[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"q-1259059":3},{"question":4,"library":20},{"id":5,"libraryId":6,"type":7,"typeLabel":8,"stem":9,"options":10,"answer":13,"analysis":19},1259059,842,3,"判断题","对于混凝土阶梯形基础，每一台阶高度内应整层作为一个浇筑层阶应稍停0.5～1h，使其初步获得沉实，再浇筑上层。（ ）",[11,15],{"key":12,"text":13,"correct":14},"A","正确",true,{"key":16,"text":17,"correct":18},"B","错误",false,"对于混凝土阶梯形基础，每一台阶高度内应整层作为一个浇筑层阶应稍停0.5～1h，使其初步获得沉实，再浇筑上层。",{"id":6,"name":21,"category":22,"favorite":23},"(土建施工)专业管理实务 岗位知识","建筑工程",0]