[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"q-1259121":3},{"question":4,"library":20},{"id":5,"libraryId":6,"type":7,"typeLabel":8,"stem":9,"options":10,"answer":13,"analysis":19},1259121,842,3,"判断题","在本工程中，当调价系数采用0.9时，代表工程量超过计划工程量的15％后执行的系数。（ ）",[11,15],{"key":12,"text":13,"correct":14},"A","正确",true,{"key":16,"text":17,"correct":18},"B","错误",false,"在本工程中，当调价系数采用0.9时，代表工程量超过计划工程量的15％后执行的系数。",{"id":6,"name":21,"category":22,"favorite":23},"(土建施工)专业管理实务 岗位知识","建筑工程",0]