[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"q-1259128":3},{"question":4,"library":20},{"id":5,"libraryId":6,"type":7,"typeLabel":8,"stem":9,"options":10,"answer":17,"analysis":19},1259128,842,3,"判断题","已竣工未验收且未实际投人使用的工程的质量争议，双方应就有争议的部分按工程质量监督机构的处理决定执行后办理竣工结算，无争议的竣工结算也应该等争议部分解决后一起办理。（ ）",[11,15],{"key":12,"text":13,"correct":14},"A","正确",false,{"key":16,"text":17,"correct":18},"B","错误",true,"已竣工未验收且未实际投人使用的工程的质量争议，双方应就有争议的部分按工程质量监督机构的处理决定执行后办理竣工结算，无争议的竣工结算不应该等争议部分解决后一起办理。",{"id":6,"name":21,"category":22,"favorite":23},"(土建施工)专业管理实务 岗位知识","建筑工程",0]