26},"5，7",{"key":24,"text":170,"correct":26},"6，8",{"key":28,"text":172,"correct":26},"5，10",{"key":31,"text":174,"correct":22},"10，10",{"id":176,"libraryId":5,"type":15,"typeLabel":16,"stem":177,"options":178,"answer":31,"analysis":33},1258772,"根据《安全生产法》规定，安全生产中从业人员的义务不包括（ ）。",[179,181,183,185],{"key":20,"text":180,"correct":26},"遵章守规",{"key":24,"text":182,"correct":26},"掌握安全知识、技能的义务",{"key":28,"text":184,"correct":26},"安全隐患及时报告",{"key":31,"text":186,"correct":22},"紧急处理安全事故",{"id":188,"libraryId":5,"type":15,"typeLabel":16,"stem":189,"options":190,"answer":24,"analysis":33},1258773,"下列属于超过一定规模危险性较大的分部分项工程的是（ ）。",[191,193,195,197],{"key":20,"text":192,"correct":26},"开挖深度超过3m的土方开挖工程",{"key":24,"text":194,"correct":22},"搭设高度为10m的混凝土模板支撑工程",{"key":28,"text":196,"correct":26},"搭设高度为48m的落地式钢管脚手架工程",{"key":31,"text":198,"correct":26},"搭设跨度为12m的混凝土模板支撑工程",{"id":200,"libraryId":5,"type":15,"typeLabel":16,"stem":201,"options":202,"answer":28,"analysis":33},1258774,"砌体施工时，楼面和屋面堆载不得超过楼板的（ ）。当施工层进料口处施工荷载较大时，楼板下宜采取临时支撑措施。",[203,205,207,209],{"key":20,"text":204,"correct":26},"标准荷载",{"key":24,"text":206,"correct":26},"活荷载",{"key":28,"text":208,"correct":22},"允许荷载值",{"key":31,"text":210,"correct":26},"自重",{"id":212,"libraryId":5,"type":15,"typeLabel":16,"stem":213,"options":214,"answer":28,"analysis":33},1258775,"（ ）对安全技术措施、专项施工方案和安全技术交底做出了明确的规定。",[215,217,219,221],{"key":20,"text":216,"correct":26},"《建筑法》",{"key":24,"text":218,"correct":26},"《安全生产法》",{"key":28,"text":220,"correct":22},"《建设工程安全生产管理条例》",{"key":31,"text":222,"correct":26},"《安全生产事故报告和调查处理条例》",{"id":224,"libraryId":5,"type":15,"typeLabel":16,"stem":225,"options":226,"answer":31,"analysis":33},1258776,"根据房屋建筑工程质量保修制度的规定，正常使用条件下，下列关于最低保修期限说法错误的是（ ）。",[227,229,231,233],{"key":20,"text":228,"correct":26},"地基基础工程和主体结构工程，为设计文件规定的该工程的合理使用年限",{"key":24,"text":230,"correct":26},"屋面防水工程、有防水要求的卫生间、房间和外墙面的防渗漏，为5年",{"key":28,"text":232,"correct":26},"供热与供冷系统，为2个采暖期、供冷期",{"key":31,"text":234,"correct":22},"电气管线、给排水管道、设备安装为3年",{"id":236,"libraryId":5,"type":15,"typeLabel":16,"stem":237,"options":238,"answer":24,"analysis":33},1258777,"在正常使用条件下，房屋建筑工程中供热与供冷系统的最低保修期限为（ ）。",[239,241,243,245],{"key":20,"text":240,"correct":26},"1个采暖期、供冷期",{"key":24,"text":242,"correct":22},"2个采暖期、供冷期",{"key":28,"text":244,"correct":26},"3个采暖期、供冷期",{"key":31,"text":246,"correct":26},"4个采暖期、供冷期",{"id":248,"libraryId":5,"type":15,"typeLabel":16,"stem":249,"options":250,"answer":31,"analysis":33},1258778,"通过返修或加固处理仍不能满足安全使用要求的钢结构分部工程（ ）。",[251,253,255,257],{"key":20,"text":252,"correct":26},"应予以验收",{"key":24,"text":254,"correct":26},"可予以验收",{"key":28,"text":256,"correct":26},"按协商文件进行验收",{"key":31,"text":258,"correct":22},"严禁验收",{"id":260,"libraryId":5,"type":15,"typeLabel":16,"stem":261,"options":262,"answer":20,"analysis":33},1258779,"混凝土结构子分部工程可根据结构的施工方法分为现浇混凝土结构子分部工程和（ ）。",[263,265,267,269],{"key":20,"text":264,"correct":22},"装配式混凝土结构子分部工程",{"key":24,"text":266,"correct":26},"钢筋混凝土子分部工程",{"key":28,"text":268,"correct":26},"预应力混凝土结构子分部工程",{"key":31,"text":270,"correct":26},"预制混凝土结构子分部工程",{"id":272,"libraryId":5,"type":15,"typeLabel":16,"stem":273,"options":274,"answer":24,"analysis":33},1258780,"对于有抗震要求的框架结构纵向受力钢筋进行试验，钢筋的抗拉强度实测值与屈服强度实测值的比值不应小于（ ）。",[275,277,279,281],{"key":20,"text":276,"correct":26},"1",{"key":24,"text":278,"correct":22},"1.25",{"key":28,"text":280,"correct":26},"1.4",{"key":31,"text":282,"correct":26},"1.5",{"id":284,"libraryId":5,"type":15,"typeLabel":16,"stem":285,"options":286,"answer":31,"analysis":33},1258781,"钢结构焊接工程施工质量验收要求，碳素结构钢应在焊缝冷却到环境温度、低合金结构钢应在完成焊接（ ）h以后，进行焊缝探伤检验。",[287,289,291,292],{"key":20,"text":288,"correct":26},"12",{"key":24,"text":290,"correct":26},"15",{"key":28,"text":120,"correct":26},{"key":31,"text":122,"correct":22},{"id":294,"libraryId":5,"type":15,"typeLabel":16,"stem":295,"options":296,"answer":24,"analysis":33},1258782,"开工前工程质量监督站核查施工现场参建各方主体及（ ）。",[297,299,301,303],{"key":20,"text":298,"correct":26},"参建人员的数量",{"key":24,"text":300,"correct":22},"有关人员的资格或资质",{"key":28,"text":302,"correct":26},"施工单位管理人员的数量",{"key":31,"text":304,"correct":26},"质量员的业绩",{"id":306,"libraryId":5,"type":15,"typeLabel":16,"stem":307,"options":308,"answer":31,"analysis":33},1258783,"某公司一次性购进一批散装水泥，按要求进行见证取样试验，见证取样每一批量不得超过（ ）t。",[309,311,313,315],{"key":20,"text":310,"correct":26},"60",{"key":24,"text":312,"correct":26},"100",{"key":28,"text":314,"correct":26},"200",{"key":31,"text":316,"correct":22},"500",{"id":318,"libraryId":5,"type":15,"typeLabel":16,"stem":319,"options":320,"answer":20,"analysis":33},1258784,"某建筑工程地基采用强夯地基，根据地基施工质量验收的要求，其竣工后的结果必须达到设计要求的标准，对于该地基检验数量的说法中，以下错误的是（ ）。",[321,323,325,327],{"key":20,"text":322,"correct":22},"每单位工程不应少于4点",{"key":24,"text":324,"correct":26},"1000㎡以上工程，每100㎡至少应有1点",{"key":28,"text":326,"correct":26},"3000㎡以上工程，每300㎡至少应有1点",{"key":31,"text":328,"correct":26},"每一独立基础下至少应有1点，基槽每20延米应有1点",{"id":330,"libraryId":5,"type":15,"typeLabel":16,"stem":331,"options":332,"answer":28,"analysis":33},1258785,"高强度大六角头螺栓连接副终拧完成（ ）应进行终拧扭矩检查。",[333,335,337,339],{"key":20,"text":334,"correct":26},"1h后立即",{"key":24,"text":336,"correct":26},"1h后、24h内",{"key":28,"text":338,"correct":22},"1h后、48内",{"key":31,"text":340,"correct":26},"2h后、48h内",{"id":342,"libraryId":5,"type":15,"typeLabel":16,"stem":343,"options":344,"answer":28,"analysis":33},1258786,"压实系数采用环刀抽样时，取样点应位于每层（ ）的深度处。",[345,347,349,351],{"key":20,"text":346,"correct":26},"1\u002F3",{"key":24,"text":348,"correct":26},"1\u002F2",{"key":28,"text":350,"correct":22},"2\u002F3",{"key":31,"text":352,"correct":26},"3\u002F4",{"id":354,"libraryId":5,"type":15,"typeLabel":16,"stem":355,"options":356,"answer":24,"analysis":33},1258787,"参加危险跬较大的分部分项工程专项方案论证的专家组，应至少由（ ）专家组成。",[357,359,361,363],{"key":20,"text":358,"correct":26},"3名",{"key":24,"text":360,"correct":22},"5名",{"key":28,"text":362,"correct":26},"7名",{"key":31,"text":364,"correct":26},"10名以上",{"id":366,"libraryId":5,"type":15,"typeLabel":16,"stem":367,"options":368,"answer":24,"analysis":33},1258788,"检测机构资质按照其承担的检测业务内容分为专项检测机构资质和（ ）。",[369,371,373,375],{"key":20,"text":370,"correct":26},"全面检测机构资质",{"key":24,"text":372,"correct":22},"见证取样检测机构资质",{"key":28,"text":374,"correct":26},"公正检测机构资质",{"key":31,"text":376,"correct":26},"安全检测机构资质",{"id":378,"libraryId":5,"type":15,"typeLabel":16,"stem":379,"options":380,"answer":20,"analysis":33},1258789,"专项施工方案实施前，编制人员或（ ）应当向现场管理人员和作业人员进行安全技术交底。",[381,383,385,387],{"key":20,"text":382,"correct":22},"项目技术负责人",{"key":24,"text":384,"correct":26},"工程技术人员",{"key":28,"text":386,"correct":26},"主要负责人",{"key":31,"text":388,"correct":26},"专职人员",{"id":390,"libraryId":5,"type":15,"typeLabel":16,"stem":391,"options":392,"answer":20,"analysis":33},1258790,"地基基础工程是分部工程，如有必要，根据现行国家标准（ ）规定，可再划分若干个子分部工程。",[393,395,396,398],{"key":20,"text":394,"correct":22},"《建筑工程施工质量验收统一标准》",{"key":24,"text":220,"correct":26},{"key":28,"text":397,"correct":26},"《建设工程质量管理条例》",{"key":31,"text":399,"correct":26},"《实施工程建设强制性标准监督规定》",{"id":401,"libraryId":5,"type":15,"typeLabel":16,"stem":402,"options":403,"answer":28,"analysis":33},1258791,"填充墙砌体工程中，填充墙砌至接近梁、板底时，应留一定空隙，等填充墙砌筑完并至少间隔（ ）天后，再将其补砌挤紧。",[404,406,408,410],{"key":20,"text":405,"correct":26},"7",{"key":24,"text":407,"correct":26},"10",{"key":28,"text":409,"correct":22},"14",{"key":31,"text":290,"correct":26},{"id":412,"libraryId":5,"type":15,"typeLabel":16,"stem":413,"options":414,"answer":20,"analysis":33},1258792,"单位工程质量验收合格后，（ ）应在规定时间内将工程竣工验收报告和有关文件，报建设行政管理部门备案。",[415,416,417,419],{"key":20,"text":39,"correct":22},{"key":24,"text":45,"correct":26},{"key":28,"text":418,"correct":26},"设计单位",{"key":31,"text":420,"correct":26},"质量监督机构",{"id":422,"libraryId":5,"type":15,"typeLabel":16,"stem":423,"options":424,"answer":20,"analysis":33},1258793,"下列属于危险性较大的分部分项工程的是（ ）。",[425,426,428,430],{"key":20,"text":192,"correct":22},{"key":24,"text":427,"correct":26},"搭设高度为4m的模板支撑工程",{"key":28,"text":429,"correct":26},"搭设高度22m的落地式钢管脚手架工程",{"key":31,"text":431,"correct":26},"搭设跨度为9m的模板支撑工程",{"id":433,"libraryId":5,"type":15,"typeLabel":16,"stem":434,"options":435,"answer":28,"analysis":33},1258794,"当从业人员发现直接危及人身安全的紧急情况时，有权停止作业或在采取可能的应急措施后撤离作业场所，这里的权是指（ ）。",[436,438,440,442],{"key":20,"text":437,"correct":26},"拒绝权",{"key":24,"text":439,"correct":26},"批评权和检举、控告权",{"key":28,"text":441,"correct":22},"紧急撤离权",{"key":31,"text":443,"correct":26},"自我保护权",{"id":445,"libraryId":5,"type":15,"typeLabel":16,"stem":446,"options":447,"answer":28,"analysis":33},1258795,"当检查砌体砂浆饱满度时，用（ ）检查砖底面与砂浆的粘结痕迹面积，每处检测3块砖，取其平均值。",[448,450,452,454],{"key":20,"text":449,"correct":26},"钢尺",{"key":24,"text":451,"correct":26},"直尺",{"key":28,"text":453,"correct":22},"百格网",{"key":31,"text":455,"correct":26},"卷尺",{"id":457,"libraryId":5,"type":458,"typeLabel":459,"stem":460,"options":461,"answer":473,"analysis":33},1258796,2,"多选题","关于流水施工进度计划的描述，正确的有（）。",[462,464,466,468,470],{"key":20,"text":463,"correct":26},"A按施工工艺顺序分施工过程、不分施工段绘制",{"key":24,"text":465,"correct":26},"B按施工组织顺序不分施工过程、分施工段绘制",{"key":28,"text":467,"correct":22},"C按施工顺序分施工过程、分施工段绘制",{"key":31,"text":469,"correct":22},"D各专业队在各施工段均应连续施工",{"key":471,"text":472,"correct":22},"E","E相邻专业队投人流水施工应实现最大搭接","CDE",{"id":475,"libraryId":5,"type":458,"typeLabel":459,"stem":476,"options":477,"answer":488,"analysis":33},1258797,"确定流水节拍的方法有（ ）。",[478,480,482,484,486],{"key":20,"text":479,"correct":22},"定额计算法",{"key":24,"text":481,"correct":22},"经验估算法",{"key":28,"text":483,"correct":22},"工期计算法",{"key":31,"text":485,"correct":26},"图上分析计算法",{"key":471,"text":487,"correct":26},"累加数列法","ABC",{"id":490,"libraryId":5,"type":458,"typeLabel":459,"stem":491,"options":492,"answer":503,"analysis":33},1258798,"工程实际进度偏差影响到总工期时，可采用（ ）等方法调整进度计划。",[493,495,497,499,501],{"key":20,"text":494,"correct":22},"将顺序施工改为搭接施工",{"key":24,"text":496,"correct":22},"将部分任务转移",{"key":28,"text":498,"correct":22},"增加劳动力，提高劳动效率",{"key":31,"text":500,"correct":22},"增加资源投人",{"key":471,"text":502,"correct":26},"将平行作业改为顺序作业","ABCD",{"id":505,"libraryId":5,"type":458,"typeLabel":459,"stem":506,"options":507,"answer":518,"analysis":33},1258799,"控制性施工进度计划的作用主要包括（ ）。",[508,510,512,514,516],{"key":20,"text":509,"correct":22},"论证施工总进度计划",{"key":24,"text":511,"correct":22},"分解施工总进度计划",{"key":28,"text":513,"correct":22},"是编制实施性进度计划的依据",{"key":31,"text":515,"correct":22},"是施工进度动态控制的依据",{"key":471,"text":517,"correct":22},"是编制与该项目相关的其他各种进度计划的依据或参考","ABCDE",{"id":520,"libraryId":5,"type":458,"typeLabel":459,"stem":521,"options":522,"answer":473,"analysis":33},1258800,"网络计划的分类按网络计划层次可分为（ ）。",[523,525,527,529,531],{"key":20,"text":524,"correct":26},"时标网络计划",{"key":24,"text":526,"correct":26},"多目标网络计划",{"key":28,"text":528,"correct":22},"局部网络计划",{"key":31,"text":530,"correct":22},"综合网络计划",{"key":471,"text":532,"correct":22},"单位工程网络计划",{"id":534,"libraryId":5,"type":458,"typeLabel":459,"stem":535,"options":536,"answer":547,"analysis":33},1258801,"双代号网络图绘制时应遵循的规则有（ ）。",[537,539,541,543,545],{"key":20,"text":538,"correct":26},"双代号网络图中，严禁箭线交叉",{"key":24,"text":540,"correct":22},"双代号网络图中，应只有一个起点节点",{"key":28,"text":542,"correct":22},"双代号网络图中，不允许出现循环线路",{"key":31,"text":544,"correct":22},"双代号网络图中，必须只有一个终点节点",{"key":471,"text":546,"correct":22},"双代号网络图中，严禁出现无箭头节点的箭线","BCDE",{"id":549,"libraryId":5,"type":458,"typeLabel":459,"stem":550,"options":551,"answer":518,"analysis":33},1258802,"组织流水施工的要点有（ ）。",[552,554,556,558,560],{"key":20,"text":553,"correct":22},"主要施工过程必须连续、均衡地施工",{"key":24,"text":555,"correct":22},"划分分部分项工程",{"key":28,"text":557,"correct":22},"不同施工过程尽可能组织平行搭接施工",{"key":31,"text":559,"correct":22},"划分施工段",{"key":471,"text":561,"correct":22},"每个施工工程组织独立的施工队组",{"id":563,"libraryId":5,"type":458,"typeLabel":459,"stem":564,"options":565,"answer":547,"analysis":33},1258803,"施工进度计划的编制依据主要包括（ ）。",[566,568,570,572,574],{"key":20,"text":567,"correct":26},"项目可行性研究报告",{"key":24,"text":569,"correct":22},"经过审批的全套施工图及各种采用的标准图和技术资料",{"key":28,"text":571,"correct":22},"工程的工期要求及开工、竣工日期",{"key":31,"text":573,"correct":22},"工程项目工作顺序及相互间的逻辑关系",{"key":471,"text":575,"correct":22},"项目工作的提前和滞后要求",{"id":577,"libraryId":5,"type":458,"typeLabel":459,"stem":578,"options":579,"answer":488,"analysis":33},1258804,"下列说法正确的是（ ）。",[580,582,584,586,588],{"key":20,"text":581,"correct":22},"总时差为最小的工作为关键工作",{"key":24,"text":583,"correct":22},"自始至终全部由关键工作组成的线路为关键线路",{"key":28,"text":585,"correct":22},"线路上总的工作持续时间最长的线路为关键线路",{"key":31,"text":587,"correct":26},"自由时差为最小的工作为关键工作",{"key":471,"text":589,"correct":26},"时标网络计划中波形线水平投影长度为总时差",{"id":591,"libraryId":5,"type":458,"typeLabel":459,"stem":592,"options":593,"answer":604,"analysis":33},1258805,"网络图中，按节点和箭线所代表的含义不同，可分为（ ）。",[594,596,598,600,602],{"key":20,"text":595,"correct":22},"单代号网络图",{"key":24,"text":597,"correct":26},"多代号网络图",{"key":28,"text":599,"correct":26},"时标网络图",{"key":31,"text":601,"correct":22},"双代号网络图",{"key":471,"text":603,"correct":26},"非时标网络图","AD",{"id":606,"libraryId":5,"type":458,"typeLabel":459,"stem":607,"options":608,"answer":619,"analysis":33},1258806,"当工程施工的实际进度与计划进度不符时，需要对网络计划作出调整，调整的内容有（ ）。",[609,611,613,615,617],{"key":20,"text":610,"correct":22},"调整关键线路的长度",{"key":24,"text":612,"correct":22},"调整非关键工作时差",{"key":28,"text":614,"correct":22},"增减工作项目",{"key":31,"text":616,"correct":26},"调整组织结构",{"key":471,"text":618,"correct":22},"调整资源的投人","ABCE",{"id":621,"libraryId":5,"type":458,"typeLabel":459,"stem":622,"options":623,"answer":634,"analysis":33},1258807,"工程项目施工进度计划按编制对象可分为（ ）。",[624,626,628,630,632],{"key":20,"text":625,"correct":22},"施工总进度计划",{"key":24,"text":627,"correct":26},"控制性施工进度计划",{"key":28,"text":629,"correct":22},"单位工程施工进度计划",{"key":31,"text":631,"correct":22},"分部分项（专项）工程施工进度计划",{"key":471,"text":633,"correct":26},"实施性施工进度计划","ACD",{"id":636,"libraryId":5,"type":458,"typeLabel":459,"stem":637,"options":638,"answer":649,"analysis":33},1258808,"建设工程无节奏流水施工的特点包括（ ）。",[639,641,643,645,647],{"key":20,"text":640,"correct":26},"各专业工作队不能在施工段上连续作业",{"key":24,"text":642,"correct":22},"各施工过程在各施工段的流水节拍不全相等",{"key":28,"text":644,"correct":22},"相邻专业工作队的流水步距不尽相等",{"key":31,"text":646,"correct":26},"专业工作队数小于施工过程数",{"key":471,"text":648,"correct":22},"有些施工段之间可能有空闲时间","BCE",[651,654,657,660,663,666],{"id":15,"name":652,"category":7,"favorite":653},"领导干部任职前廉政法规知识测试题",92,{"id":655,"name":656,"category":7,"favorite":15},595,"建筑结构与设备",{"id":658,"name":659,"category":7,"favorite":15},715,"招标采购专业知识与法律法规",{"id":661,"name":662,"category":7,"favorite":15},848,"市政方向-通用基础",{"id":664,"name":665,"category":7,"favorite":8},534,"BIM工程师",{"id":667,"name":665,"category":7,"favorite":8},535]