[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"q-1259083":3},{"question":4,"library":20},{"id":5,"libraryId":6,"type":7,"typeLabel":8,"stem":9,"options":10,"answer":17,"analysis":19},1259083,842,3,"判断题","钢结构工程一节柱的各层梁安装好后，应先焊上层梁，再焊中层梁，最后焊下层梁。（ ）",[11,15],{"key":12,"text":13,"correct":14},"A","正确",false,{"key":16,"text":17,"correct":18},"B","错误",true,"钢梁吊装在柱子复核完成后进行，钢梁吊装时采用两点对称绑扎起吊就位安装。",{"id":6,"name":21,"category":22,"favorite":23},"(土建施工)专业管理实务 岗位知识","建筑工程",0]