[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"lib-842-1":3},{"library":4,"page":9,"limit":10,"total":11,"questions":12,"related":596},{"id":5,"name":6,"category":7,"favorite":8},842,"(土建施工)专业管理实务 岗位知识","建筑工程",0,1,50,892,[13,33,45,57,69,81,93,105,117,129,141,153,165,177,189,201,213,225,236,248,260,272,284,295,305,317,326,338,350,362,371,383,395,407,419,431,441,451,463,475,487,499,511,523,535,547,556,564,572,584],{"id":14,"libraryId":5,"type":9,"typeLabel":15,"stem":16,"options":17,"answer":19,"analysis":32},1258306,"单选题","确定流水步距的累加数列法计算过程可概括为（ ）。",[18,22,26,29],{"key":19,"text":20,"correct":21},"A","累加数列错位相减取大差",true,{"key":23,"text":24,"correct":25},"B","累计数列错位相减取小差",false,{"key":27,"text":28,"correct":25},"C","累加出列错位相加取大和",{"key":30,"text":31,"correct":25},"D","累计数列错位相加取小和","",{"id":34,"libraryId":5,"type":9,"typeLabel":15,"stem":35,"options":36,"answer":27,"analysis":32},1258307,"双代号网络图中，虚箭线表示（ ）。",[37,39,41,43],{"key":19,"text":38,"correct":25},"工作的持续时间",{"key":23,"text":40,"correct":25},"资源的消耗",{"key":27,"text":42,"correct":21},"工作之间的逻辑关系",{"key":30,"text":44,"correct":25},"非关键工作",{"id":46,"libraryId":5,"type":9,"typeLabel":15,"stem":47,"options":48,"answer":30,"analysis":32},1258308,"在组织流水施工时，划分施工过程不需考虑的因素是（ ）。",[49,51,53,55],{"key":19,"text":50,"correct":25},"施工方案及工程结构",{"key":23,"text":52,"correct":25},"劳动组织及劳动量大小",{"key":27,"text":54,"correct":25},"施工过程内容和工作范围",{"key":30,"text":56,"correct":21},"项目管理能力的强弱",{"id":58,"libraryId":5,"type":9,"typeLabel":15,"stem":59,"options":60,"answer":27,"analysis":32},1258309,"下列哪一项不是流水施工的基本参数（ ）。",[61,63,65,67],{"key":19,"text":62,"correct":25},"工艺参数",{"key":23,"text":64,"correct":25},"时间参数",{"key":27,"text":66,"correct":21},"结构参数",{"key":30,"text":68,"correct":25},"空间参数",{"id":70,"libraryId":5,"type":9,"typeLabel":15,"stem":71,"options":72,"answer":27,"analysis":32},1258310,"下列施工过程中，必须划人流水施工过程的是（ ）。",[73,75,77,79],{"key":19,"text":74,"correct":25},"加工厂生产各种预制构件",{"key":23,"text":76,"correct":25},"各种材料及构件、配件、半成品的运输",{"key":27,"text":78,"correct":21},"直接在工程对象上操作的施工过程",{"key":30,"text":80,"correct":25},"大型施工机具安置及脚手架搭设",{"id":82,"libraryId":5,"type":9,"typeLabel":15,"stem":83,"options":84,"answer":30,"analysis":32},1258311,"等步距异节拍流水施工的特征不包括（ ）。",[85,87,89,91],{"key":19,"text":86,"correct":25},"同一施工过程流水节拍相等，不同施工过程流水节拍等于其中最小流水节拍的整数倍",{"key":23,"text":88,"correct":25},"流水步距彼此相等，且等于最小流水节拍值",{"key":27,"text":90,"correct":25},"施工队组数大于施工过程数",{"key":30,"text":92,"correct":21},"施工班组数等于施工过程数",{"id":94,"libraryId":5,"type":9,"typeLabel":15,"stem":95,"options":96,"answer":19,"analysis":32},1258312,"（ ）是指将在项目实施中检查实际进度收集的信息，经整理后直接用横道线并标于原计划的横道线处，进行直观比较的方法。",[97,99,101,103],{"key":19,"text":98,"correct":21},"横道图比较法",{"key":23,"text":100,"correct":25},"S型曲线比较法",{"key":27,"text":102,"correct":25},"香蕉型曲线比较法",{"key":30,"text":104,"correct":25},"前锋线法",{"id":106,"libraryId":5,"type":9,"typeLabel":15,"stem":107,"options":108,"answer":19,"analysis":32},1258313,"关于无节奏流水施工的特点，说法错误的是（ ）。",[109,111,113,115],{"key":19,"text":110,"correct":21},"所有施工过程在各施工段上的流水节拍均相等",{"key":23,"text":112,"correct":25},"各施工过程的流水节拍不等且无规律",{"key":27,"text":114,"correct":25},"专业工作队数目等于施工过程数",{"key":30,"text":116,"correct":25},"各施工过程间的流水步距一般不等",{"id":118,"libraryId":5,"type":9,"typeLabel":15,"stem":119,"options":120,"answer":23,"analysis":32},1258314,"施工进度计划跟踪检查通常可以确定每月、半月、旬或周进行一次。若在施工中遇到天气、资源供应等不利因素的严重影响，检查间隔时间可临时（ ）。",[121,123,125,127],{"key":19,"text":122,"correct":25},"增长",{"key":23,"text":124,"correct":21},"缩短",{"key":27,"text":126,"correct":25},"不变",{"key":30,"text":128,"correct":25},"不能确定",{"id":130,"libraryId":5,"type":9,"typeLabel":15,"stem":131,"options":132,"answer":27,"analysis":32},1258315,"关于采用增减工作范围方法调整施工进度计划，下列说法错误的是（ ）。",[133,135,137,139],{"key":19,"text":134,"correct":25},"不得打乱原计划的逻辑关系",{"key":23,"text":136,"correct":25},"应重新计算时间参数",{"key":27,"text":138,"correct":21},"局部逻辑关系不能调整",{"key":30,"text":140,"correct":25},"应考虑对原网络计划的影响",{"id":142,"libraryId":5,"type":9,"typeLabel":15,"stem":143,"options":144,"answer":19,"analysis":32},1258316,"一般来说，一个网络图中至少有（ ）条关键线路。关键线路也不是一成不变的，在一定的条件下，关键线路和非关键线路会相互转化。",[145,147,149,151],{"key":19,"text":146,"correct":21},"1",{"key":23,"text":148,"correct":25},"2",{"key":27,"text":150,"correct":25},"3",{"key":30,"text":152,"correct":25},"4",{"id":154,"libraryId":5,"type":9,"typeLabel":15,"stem":155,"options":156,"answer":23,"analysis":32},1258317,"下列关于双代号网络图的绘制规则的说法中，错误的是（ ）。",[157,159,161,163],{"key":19,"text":158,"correct":25},"双代号网络图必须正确表达逻辑关系",{"key":23,"text":160,"correct":21},"网络图中允许出现循环线路",{"key":27,"text":162,"correct":25},"网络图中不允许出现代号相同的箭线",{"key":30,"text":164,"correct":25},"严禁在网络图中出现没有箭尾节点的箭线和没有箭头节点的箭线",{"id":166,"libraryId":5,"type":9,"typeLabel":15,"stem":167,"options":168,"answer":19,"analysis":32},1258318,"分析进度计划偏差影响时，若工作的进度偏差大于该工作的总时差，则此偏差（ ）。",[169,171,173,175],{"key":19,"text":170,"correct":21},"对后续工作和总工期都有影响",{"key":23,"text":172,"correct":25},"对后续工作有影响，对总工期无影响",{"key":27,"text":174,"correct":25},"对后续工作无影响，对总工期有影响",{"key":30,"text":176,"correct":25},"对后续工作和总工期都无影响",{"id":178,"libraryId":5,"type":9,"typeLabel":15,"stem":179,"options":180,"answer":27,"analysis":32},1258319,"绘制施工进度计划横道图时，首先应确定（ ）。",[181,183,185,187],{"key":19,"text":182,"correct":25},"流水方式",{"key":23,"text":184,"correct":25},"搭接方法",{"key":27,"text":186,"correct":21},"主导施工过程",{"key":30,"text":188,"correct":25},"流水节拍",{"id":190,"libraryId":5,"type":9,"typeLabel":15,"stem":191,"options":192,"answer":27,"analysis":32},1258320,"砌砖墙留斜槎时，斜槎长度不应小于高度（ ）。",[193,195,197,199],{"key":19,"text":194,"correct":25},"1\u002F2",{"key":23,"text":196,"correct":25},"1\u002F3",{"key":27,"text":198,"correct":21},"2\u002F3",{"key":30,"text":200,"correct":25},"3\u002F5",{"id":202,"libraryId":5,"type":9,"typeLabel":15,"stem":203,"options":204,"answer":19,"analysis":32},1258321,"工程项目流水作业是由固定组织的工人，在若干（ ）的施工区域中依次连续工作的一种施工组织方法。",[205,207,209,211],{"key":19,"text":206,"correct":21},"工作性质相同",{"key":23,"text":208,"correct":25},"工作性质不同",{"key":27,"text":210,"correct":25},"工作时间相同",{"key":30,"text":212,"correct":25},"工作时间不同",{"id":214,"libraryId":5,"type":9,"typeLabel":15,"stem":215,"options":216,"answer":30,"analysis":32},1258322,"某工程计划中A工作的持续时间为5天，总时差为8天，自由时差为4天。如果A工作实际进度拖延13天，则会影响工程计划工期（ ）天。",[217,219,221,223],{"key":19,"text":218,"correct":25},"13",{"key":23,"text":220,"correct":25},"8",{"key":27,"text":222,"correct":25},"9",{"key":30,"text":224,"correct":21},"5",{"id":226,"libraryId":5,"type":9,"typeLabel":15,"stem":227,"options":228,"answer":19,"analysis":32},1258323,"等节奏流水是指同一施工过程在各施工段上的（ ）都相等的一种流水施工方式。",[229,230,232,234],{"key":19,"text":188,"correct":21},{"key":23,"text":231,"correct":25},"流水强度",{"key":27,"text":233,"correct":25},"搭接时间",{"key":30,"text":235,"correct":25},"流水步距",{"id":237,"libraryId":5,"type":9,"typeLabel":15,"stem":238,"options":239,"answer":19,"analysis":32},1258324,"在拟建工程任务紧迫、工作面允许以及资源保证供应的条件下，可以组织（ ）。",[240,242,244,246],{"key":19,"text":241,"correct":21},"平行施工",{"key":23,"text":243,"correct":25},"顺序施工",{"key":27,"text":245,"correct":25},"流水施工",{"key":30,"text":247,"correct":25},"依次施工",{"id":249,"libraryId":5,"type":9,"typeLabel":15,"stem":250,"options":251,"answer":19,"analysis":32},1258325,"适用于工程规模小、建筑结构比较简单、施工过程不多的房屋或某些构筑物的流水施工方式是（ ）。",[252,254,256,258],{"key":19,"text":253,"correct":21},"等节奏流水",{"key":23,"text":255,"correct":25},"异步距异节拍流水",{"key":27,"text":257,"correct":25},"等步距异节拍流水",{"key":30,"text":259,"correct":25},"无节奏流水",{"id":261,"libraryId":5,"type":9,"typeLabel":15,"stem":262,"options":263,"answer":27,"analysis":32},1258326,"组织流水施工时，施工队组数大于施工过程数的流水方式是（）。",[264,266,268,270],{"key":19,"text":265,"correct":25},"A等节奏流水",{"key":23,"text":267,"correct":25},"B异步距异节奏流水",{"key":27,"text":269,"correct":21},"C等步距异节奏流水",{"key":30,"text":271,"correct":25},"D无节奏流水",{"id":273,"libraryId":5,"type":9,"typeLabel":15,"stem":274,"options":275,"answer":27,"analysis":32},1258327,"某基础工程划分4个施工过程（挖基槽、垫层施工、混凝土浇筑、回填土），每个施工过程分为5个施工段，流水节拍均为3d，要求在混凝土浇筑2d后才能进行回填土施工，该工程的流水施工工期为（ ）d。",[276,278,280,282],{"key":19,"text":277,"correct":25},"39",{"key":23,"text":279,"correct":25},"29",{"key":27,"text":281,"correct":21},"26",{"key":30,"text":283,"correct":25},"14",{"id":285,"libraryId":5,"type":9,"typeLabel":15,"stem":286,"options":287,"answer":23,"analysis":32},1258328,"组织流水施工时，空间参数不包括（ ）。",[288,290,291,293],{"key":19,"text":289,"correct":25},"施工层数",{"key":23,"text":235,"correct":21},{"key":27,"text":292,"correct":25},"工作面",{"key":30,"text":294,"correct":25},"施工段数",{"id":296,"libraryId":5,"type":9,"typeLabel":15,"stem":297,"options":298,"answer":19,"analysis":32},1258329,"某基础混凝土浇筑需劳动量为1200个工日，划分为劳动量相等的3个施工段组织流水施工，每天采用两班制，每段投人的人工数为40个工日，其流水节拍值为（ ）d。",[299,300,301,303],{"key":19,"text":224,"correct":21},{"key":23,"text":220,"correct":25},{"key":27,"text":302,"correct":25},"10",{"key":30,"text":304,"correct":25},"15",{"id":306,"libraryId":5,"type":9,"typeLabel":15,"stem":307,"options":308,"answer":27,"analysis":32},1258330,"关于控制性施工进度计划作用的说法，错误的是（ ）。",[309,311,313,315],{"key":19,"text":310,"correct":25},"论证施工总进度计划目标",{"key":23,"text":312,"correct":25},"分解施工总进度目标",{"key":27,"text":314,"correct":21},"不能作为施工进度动态控制的依据",{"key":30,"text":316,"correct":25},"编制实施性进度计划的依据",{"id":318,"libraryId":5,"type":9,"typeLabel":15,"stem":319,"options":320,"answer":27,"analysis":32},1258331,"每个专业工作队在各个施工段上完成其专业施工过程所必需的持续时间是指（ ）。",[321,322,324,325],{"key":19,"text":231,"correct":25},{"key":23,"text":323,"correct":25},"时间定额",{"key":27,"text":188,"correct":21},{"key":30,"text":235,"correct":25},{"id":327,"libraryId":5,"type":9,"typeLabel":15,"stem":328,"options":329,"answer":30,"analysis":32},1258332,"横道图进度计划中的横道线，不能结合时间坐标来表示项目各项工作之间的（ ）。",[330,332,334,336],{"key":19,"text":331,"correct":25},"开始时间",{"key":23,"text":333,"correct":25},"持续时间",{"key":27,"text":335,"correct":25},"先后顺序",{"key":30,"text":337,"correct":21},"资源消耗情况",{"id":339,"libraryId":5,"type":9,"typeLabel":15,"stem":340,"options":341,"answer":30,"analysis":32},1258333,"下列哪一种方法不是确定施工过程持续时间的方法（ ）。",[342,344,346,348],{"key":19,"text":343,"correct":25},"经验估算法",{"key":23,"text":345,"correct":25},"定额计算法",{"key":27,"text":347,"correct":25},"倒排计划法",{"key":30,"text":349,"correct":21},"目标计算法",{"id":351,"libraryId":5,"type":9,"typeLabel":15,"stem":352,"options":353,"answer":27,"analysis":32},1258334,"下列属于建设工程流水施工特点的是（ ）。",[354,356,358,360],{"key":19,"text":355,"correct":25},"由一个专业队在各施工段上依次施工",{"key":23,"text":357,"correct":25},"同一时间只能有一个专业队投人流水施工",{"key":27,"text":359,"correct":21},"同一施工过程的施工队组保持连续均衡施工",{"key":30,"text":361,"correct":25},"施工现场组织管理简单，工期最短",{"id":363,"libraryId":5,"type":9,"typeLabel":15,"stem":364,"options":365,"answer":23,"analysis":32},1258335,"流水施工的空间参数包括工作面、施工层数和（ ）。",[366,368,369,370],{"key":19,"text":367,"correct":25},"施工工期",{"key":23,"text":294,"correct":21},{"key":27,"text":188,"correct":25},{"key":30,"text":235,"correct":25},{"id":372,"libraryId":5,"type":9,"typeLabel":15,"stem":373,"options":374,"answer":30,"analysis":32},1258336,"虚工作起的作用不包括（ ）。",[375,377,379,381],{"key":19,"text":376,"correct":25},"联系",{"key":23,"text":378,"correct":25},"区分",{"key":27,"text":380,"correct":25},"断路",{"key":30,"text":382,"correct":21},"选择",{"id":384,"libraryId":5,"type":9,"typeLabel":15,"stem":385,"options":386,"answer":30,"analysis":32},1258337,"编制施工进度计划的工具不包括（ ）。",[387,389,391,393],{"key":19,"text":388,"correct":25},"横道计划",{"key":23,"text":390,"correct":25},"网络计划",{"key":27,"text":392,"correct":25},"里程碑计划",{"key":30,"text":394,"correct":21},"时标计划",{"id":396,"libraryId":5,"type":9,"typeLabel":15,"stem":397,"options":398,"answer":23,"analysis":32},1258338,"组织流水施工时，由建筑材料或现浇构件工艺性质决定的间歇时间称为（ ）。",[399,401,403,405],{"key":19,"text":400,"correct":25},"客观间歇",{"key":23,"text":402,"correct":21},"技术间歇",{"key":27,"text":404,"correct":25},"组织间歇",{"key":30,"text":406,"correct":25},"强制间歇",{"id":408,"libraryId":5,"type":9,"typeLabel":15,"stem":409,"options":410,"answer":30,"analysis":32},1258339,"组织流水施工时，划分施工段的最根本目的是（ ）。",[411,413,415,417],{"key":19,"text":412,"correct":25},"由于施工工艺的要求",{"key":23,"text":414,"correct":25},"可增加更多的专业工作队",{"key":27,"text":416,"correct":25},"提供工艺或组织间歇时间",{"key":30,"text":418,"correct":21},"各专业队在不同施工段进行流水施工",{"id":420,"libraryId":5,"type":9,"typeLabel":15,"stem":421,"options":422,"answer":19,"analysis":32},1258340,"施工进度计划在编制时，工程量计算应注意很多事项，其中不包括（ ）。",[423,425,427,429],{"key":19,"text":424,"correct":21},"划分的施工段数",{"key":23,"text":426,"correct":25},"工程量的计量单位",{"key":27,"text":428,"correct":25},"采用的施工方法",{"key":30,"text":430,"correct":25},"正确取用计价文件中的工程量",{"id":432,"libraryId":5,"type":9,"typeLabel":15,"stem":433,"options":434,"answer":19,"analysis":32},1258341,"最理想的流水组织形式是（ ）。",[435,436,438,439],{"key":19,"text":253,"correct":21},{"key":23,"text":437,"correct":25},"异节奏流水",{"key":27,"text":259,"correct":25},{"key":30,"text":440,"correct":25},"依次流水",{"id":442,"libraryId":5,"type":9,"typeLabel":15,"stem":443,"options":444,"answer":30,"analysis":32},1258342,"组织流水施工时，时间参数不包括（ ）。",[445,446,447,449],{"key":19,"text":188,"correct":25},{"key":23,"text":235,"correct":25},{"key":27,"text":448,"correct":25},"工期",{"key":30,"text":450,"correct":21},"施工段",{"id":452,"libraryId":5,"type":9,"typeLabel":15,"stem":453,"options":454,"answer":19,"analysis":32},1258343,"流水步距是指两个相邻施工过程的班组相继进人同一施工段开始施工的（ ）。",[455,457,459,461],{"key":19,"text":456,"correct":21},"最小时间间隔",{"key":23,"text":458,"correct":25},"最小持续时间",{"key":27,"text":460,"correct":25},"最大时间间隔",{"key":30,"text":462,"correct":25},"最大持续时间",{"id":464,"libraryId":5,"type":9,"typeLabel":15,"stem":465,"options":466,"answer":23,"analysis":32},1258344,"保持施工现场良好的作业环境、卫生环境和工作秩序，此项工作是（ ）的范畴。",[467,469,471,473],{"key":19,"text":468,"correct":25},"安全管理",{"key":23,"text":470,"correct":21},"文明施工",{"key":27,"text":472,"correct":25},"环境保护",{"key":30,"text":474,"correct":25},"消防管理",{"id":476,"libraryId":5,"type":9,"typeLabel":15,"stem":477,"options":478,"answer":19,"analysis":32},1258345,"关于危险源的定义，说法正确的是（ ）。",[479,481,483,485],{"key":19,"text":480,"correct":21},"可能导致人身伤害或疾病、财产损失、工作环境破坏或这些情况组合的危险因素。",{"key":23,"text":482,"correct":25},"火灾、水灾等各种可能伤害人身或使环境遭受破坏的因素",{"key":27,"text":484,"correct":25},"除直接自然灾害外的一切对人身体有伤害的一切有害因素",{"key":30,"text":486,"correct":25},"一种危害物品，这种物品可能导致人身破坏或疾病",{"id":488,"libraryId":5,"type":9,"typeLabel":15,"stem":489,"options":490,"answer":19,"analysis":32},1258346,"根据《建设工程安全生产管理条例》规定，（ ）单位应当遵守有关环境保护法律、法规的规定，在施工现场采取措施，防止或减少粉尘、废气、固体废物、噪声、振动和施工照明对人和环境的危害和污染。",[491,493,495,497],{"key":19,"text":492,"correct":21},"施工",{"key":23,"text":494,"correct":25},"建设",{"key":27,"text":496,"correct":25},"监理",{"key":30,"text":498,"correct":25},"设计",{"id":500,"libraryId":5,"type":9,"typeLabel":15,"stem":501,"options":502,"answer":23,"analysis":32},1258347,"施工过程中的“四口”应有防护措施。如楼梯、通道口应设置（ ）m高的防护栏杆并加装安全立网，预留孔洞应加盖等。",[503,505,507,509],{"key":19,"text":504,"correct":25},"0.9",{"key":23,"text":506,"correct":21},"1.2",{"key":27,"text":508,"correct":25},"1.0",{"key":30,"text":510,"correct":25},"1.5",{"id":512,"libraryId":5,"type":9,"typeLabel":15,"stem":513,"options":514,"answer":30,"analysis":32},1258348,"一般工程施工安全危险源的防范重点主要考虑的内容不包括（ ）。",[515,517,519,521],{"key":19,"text":516,"correct":25},"季节性施工的安全措施",{"key":23,"text":518,"correct":25},"施工过程中的“四口”的防护措施",{"key":27,"text":520,"correct":25},"“临边”防护措施",{"key":30,"text":522,"correct":21},"基坑施工的安全措施",{"id":524,"libraryId":5,"type":9,"typeLabel":15,"stem":525,"options":526,"answer":30,"analysis":32},1258349,"企业进行生产活动时，必须编制安全措施计划，其编写步骤为（ ）。",[527,529,531,533],{"key":19,"text":528,"correct":25},"危险源识别→工作活动分类→风险确定→风险评价→制定安全技术措施计划→评价安全技术措施计划的充分性",{"key":23,"text":530,"correct":25},"工作活动分类→危险源识别→风险确定→风险评价→评价安全技术措施计划的充分性→制定安全技术措施计划",{"key":27,"text":532,"correct":25},"危险源识别→工作活动分类→风险确定→风险评价→评价安全技术措施计划的充分性→制定安全技术措施计划",{"key":30,"text":534,"correct":21},"工作活动分类→危险源识别→风险确定→风险评价→制定安全技术措施计划→评价安全技术措施计划的充分性",{"id":536,"libraryId":5,"type":9,"typeLabel":15,"stem":537,"options":538,"answer":23,"analysis":32},1258350,"某建筑工地，由于施工方法不当，造成安全事故，在此次事故中死亡5人，则该事故属于（ ）。",[539,541,543,545],{"key":19,"text":540,"correct":25},"重伤事故",{"key":23,"text":542,"correct":21},"重大伤亡事故",{"key":27,"text":544,"correct":25},"重大事故",{"key":30,"text":546,"correct":25},"死亡事故",{"id":548,"libraryId":5,"type":9,"typeLabel":15,"stem":549,"options":550,"answer":27,"analysis":32},1258351,"根据《生产安全事故报告和调查处理条例》规定：造成10人以上30人以下死亡，或者50人以上100人以下重伤，或者5000元以上1亿元以下直接经济损失的事故属于（ ）。",[551,552,554,555],{"key":19,"text":540,"correct":25},{"key":23,"text":553,"correct":25},"较大事故",{"key":27,"text":544,"correct":21},{"key":30,"text":546,"correct":25},{"id":557,"libraryId":5,"type":9,"typeLabel":15,"stem":558,"options":559,"answer":27,"analysis":32},1258352,"浇筑混凝土时，自高处倾落的自由高度不应超过（ ）m。",[560,561,562,563],{"key":19,"text":146,"correct":25},{"key":23,"text":510,"correct":25},{"key":27,"text":148,"correct":21},{"key":30,"text":150,"correct":25},{"id":565,"libraryId":5,"type":9,"typeLabel":15,"stem":566,"options":567,"answer":19,"analysis":32},1258353,"根据《生产安全事故报告和调查处理条例》的相关规定，施工单位负责人接到生产安全事故报告后，应当于（ ）h内向县级以上人民政府安全生产监督管理部门和负有安全生产监督管理职责的有关部门报告。",[568,569,570,571],{"key":19,"text":146,"correct":21},{"key":23,"text":148,"correct":25},{"key":27,"text":150,"correct":25},{"key":30,"text":152,"correct":25},{"id":573,"libraryId":5,"type":9,"typeLabel":15,"stem":574,"options":575,"answer":27,"analysis":32},1258354,"（ ）m以上脚手架或设置的挑架，大型混凝土模板工程，还应进行架体和模板承重强度、荷载计算，以保证施工过程中的安全。",[576,578,580,582],{"key":19,"text":577,"correct":25},"20",{"key":23,"text":579,"correct":25},"25",{"key":27,"text":581,"correct":21},"30",{"key":30,"text":583,"correct":25},"40",{"id":585,"libraryId":5,"type":9,"typeLabel":15,"stem":586,"options":587,"answer":27,"analysis":32},1258355,"施工单位对因建设工程施工可能造成损害的毗邻建筑物、构筑物和地下管线等，应当采取（ ）措施。",[588,590,592,594],{"key":19,"text":589,"correct":25},"防范",{"key":23,"text":591,"correct":25},"安全保护",{"key":27,"text":593,"correct":21},"专项防护",{"key":30,"text":595,"correct":25},"隔离",[597,600,603,606,609,612],{"id":9,"name":598,"category":7,"favorite":599},"领导干部任职前廉政法规知识测试题",92,{"id":601,"name":602,"category":7,"favorite":9},595,"建筑结构与设备",{"id":604,"name":605,"category":7,"favorite":9},715,"招标采购专业知识与法律法规",{"id":607,"name":608,"category":7,"favorite":9},848,"市政方向-通用基础",{"id":610,"name":611,"category":7,"favorite":8},534,"BIM工程师",{"id":613,"name":611,"category":7,"favorite":8},535]