[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"q-1259099":3},{"question":4,"library":20},{"id":5,"libraryId":6,"type":7,"typeLabel":8,"stem":9,"options":10,"answer":17,"analysis":19},1259099,842,3,"判断题","柔性屋面的施工顺序按照找平层→保温层→柔性防水层→保护隔热层依次进行。",[11,15],{"key":12,"text":13,"correct":14},"A","正确",false,{"key":16,"text":17,"correct":18},"B","错误",true,"柔性屋面的施工顺序按照找平层→保温层→找平层→柔性防水层→保护隔热层依次进行。",{"id":6,"name":21,"category":22,"favorite":23},"(土建施工)专业管理实务 岗位知识","建筑工程",0]