[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"q-1259108":3},{"question":4,"library":20},{"id":5,"libraryId":6,"type":7,"typeLabel":8,"stem":9,"options":10,"answer":17,"analysis":19},1259108,842,3,"判断题","在施工项目的施工方案选定后，就可编制劳动力、主要材料、构件与半成品、施工机具等各项资源需要量计划。（ ）",[11,15],{"key":12,"text":13,"correct":14},"A","正确",false,{"key":16,"text":17,"correct":18},"B","错误",true,"在施工项目的施工方案选定后，不直接编制劳动力、主要材料、构件与半成品、施工机具等各项资源需要量计划。",{"id":6,"name":21,"category":22,"favorite":23},"(土建施工)专业管理实务 岗位知识","建筑工程",0]