[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"q-1259103":3},{"question":4,"library":20},{"id":5,"libraryId":6,"type":7,"typeLabel":8,"stem":9,"options":10,"answer":13,"analysis":19},1259103,842,3,"判断题","专项工程的进度计划编制应按单位工程的进度计划进行编制。（ ）",[11,15],{"key":12,"text":13,"correct":14},"A","正确",true,{"key":16,"text":17,"correct":18},"B","错误",false,"专项工程的进度计划编制应按单位工程的进度计划进行编制。",{"id":6,"name":21,"category":22,"favorite":23},"(土建施工)专业管理实务 岗位知识","建筑工程",0]