[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"q-1259092":3},{"question":4,"library":20},{"id":5,"libraryId":6,"type":7,"typeLabel":8,"stem":9,"options":10,"answer":13,"analysis":19},1259092,842,3,"判断题","在浇筑与柱和墙连成整体的梁和板时，应在柱和墙浇筑完毕后停歇1、1～5h，再继续浇筑。（ ）",[11,15],{"key":12,"text":13,"correct":14},"A","正确",true,{"key":16,"text":17,"correct":18},"B","错误",false,"在浇筑与柱和墙连成整体的梁和板时，应在柱和墙浇筑完毕后停歇1、1～5h，再继续浇筑。",{"id":6,"name":21,"category":22,"favorite":23},"(土建施工)专业管理实务 岗位知识","建筑工程",0]